• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Husdeklaration av Stadiums nya distributionscentral / Description of Building Materials used in Stadium´s new Distribution Centre

Landberg, Niklas January 2006 (has links)
<p>The distributioncentral of Stadium has an area of 31,6 acre and is being build in Herstadberg in the region of Norrköping. It is Mattssons Fastighetsutveckling (Mattssons Real-estate development) who also has ordered the building. They will also take care of the operation and support of the distributioncentral. Peab has got the assignment as a total contractor and it is for them I have done my degree project.</p><p>I have been drawing-up a description of the goods in the distributioncenter. In the declaration a description of the goods will be found, there substance for all the materials that has been built in to the building describes. All the descriptions of the goods has been put together in folders. If some of the sustance could be found in Peabs list of liquidate and forbidden materials, that can also been seen in the folders. The project should also result in folders for operation and support for the distributioncenter. In the work I have hade many contacts with contractors, assemblers and suppliers. Everybody has helpt me get hold of all the documents I have needed. When it comes to operation and support, many of the bigger contractors and assamblers will put together there own instructions in folders, and then deliver them to the orderer in connection with the final inspection. The documents from from remaining contractors, assemblers and suppliers will I put together in a folder.</p><p>After this work I have detected that the head of the contract, who has the responsibility for the declaration of goods dont have the time that needs. A person have to be appointed as responsible for the declaration. A full time employed is not needed, at the most a halftime.</p> / Den engelska titeln i uppsatsen (pdf-filen) är felaktig och ska vara "Description of Building Materials used in Stadium´s new Distribution Centre".
2

Husdeklaration av Stadiums nya distributionscentral / Description of Building Materials used in Stadium´s new Distribution Centre

Landberg, Niklas January 2006 (has links)
The distributioncentral of Stadium has an area of 31,6 acre and is being build in Herstadberg in the region of Norrköping. It is Mattssons Fastighetsutveckling (Mattssons Real-estate development) who also has ordered the building. They will also take care of the operation and support of the distributioncentral. Peab has got the assignment as a total contractor and it is for them I have done my degree project. I have been drawing-up a description of the goods in the distributioncenter. In the declaration a description of the goods will be found, there substance for all the materials that has been built in to the building describes. All the descriptions of the goods has been put together in folders. If some of the sustance could be found in Peabs list of liquidate and forbidden materials, that can also been seen in the folders. The project should also result in folders for operation and support for the distributioncenter. In the work I have hade many contacts with contractors, assemblers and suppliers. Everybody has helpt me get hold of all the documents I have needed. When it comes to operation and support, many of the bigger contractors and assamblers will put together there own instructions in folders, and then deliver them to the orderer in connection with the final inspection. The documents from from remaining contractors, assemblers and suppliers will I put together in a folder. After this work I have detected that the head of the contract, who has the responsibility for the declaration of goods dont have the time that needs. A person have to be appointed as responsible for the declaration. A full time employed is not needed, at the most a halftime. / Den engelska titeln i uppsatsen (pdf-filen) är felaktig och ska vara "Description of Building Materials used in Stadium´s new Distribution Centre".

Page generated in 0.0789 seconds