Spelling suggestions: "subject:"2around control (mining)"" "subject:"4wsground control (mining)""
11 |
Validation of a dynamic simulation of an opencast coal mineMuniappen, Kesavan January 2019 (has links)
A research report submitted in partial fulfilment of the requirements for the degree of Master of Science in Engineering, to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, Johannesburg, 2019 / A dynamic simulation study is a critical deliverable of a mine project feasibility study. Mining houses rely on simulation to confirm that complex, integrated systems can achieve design capacity before investment decisions are made. Dynamic simulations are powerful tools, but only if they are developed using the right methodology, and with information that has been verified. The importance of work in the field of mine dynamic simulation validation was made clear during the early stages of this research report when it was identified that there is limited information available on the subject. Work conducted in the realm of validation can make an invaluable contribution to the success of future projects undertaken around the world.
The last few years have been difficult for employees of some mining companies because of looming job cuts due to high production costs, high overheads, and decreasing product demand. For many mining companies, it was a case of survival which gave rise to the development of new strategies and innovative thinking. Coal Mine A Life of Mine (LOM) extension project is a prime example of innovative thinking. In this case, the project was approved for implementation when export coal prices were on the low end of the price cycle. The dynamic simulation of the full materials handling value chain conducted during the project was of utmost importance, and provided assurance to the project review team that annual production targets can be achieved.
The simulation development methodology was based on a unique approach that reduced time spent on the simulation through the integration of different, independent models that represented sub-systems in the materials handling value chain. There was, therefore, a strong need to validate the simulation, which could lead to the adoption of this approach on future projects. In this research report, the LOM extension project scope and the mining activities conducted by Coal Mine A are explained, and a brief, but interesting history of Modelling and Simulation (M&S) is provided. The subject of M&S is vast and has evolved into its own separate discipline. M&S is an invaluable tool, and the importance of verification, validation and credibility is elaborated on. The development of the simulation and the inputs and outputs of the simulation are discussed before the validation effort.
The work conducted on the validation aimed to confirm the accuracy of the simulation unequivocally. Although the production target was not achieved as predicted by the dynamic simulation during the period of validation, there was an indication that the materials handling value chain could perform as predicted as each of the individual sub-systems had achieved the design capacity. Problem areas were identified which could be attributed to the poor performance, and if these areas are addressed, the system could perform as predicted by the simulation. This confirms that dynamic simulation can add value to predictions about mining system performance such that informed decisions can be made. / TL (2020)
|
12 |
3-D numerical simulation and design of tensioned roof bolting for underground coal minesZhang, Yunqing, January 1900 (has links)
Thesis (Ph. D.)--West Virginia University, 2003. / Title from document title page. Document formatted into pages; contains xiv, 183 p. : ill. (some col.). Vita. Includes abstract. Includes bibliographical references (p. 179-182).
|
13 |
Effect of in-situ stresses on the stability of coal mine development workingsGadde, Murali Mohan. January 2003 (has links)
Thesis (M.S.)--West Virginia University, 2003. / Title from document title page. Document formatted into pages; contains xii, 130 p. : ill. (some col.), map (part col.). Includes abstract. Includes bibliographical references (p. 127-130).
|
14 |
A study of potash mining methods related to ground control criteria /Molavi, M. A. January 1987 (has links)
No description available.
|
15 |
Evaluation of long-hole mine design influences on unplanned ore dilutionHenning, John Gordon. January 2007 (has links)
Unplanned ore dilution or stope overbreak, which has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation, can be attributed to both the mining process and to geologic setting. The research undertaken in this document, applicable to a wide range of underground mines employing the blasthole mining method to extract tabular orebodies, focuses on examining factors attributable to the generation of unstable stope hanging-walls. / The primary objective of the research undertaken is to establish new models for stope and orezone design, with respect to anticipated stope overbreak, focusing on the position and type of stope within the orezone extraction sequence. Identified factors influencing unplanned dilution, such as: induced stress environment, stope geometry, and the setting of individual stopes are considered. / The research undertaken incorporates a variety of components, including (i) parametric 3-D numerical modelling to examine influences of individual factors on hanging-wall overbreak, (ii) case example analysis, and (iii) orezone extraction sequence simulation, using 3-D elastic numerical modelling. Design criteria, developed from the parametric modelling, was applied to the orezone sequence modelling to develop trends for stope dilution, as functions of stope design and construction. / It was found that hanging-wall overbreak is not significantly influenced by depth alone, and that stopes with large vertical and short horizontal dimensions or stopes having long horizontal and short vertical dimensions are more stable than large square-like stopes. Also, through parametric and case studies, it was demonstrated that, in addition to stope dimension, the amount of unplanned dilution differed according to stope type. Five stope types were identified, based on their position within a tabular blasthole mining sequence. Measured overbreak varies with stope type, with secondary stopes generating a greater volume of hanging-wall dilution than do primary stopes. A pillarless mining sequence will generate less overall dilution than a primary stope: secondary pillar mining sequence.
|
16 |
Development of a high-resolution target movement monitoring system for convergence monitoring in minesJones, Tristan H. January 2008 (has links) (PDF)
Thesis (Ph. D.)--Missouri University of Science and Technology, 2008. / Vita. The entire thesis text is included in file. Title from title screen of thesis/dissertation PDF file (viewed May 6, 2008) Includes bibliographical references (p. 229-235).
|
17 |
Reliability-based method for stability of mine entry design and evaluationSun, Zhouming, January 2000 (has links)
Thesis (Ph. D.)--West Virginia University, 2000. / Title from document title page. Document formatted into pages; contains xi, 162 p. : ill. (some col.). Vita. Includes abstract. Includes bibliographical references (p. 156-161).
|
18 |
Development of real time roof geology detection system using drilling parameters during roof bolting operationTang, Xianguang. January 1900 (has links)
Thesis (Ph. D.)--West Virginia University, 2006. / Title from document title page. Document formatted into pages; contains xvi, 357 p. : ill. (some col.). Vita. Includes abstract. Includes bibliographical references (p. 132-124).
|
19 |
Integrated stability mapping system for minesWang, Quanxi, January 2005 (has links)
Thesis (Ph. D.)--West Virginia University, 2005. / Title from document title page. Document formatted into pages; contains ix, 145 p. : ill. (some col.), maps (some col.). Vita. Includes abstract. Includes bibliographical references (p. 118-122).
|
20 |
Weak floor stability in the Illinois Basin underground coal minesGadde, Murali Mohan. January 1900 (has links)
Thesis (Ph. D.)--West Virginia University, 2009. / Title from document title page. Document formatted into pages; contains xx, 393 p. : ill. (some col.), maps (some col.). Vita. Includes abstract. Includes bibliographical references (p. 356-371).
|
Page generated in 0.113 seconds