Spelling suggestions: "subject:"highway planning most control"" "subject:"highway planning cost control""
1 |
Heuristic rules for highway design and management.Van Every, Bruce Edward January 1976 (has links)
Thesis. 1976. M.S.--Massachusetts Institute of Technology. Dept. of Civil Engineering. / Microfiche copy available in Archives and Engineering. / Bibliography: leaves 116-118. / M.S.
|
2 |
A framework for computer-based cost evaluation of highway projects in developing countries.Fay, Jean-Michel January 1976 (has links)
Thesis. 1976. M.S.--Massachusetts Institute of Technology. Alfred P. Sloan School of Management. / Microfiche copy available in Archives and Dewey. / Bibliography: leaves 135-138. / M.S.
|
Page generated in 0.1001 seconds