• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 149
  • 33
  • 6
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 221
  • 221
  • 221
  • 86
  • 80
  • 64
  • 54
  • 53
  • 52
  • 45
  • 41
  • 33
  • 33
  • 32
  • 26
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

A critical analysis of sustainable human settlement in housing: the case of Hlalani, South Africa

Nkambule, Sipho Jonathan January 2013 (has links)
As a result of apartheid’s history, the current South African government was initially faced with two major challenges in the development of sustainable human settlement in urban areas: delivering the quantity of houses needed to reduce the massive housing backlog (notably in black townships) and overcoming the problem of racially-based spatial separation inherited from the apartheid era. To rectify the legacies of apartheid, the state has sought to pursue a massive housing programme in urban areas for poor urban blacks. In doing so, though, it has worked within the confines of the racially-segregated South African city and has adopted a macro-economic policy with a pronounced neo-liberal thrust. This thesis examines the South African state’s housing programme with reference to questions about social sustainability and specifically sustainable human settlements. It does so by highlighting social capital and the different forms it takes, notably bonding, binding and linking capitals. This is pursued through a case study of a small area of a black township in Grahamstown called Hlalani. The case focuses on the lived experiences of Hlalani residents and their intra-household and inter-household relations as well as their linkages with local state structures. It is concluded that social capital is weak and incipient in Hlalani and that Hlalani could not, by any definition or measurement of the term, be labeled as a sustainable human settlement.
32

The role of RDP housing in revitalising the socio-economic environment

Ntlangula, Zininzi January 2015 (has links)
The role of RDP housing cannot be underestimated and it plays a big role in South Africa. It assists those who are less fortunate to afford to buy houses. RDP housing delivery is not only expected to put a roof over people's heads but to change their lives in various ways. RDP housing delivery tackles issues related to social and economic enviroment. In terms of policy documents and surveys, research has shown that it is critical to incorporate RDP housing beneficiaries from planning right up to development stage. Public participation and the involvement of beneficiaries from the planning stage onward assists in determining the basic needs of the community that can be addresed through RDP housing development. This study is about the role of RDP housing in revitalising the socio-economic environment with a specific reference to Second Creek, which is under the jurisdiction of Buffalo City Metropolitan Municipality.
33

Living condition in informal settlements: the case of Imizamo Yethu informal settlement in Cape Town, South Africa

Jikazana, Mzobanzi Elliot January 2006 (has links)
The study examines the issue of living conditions in informal settlements, using the case study of Imizamo Yethu informal settlement in Cape Town. Affordability, lack of space, job related issues, a relatively small formal housing stock available in many urban centres, and deregulation, in terms of both access to land and finance, forced lower income groups to seek accommodation in informal settlements. Here people are exposed to unhealthy living conditions. The study reveals that living in informal settlements often poses significant health risks. Sanitation, food storage facilities and drinking water quality are often poor, with the result that inhabitants are exposed to a wide range of pathogens and houses may act as breeding grounds for insect vectors. In informal settlements people often live in temporary homes constructed with impermanent, basic materials. These inhabitants frequently have little option but to live on marginal land (flood plains or steep slopes, for example), with the consequence that they are the first to suffer the effects of cyclones and floods. In addition, a combination of overcrowding, the use of open fires and flammable buildings leads to danger from accidental fires, burns and scalding. The post-apartheid South African government has tried a number of housing initiatives to help alleviate the housing problem since 1994 when it came to power. These have included the Botshabelo Accord (1994), the Housing White Paper in 1995, the National Urban and Reconstruction Housing Agency in 1995, the Housing Subsidy Scheme in 1995, the Housing Act No. 107 of 1997 and the Policy on People’s Housing Process (1998). The government set itself a target of delivering one million houses within five years. By all indications the government did not fully comprehend the gravity of the problem in relation to available resources. In 2004, the Department of Housing declared its intention to eradicate informal settlements in South Africa by 2014. This followed the unprecedented housing backlog, proliferation of informal settlements, social exclusion and the inability of municipalities to provide basic infrastructure to urban poor households. However, despite these bold interventions by government, the study demonstrates that the provision of low-cost housing can be viewed as a wicked problem. Wicked problems are described to be “ill-defined, ambiguous, and associated with strong moral, political and professional issues”. The study, therefore, concludes that given the complexities surrounding the provision of low-cost housing in South Africa, the government’s ambitions to resolve housing backlogs by 2014 appear to be a far-fetched dream.
34

Problems experienced by project managers on housing projects

Mtshekexe, Ntombesibini Octavia January 2014 (has links)
Housing projects are amongst the South African (SA) Government’s major focus points with reference to budgeting for its financial years. The delivery of these housing projects is taking place at a slower rate than anticipated due to the problems experienced in the processes involved in their management. The project management shortcomings are a major setback with reference to the delivery of houses to the communities. It is, however, stated by the Constitution of the Republic of South Africa (RSA) that every South African citizen has a right to housing and that the Local Government, as the closest entity to communities, must do whatever it possibly can to ensure timeous service delivery to its communities. The objective of this research is to ascertain the nature and extent of project management problems experienced by municipal project managers, the impact thereof and potential solutions to the identified problems. The study is intended to advise on possible ways to address project management problems arising during the implementation of housing projects in the Nelson Mandela Bay Municipality (NMBM) through investigation and analysis of information gathered in both theory and practice. Project management is a process of controlling the achievement of project objectives through the application of knowledge, skills, tools and techniques. For a housing project the main objective is to deliver safe, quality houses on time and within budget. Problems which hinder the delivery of housing projects relate to cost, time and the quality of housing projects delivered. The fact that these key project objectives are not met needs to be addressed urgently in order to improve the housing delivery. The literature reviewed and the feedback from the surveys; indicate that these problems have a vast impact on housing projects. The survey also reveals that it is not only housing Project Managers (PMs) that are unable to perform well, but also other parties involved in the project management of housing projects and which play a great role in project management failures of housing projects. Some of these parties are consultants and contractors. The lack of performance by project managers affects the delivery of houses negatively in the NMBM.
35

Housing backlogs in King Sabata Dalindyebo with specific attention to the housing problem at Bongweni Administrative Area in Mthatha

Hlazo, Mthethuvumile January 2014 (has links)
The study investigates problems affecting housing delivery in King Sabatha Dalindyebo Municipality Local Municipality. The housing development in this area is not up to standard. This situation is worse in rural areas where housing projects have been obstructed by lack of infrastructure and other essential services. This is a serious problem that this local municipality is facing; the most vulnerable are the poor, residing in these rural areas. The study has investigated this problem in King Sabatha Dalindyebo Municipality Local Municipality with specific attention to Bongweni Administrative Area in Mthatha. The investigation indicates that there are serious challenges facing housing.
36

A critical analysis of current housing and accommodation practices in the gold mining industry : the case of JCI

Hunter, Peter Mathew January 1991 (has links)
Bibliography: pages 120-128. / This study outlines and discusses recent changes in employer housing practices in the South African gold mining industry. Beginning in the 1970s, but more particularly in the 1980s, a number of factors compelled employers to introduce alternatives to the system of hostel accommodation. South African migrant workers now have access to a broader range of housing options including home ownership schemes and off-mine rental schemes. These initiatives are critically examined and their implications for workers and the migrant labour system are assessed. A general overview of the housing policies of the six major mining groups is provided, with a more detailed focus on the labour practices of Johannesburg Consolidated Investment Company Limited. At present, participation rates in management devised accommodation schemes remain low. It appears that existing schemes do not fully meet the needs and preferences of migrant workers. Affordability and migrant attitudes towards permanent relocation to the urban areas are two important considerations in this regard. A number of other obstacles to the implementation of a flexible housing model for the African workforce are identified. A central conclusion of this study is that progress towards a locally housed industry workforce will continue to be slow. The migrant labour system will undergo further transformation, but will continue as the central form of labour supply to the mines.
37

Project implementation of the hostel upgrade programme in the city of Johannesburg

Fenyane, Tebogo Wiiliam January 2016 (has links)
Research report submitted in accordance with the degree Masters in Management University of the Witwatersrand Public and Development Management , July 2016 / Originally, hostels were developed to accommodate migrant labour in urban areas. With the abolishment of influx control laws in 1986, informal settlements mushroomed close to hostel precincts as relatives and those seeking affordable housing in proximity of employment opportunities flocked to urban areas. Overcrowding, poor maintenance of hostels and the vandalism of the infrastructure resulted in hostels deteriorating and becoming unfit for hygienic human habitation. From the early 1990’s, the government adopted a number of measures (housing programmes) aimed at rehabilitating hostels and converting them into family units. The Hostel Redevelopment Programme as implemented to date has led to upgraded units being built but not allocated to the intended beneficiaries (hostel residents). This failure was partly the result of communication breakdown between hostel communities and local communities. This study attempts to comprehend factors that led to project communication breakdown between the project team and the hostel community. The Johannesburg Housing Company (JOSHCO) is the implementation agent on behalf of the City of Johannesburg tasked with converting single gender hostel compounds into affordable rental units. The report suggested public participation as the suitable process to solve the problem of communication between different actors in the hostel project. The legal framework of public housing emphasises the importance of public participation in the programme of housing provision. The discourse on public participation conceptualises community participation broadly as a strategy aimed at empowering citizens to have a voice in policies decisions that have a bearing on their lives. The legal framework espouses the philosophy of citizen’s involvement in developmental matters having the right to having their views reflected in policy decisions. This study tries to understand the effectiveness of the hostel redevelopment programme public consultation processes in influencing housing option provided to the residents of Diepkloof Hostel and the Orlando West Women’s Hostel. The design of this study is conceptualised using Project Management principles or knowledge areas, focusing specifically on Project Communication. The researcher is of the view that improving the effectiveness of the public participation process, factors that result in the non- occupation of hostels can be avoided. With the massive housing backlog still prevalent in South Africa, consensus is required between all stakeholders (especially hostel residents) on the type of units that are acceptable to the hostel community to provide for successful allocation process, thereby resulting in a successful handing over of housing products that will be sustainable in terms of affordability and give recipients the dignity of adequate shelter. / MT 2018
38

Understanding informal settlements in South Africa: the waterworks informal settlement profile and responses

Nkoane, Adelaide 10 1900 (has links)
A Research report submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, in partial fulfilment of the requirements for the degree of Master of the Built Environment in Housing, October 2019 / Understanding the proliferation of informal settlements in South Africa is significant because they have been a feature of our landscape for many years and will continue to be in the future in spite of the attention given to the issue of housing by the government through various housing delivery interventions. Studies have indicated that informal settlements provide shelter for a large number of people who are the poor urban dwellers. There are gaps in literature that demonstrate the distinction between informal settlements within the South African context, despite years of research conducted on informal settlements. The differentiation of informal settlements contests the homogeneity of informal settlements that fall into groupings and sub-categories that require targeted interventions specific to their contexts. The Housing Development Agency (HDA, 2012) “is mandated to assist organs of State with the upgrading of informal settlements”. One of its key activities is to profile informal settlements, particularly in mining towns, in order to understand the data “relating to the number of informal settlements, profile of residents, length of stay, aspirations, income groups, education status” (HDA, 2012:12). Using this set of distinctions, this research aimed to understand the characteristics, dynamics and nature of the Waterworks informal settlement and where it lies within the bigger narrative of informal settlements. It therefore investigated the settlement’s demographics, history, the reason for its existence, how it is understood by its residents, how it is understood in relation to scholarly articles and how it could be understood through government plans. / PH2020
39

An invistagation of the factors reguired to improve the quality of low-cost houses in eThekwini Municipality, KwaZulu Natal

Nqentsu, Luleka January 2017 (has links)
Thesis is submitted in partial fulfilment for the degree of Master of Science in Building (Construction Project Management) to the Faculty of Engineering and the Built Environment, School of Construction Economics and Management at the University of the Witwatersrand, Johannesburg, 2017 / Access to housing and safe accommodation is an essential part of the South African government’s commitment to poverty relief and the improvement of the wellbeing of its people. Despite the substantial commitment and progress by the South African government towards ensuring adequate housing, much still needs to be done to combat the existing challenges facing the low-cost housing industry. Amongst various challenges, the low-cost housing sector faces challenges of poor quality houses. The level of dissatisfaction due to poor quality appears to be dominant in the low-cost housing sector. These challenges are crucial as the impact is severely noticeable, both socially and economically. The literature reviewed and the data collected is indicative that the use of emerging contractors who are likely inexperienced in the construction of low-cost houses is one of the major contributing factors to the poor quality of the end product. Emerging contractors form a majority of the construction contractors in the country and have been identified to play a vital role in the construction of low-cost houses. Constraints experienced by emerging contractors are posing risk to the projects and pose a challenge to the successful completion of these projects. The under-development of emerging contractors has resulted in poor workmanship and poor quality low-cost houses. Subsequent to the identified problem areas, this study on investigation of the factors required to improve the quality of low-cost houses in eThekwini municipality, KwaZulu Natal was initiated. The research objectives pursued by this study aimed to compare the contributing factors to the poor quality of low-cost houses as perceived by housing project managers and emerging contractors; to compare key factors that can be improved to enhance the quality of low-cost houses as perceived by project managers and emerging contractors; and to identify quality management mechanisms currently available in the construction of low-cost houses and determine their influence level. A mixed research methodology was employed, using the survey method as the research design and data collection, through semi-structured questionnaires. The questionnaires were hand delivered to forty (40) participants and twenty seven (27) 2 2 responses were received and analysed, which comprised ten (10) project managers and seventeen (17) emerging contractors. Results from the study showed that there are undeniably issues of poor quality that include foundation failures, structural cracks and leaking roofs in the low-cost housing sector in eThekwini, KwaZulu Natal. It is evident from the analysis that there are many probable underlying causes to the poor quality of low-cost houses, which include: lack of continuous development for emerging contractors; insufficient subsidy amounts; the use of inferior materials; and the use of unskilled labourers on site. The results of the study indicated that shortcomings exist in terms of the necessary skills among emerging contractors, which means there is a huge need for continuous training on different important skills. The need for training of emerging contractors is enormous and that all aspects in terms of training should be considered to be of equal importance. It can also be determined that there is a lack quality management framework within the department and the municipality. These quality management frameworks need to be developed to ensure improvement in quality of the low-cost houses. / XL2018
40

The impact of government housing subsidies in Alexandra-Gauteng

Mokgwatsana, Edwin Ntwampe 09 1900 (has links)
The purpose of the study was to investigate and examine the impact of the government housing subsidies in Alexandra, Gauteng, in terms of improving the socio-economic conditions of poor people. The ANC government promised to change the material conditions of people by among other things eliminating poverty when it ascended to power. Access to adequate housing is regarded as a fundamental right in terms of the prescripts of the South African constitution. By implication the government has a developmental duty to provide housing to eligible citizens. A policy decision by government in 1995 to provide housing subsidies to poor households, particularly those earning between R0-3500 rand provided a significant catalyst in the objective to improve the socio-economic conditions of poor people. That is why the study was conducted in the Alexandra Township, given the proximity of the area to affluent suburbs such as Sandton. This also provided a perfect case study to measure the effectiveness of the housing subsidy system and how the system has been managed to maximise the housing delivery impact in terms of outcomes. In terms of research findings, the expectation was that delivery of low cost housing using government subsidies should not have experienced problems on housing delivery backlogs and administrative blockages. The research results revealed that the failure to quickly improve the socio-economic conditions of poor people through providing adequate housing and creating a progressive environment to create and access job opportunities has exacerbated the state of poverty, which perpetuates dependency on state assistance. The research findings further showed that there is no conclusive evidence that many if not all beneficiaries were using their subsidised house as an asset in terms of leveraging it to improve their financial position; and that there is still a high level of dependency on government for assistance even on maintenance of these units, especially after taking ownership. This has exposed a grave lack of knowledge or information on the side of beneficiaries on how to utilise the house as an asset in order to be progressive as far as improving social and economic conditions. The overall research results demonstrated that vi the existing low cost housing funding model (in Gauteng) is not sustainable in terms of delivering subsidised housing units; and significantly improving the quality of life and standard of living of poor people. In terms of limitations, the study took to account that the new government needed enough time to translate policy into concrete implementable ideas as far as housing was concerned, hence the period of study was from 1995 to 2012. This study is important because its findings contribute knowledge in the field of Public Administration and housing literature; and also assists the Department of Human Settlements (DHS) to explore recommended solutions to improve the Housing Subsidy System. Most importantly, the study provides valuable data relating to the impact of government housing subsidies, including challenges on housing allocations and subsidies management. The study concludes with recommendations on what an effective government subsidy programme should look like. This provides an opportunity to review the entire government subsidy system, as recommended in the National Development Plan (NDP) 2030 vision. The government of the day needs to urgently review the existing grant and subsidy regime for housing with a view to ensuring diversity in product and finance options that allows for more household choice and greater spatial mix and flexibility. Moreover, government should ensure that state funding does not support the further provision of non-strategic housing investments in poorly located areas. / Public Administration / D.P.A.

Page generated in 0.0955 seconds