• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 240
  • 34
  • 30
  • 14
  • 8
  • 8
  • 3
  • 2
  • 1
  • 1
  • Tagged with
  • 356
  • 356
  • 228
  • 131
  • 130
  • 127
  • 115
  • 105
  • 90
  • 57
  • 51
  • 49
  • 47
  • 44
  • 44
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
231

Kulturně-společenské centrum Brno-přehrada /téma "Brno-město uprostřed Evropy"/ / Culture and public centre Brno-damlake/Theme"Brno-city in the midle of the Europe"/

Vrágová, Pavla January 2013 (has links)
Cultural and Public Center is located on the dam in Brno dock, addressing the promenade between the marina and Kozí Horka, starting points and bicycle path , and include marine terminal and a natural amphitheater with a restaurant. Promenade is the multilevel net of wheelchair interconnected trails and green spaces with objects of public amenities covered by reinforced concrete shell structure with walkable green roof and with color features as landmarks. The building of the cultural center is fitted in the field wave that rises and opens towards the audience. The back part of the building is composed by field wall with employees' inputs, which forms a barrier between the amphitheater and the bike path behind the building. The object reacts to different heights of promenade's trails by Raumplan arrangement. It is divided into performers' background with store of properties, public toilets and restaurant facilities. The supporting structure is a monolithic reinforced concrete wall system in module 4 m, which carry exposed reinforced concrete shell structure with walkable green roof. The main walls are rotated by 5 °. Overall height ranges from 2700 mm to 4750 mm and headroom ranges from 2300 mm to 3800 mm according to the curved shell structure. Nationwide building foundation by the base plate with circumferential bands into the frost resistant depth is affected by bottom water pressure.
232

Obecní úřad Rapotín / Municipal Office Rapotín

David, Tomáš January 2013 (has links)
The diploma thesis deals with the administrative building, which will serve as a municipal office in Rapotín. The building is designed as an extension to the existing cultural center Rapotín. The building structure is made as a masonry construction with ceiling construction of prestressed panels Spiroll. Single-layer flat roof is divided into two levels, the lower part is extensive green roof and the top of the roof is made such as usual flat roof. The building has two floors and partial basement coverage as well. The building is provided with four sheltered parking lots.
233

Domov pro seniory / Home for the elderly

Čunek, Jiří January 2013 (has links)
Subject of this Master thesis is project of new building Home for the Elderly. Object has 3 overgrounds floors. Part of the object has a cellar. There is also restaurant which is covered green roof. Another parts of objects are covered by flat roof. Home for the Elderly is well connected with nature. Capacity of the home is 26 seniors. Most apartments are for singles.
234

Sportovně relaxační centrum / Sports and Relaxation Centre

Červená, Hana January 2014 (has links)
This thesis details the building design blueprints and associated project documentation for a sports and leisure center in the town of Holesov. The building consists of 2 floors and a basement. In the basement there are rooms for sporting and relaxation activities and a staff room for employees. There is a reception and restaurant in the first floor. The last floor contains massage parlors and solariums with the inclusion of a VIP lounge. This dissertation includes an architectural study and technical specifications for the sanitary engineering and concrete structures of the building. The latter of which includes the calculations for the cross reinforced concrete platform.
235

University Residential Centre / University Residential Centre

Dvořák, Petr January 2014 (has links)
University Residential Centre is the theme of this Master's thesis. The aim was to create a building, which will provide comfortable living and learning to students. The building has three floors - there are student apartments for one to four people in the upper two floors. The ground floor is dedicated to educational purposes. It contains a library and two lecture halls. From the constructional point of view, the structural system is a reinforced concrete skeleton. Main vertical elements are columns and main horizontal are two-way reinforced slabs. Utilization of glass facade and innovative type of thermal insulation can be found interesting.
236

Sport & relax centrum / Sport & relax centre

Sobotka, Martin January 2014 (has links)
Object SPORT & RELAX CENTER is a new building made by reinforced concrete monolithical skeleton. Filling masonry is creating with porous concrete blocks YTONG. Thermal insulation is attended by blocks made from mineral wool. Facade is ventilated and made from fibre cemented blocks. Object has two floors and cellar. The foundations are reinforced concreting monolithical stretches and foots. The stairs are three-arm monolithical reinforced concrete. Object is roofed by flat one-housing roof, over restaurant part is intensive green roof and terrace with ceramic tile.Object is supposed to use for sports and relaxation needs for the public of Chotěbor’s city and vicinity. In first floor we can find two courts for squash, restaurant with the terrace, in second floor is fitness center and in 1S we can find wellness center (massages, relaxing baths, whirlpool, relaxing room, 3 kinds of sauna-finland, steam and steam solt sauna). On the east and the south part of the parcel will be providing parking lot for visitors and employees. On the west part of the parcel is enter for supply. On the north are situated 2 courts and a volleyball pitch. The rest of the parcel cover light grass.
237

Sportovní centrum / Sports center

Smutný, Květoslav January 2014 (has links)
This thesis deals with the detailed documentation of the sports center . Estimated location of this building is on the property number 136/15 in Karlovy Vary in the cadastral Tuhnice in the Karlovy Vary region. Currently, land without regular use. The land is owned by the investor. Newly built three storey sports center will serve the large kinds of sports activities. The sports center will offer the first floor , two multipurpose rooms , for example, aerobic , spinning , heat, zumba and other sports, the climbing wall and two squash courts and in the second floor of the gym and two multi-purpose halls . The first floor will also find a restaurant with two bowling lanes . The project was based on the layout of the study and the project planning permission . The result of this work is to complete detailed documentation, which includes a drawing of the situation , floor plans , sections, elevations , drawings, foundations , ceilings , roofs, stairs and details. Furthermore, a technical report , extracts elements of fire safety of the building and thermal assessments of buildings.
238

Polyfunkční dům Brno Mlýnská / Multifunctional Building Brno - Mlýnská

Hrubý, Libor January 2015 (has links)
Diploma thesis deals with a new built multifunctional building in Brno on Mlynska street. The intention is to change of use of lucrative corner site brownfield. The new building has four aboveground floors and one underground floor. The ground floor will have small restaurant and two separated shopping units. The second floor is divided into three office spaces. The third and fourth floors are designed as flats of different categories. The underground floor will be used for storage spaces, boiler room with separate pellet storage and parking shaft system. Construction system is designed as a wall construction system made of sand-lime bricks. Ceiling constructions and staircases are designed as a cast-in-place concrete. The building is roofed with the flat green roofs and terrace, which will be used for relaxation of residents.
239

Mateřská škola v pasivním standardu / Nursery school in passive standard

Výtisk, Jiří January 2015 (has links)
Subject of this diploma thesis is a new building of nursery school in passive standards. The school has two floors. On both floors there are build two classes, each for twenty children. Structure is based on strip foundations and load-bearing walls are made from sand-lime blocks. The horizontal load-bearing structures are from cast-in-place reinforced concrete. School has green flat roof and above atrium has sloped roof. The shape of building is made by three circle segments with different radius. Ventilation of the building is ensured by heat recovery ventilation unit. Project is situated into an urban area of Brno, nearby the city center, on brownfield plot.
240

Areál společnosti TOPWET / TOPWET company headquarters

Vítková, Kristýna January 2015 (has links)
This is a detached office building with halls located in an industrial zone. The building is situated in Ostrovačice. The office building has two floors without cellar. There are an entrance hall with reception, three office rooms, kitchen with dining room, archives, restrooms and technical background on the first floor. There are one office room, office of managing director, office of traders, boardroom, training room, kitchen and restrooms on the second floor. From the entrance hall you can climb from double staircase to the roof. The building is covered by single-layer flat roof. This is extensive green roof. The building is based on the footings of plain concrete and is built from the building system POROTHERM with contact insulation system from company ISOVER. The office building has a production and storage hall. There are an entrance hall, dressing room for men and other also for women with shower, separate toilets, kitchen with dining room and engine room of ventilation in production hall. Built-up area is totally 1926,6 square metres.

Page generated in 0.0503 seconds