• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • 5
  • 2
  • Tagged with
  • 16
  • 16
  • 8
  • 8
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Příprava realizace skladovací haly v Kuřimi / Preparation of a warehouse building in Kuřim

Přikryl, Jan January 2019 (has links)
The subject of my diploma thesis is preparation of the realization of a warehouse situated in Kuřim. The work contains technological regulations for the construction of the reinforced concrete skeleton and the realization of the industrial floor, the design of the main machines and mechanisms including the time deployment, the detailed time schedule of the main building object SO 101.3 Hall B, time schedule and financial plan of the building – the objects one. Due to the scale of the work, documents relating to safety and quality control are also processed. Further, the technical report of the site equipment, including drawings, is processed. In the chapter, which provides space for other assignments, the OSH plan is elaborated, the budget of object SO 101.3 Hall B, Safety measures for the installation of reinforced concrete skeleton. The last point of the diploma thesis deals with specialization in the field of realization of inland communication.
12

Stavebně technologická příprava skladového a administrativního objektu v Černé za Bory / Construction-Technological Preparation of Warehouse and Administrative Building in Černá za Bory

Štěpánek, Michal January 2020 (has links)
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project of construction site equipment and the main design of machines and mechanisms. Furthermore, I created a variant solution of skeleton assembly including financial and time evaluation. Since the project documentation that was provided to me did not include any details for the skeleton placement, I decided to develop design details for the skeleton placement. Subsequently, I developed a plan for occupational safety and health. As a part of this work I made a comparison of industrial floors, both in terms of performance and economic. In order to find out the time demands, I prepared an exact timetable for the implementation of the main building. In order to ensure high safety and quality, I prepared a control and testing plan for the assembly of the skeleton and for the implementation of industrial flooring.
13

Autodílny s autoškolou / Car repair shop and driving school

Podola, Lukáš January 2015 (has links)
The goal of this diploma thesis is to partly elaborate the project documentation of a car repair shop. The building is situated in Hranice (Přerov district) next to the industrial estates near a town part called Nová. It is a three storey building with two aboveground floors and a basement. The building is divided into two parts. The industrial part is designed as prefabricated structure and the non-industrial part is designed to be bricked in Wienerberger Porotherm system. The building is intended for maintenance and repair of racing cars. There are also the office spaces for the company's management and a room for a driving school in the building.
14

Stavebně technologický projekt dostavby výrobní haly v Drnovicích / Construction technological project completion of production hall in Drnovice

Doruška, Jan January 2016 (has links)
This master’s thesis contains selected parts of construction-technological project of completion for a manufacturing hall in Drnovice. Based on the documentation used, the focus is aimed mainly at the technological report for the project and its coordination with broader relations of transport routes. Beside these topics, we discuss time and financial plans of the construction, equipment on the construction site, a proposal of main building machinery and mechanisms and the time plan of the main construction project. Furthermore, we provide a technological instructions, control trial plan for installation of a metal construction and façade panels casing, together with a comparison of industrial floors.
15

Příprava a organizace výstavby výrobního areálu / Preparation and organization of the production area's construction facility

Řeháček, Martin January 2013 (has links)
This master’s thesis relate to the preparation and organization of the production area’s construction of the SPEDUR company in Žďár nad Sázavou. The thesis contents technical report on the construction technological project, construction site, time plans, project of the equipment site, draft of the mechanisms, control and testing plan, environmental plan, risks of safety and health at work and calculation for this construction.
16

Stavebně technologický projekt výrobní haly Massag v Bílovci / Construction technological project of factory hall in Bílovec

Carbol, Štěpán January 2017 (has links)
This thesis addresses the construction of steel buildings in Bílovec. In this work we are solved structurally technological study of the construction of steel buildings. The work deals with the traffic situation around the building and a landing distance. The thesis focuses on the installation for the steel skeleton and industrial floors of wire reinforced concrete, time and financial plan, project, site equipment, design of main construction machines and mechanisms, timelines, capital construction object, then control plan for the steel skeleton and industrial floor. Moreover, it is processed itemized budget including bills of quantities, Risk Plan for the steel skeleton and industrial flooring and design details. The basis for this work was the design documentation for the realization of this project.

Page generated in 0.0537 seconds