• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • Tagged with
  • 9
  • 9
  • 7
  • 7
  • 6
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Industrialização das construções complexas: estudo de obras hospitalares / Industrialization of complex construction: a study of hospital buildings

Pereira, Debora Verniz 17 December 2012 (has links)
O tema \"Industrialização das Construções\" está atrelado à ideia da busca constante por novas tecnologias e pelo oferecimento de edificações construídas com mais agilidade, menor custo e maior qualidade. O trabalho do arquiteto brasileiro João Filgueiras Lima pode ser tomado como um exemplo da experimentação industrial na construção. A presente dissertação tem por objetivo o estudo da industrialização das construções no contexto contemporâneo, investigando em que medida os avanços no setor de construção, o uso de equipamentos no canteiro e os fornecedores especializados de subsistemas construtivos permitem uma industrialização aberta sem a necessidade de grandes fabricas centralizadas. Foram utilizados como objetos do estudo de caso o Centro de Tecnologia da Rede Sarah em Salvador (BH), o Centro Internacional Sarah de Neurorreabilitação e Neurociências, localizado no Rio de Janeiro (RJ) e o Hospital Escola Municipal de São Carlos Professor Doutor Horácio Carlos Panepucci, em São Carlos (SP). O levantamento de dados contou com pesquisa bibliográfica sobre o tema \"Industrialização das Construções\" e coleta de evidências por meio de visitas às obras, além de entrevistas. A pesquisa investiga as diferenças existentes nos processos de construção dos dois exemplos hospitalares em questão. Esta pesquisa apresenta uma análise de dados quantitativa e através dela pode se concluir que, apesar das dificuldades pelas quais a obra do Hospital Escola passou, foi possível produzir uma obra industrializada sem a subordinação a uma fábrica centralizada. Como contribuições a área, esta pesquisa aborda os conceitos da Engenharia de Produção relacionados à industrialização das Construções. Além disso, o levantamento de dados expõe informações importantes sobre os objetos estudados, que podem ser interpretados de maneiras diferente por outros pesquisadores. As obras de João Filgueiras Lima são analisadas do ponto de vista do processo de produção. Esta pesquisa fornece possibilidades para que novos trabalhos sejam desenvolvidos no campo da industrialização das construções tendo como foco os hospitais produzidos pela Rede Sarah. / The Industrialization of Construction is related to the idea of constant search for new technologies and to a fast building construction, lower cost and higher quality. The João Filgueiras Lima\'s work can be considered as an example of industrial experimentation in construction. This work aims to study the industrialization of construction in the contemporary context, investigating how the construction sector advances; the use of equipment in the jobsite and specialized subsystems suppliers enables industrialization without the subordination to centralized factories. As a case study objects were used the Centro de Tecnologia da Rede Sarah, in Salvador (BH), the Centro Internacional Sarah de Neurorreabilitação e Neurociências, in Rio de Janeiro (RJ), and the Hospital Escola Municipal de São Carlos Professor Doutor Horácio Carlos Panepucci, in São Carlos (SP). The survey includes a literature research about \"Industrialization of Construction\" and evidence collect with visits to buildings, and interviews. This research investigates the differences in construction processes of the hospitals above. This research presents a quantitative data analysis and concludes that, despite the difficulties by the \"Hospital Escola Municipal de São Carlos Professor Doutor Horácio Carlos Panepucci\" construction, it is possible to do a industrialized work without the subordination to a centralized factory. To contribute to the area, this research shows the concepts of Production Engineering related to the industrialization of construction. Furthermore, the survey data exposes important information about the objects, which can have different interpretations by other researchers. The João Filgueiras Lima\'s work is analyzed from the production process point of view. This research provides opportunities for future works about industrialization of construction focusing on Sarah Network\'s hospitals.
2

Industrialização das construções complexas: estudo de obras hospitalares / Industrialization of complex construction: a study of hospital buildings

Debora Verniz Pereira 17 December 2012 (has links)
O tema \"Industrialização das Construções\" está atrelado à ideia da busca constante por novas tecnologias e pelo oferecimento de edificações construídas com mais agilidade, menor custo e maior qualidade. O trabalho do arquiteto brasileiro João Filgueiras Lima pode ser tomado como um exemplo da experimentação industrial na construção. A presente dissertação tem por objetivo o estudo da industrialização das construções no contexto contemporâneo, investigando em que medida os avanços no setor de construção, o uso de equipamentos no canteiro e os fornecedores especializados de subsistemas construtivos permitem uma industrialização aberta sem a necessidade de grandes fabricas centralizadas. Foram utilizados como objetos do estudo de caso o Centro de Tecnologia da Rede Sarah em Salvador (BH), o Centro Internacional Sarah de Neurorreabilitação e Neurociências, localizado no Rio de Janeiro (RJ) e o Hospital Escola Municipal de São Carlos Professor Doutor Horácio Carlos Panepucci, em São Carlos (SP). O levantamento de dados contou com pesquisa bibliográfica sobre o tema \"Industrialização das Construções\" e coleta de evidências por meio de visitas às obras, além de entrevistas. A pesquisa investiga as diferenças existentes nos processos de construção dos dois exemplos hospitalares em questão. Esta pesquisa apresenta uma análise de dados quantitativa e através dela pode se concluir que, apesar das dificuldades pelas quais a obra do Hospital Escola passou, foi possível produzir uma obra industrializada sem a subordinação a uma fábrica centralizada. Como contribuições a área, esta pesquisa aborda os conceitos da Engenharia de Produção relacionados à industrialização das Construções. Além disso, o levantamento de dados expõe informações importantes sobre os objetos estudados, que podem ser interpretados de maneiras diferente por outros pesquisadores. As obras de João Filgueiras Lima são analisadas do ponto de vista do processo de produção. Esta pesquisa fornece possibilidades para que novos trabalhos sejam desenvolvidos no campo da industrialização das construções tendo como foco os hospitais produzidos pela Rede Sarah. / The Industrialization of Construction is related to the idea of constant search for new technologies and to a fast building construction, lower cost and higher quality. The João Filgueiras Lima\'s work can be considered as an example of industrial experimentation in construction. This work aims to study the industrialization of construction in the contemporary context, investigating how the construction sector advances; the use of equipment in the jobsite and specialized subsystems suppliers enables industrialization without the subordination to centralized factories. As a case study objects were used the Centro de Tecnologia da Rede Sarah, in Salvador (BH), the Centro Internacional Sarah de Neurorreabilitação e Neurociências, in Rio de Janeiro (RJ), and the Hospital Escola Municipal de São Carlos Professor Doutor Horácio Carlos Panepucci, in São Carlos (SP). The survey includes a literature research about \"Industrialization of Construction\" and evidence collect with visits to buildings, and interviews. This research investigates the differences in construction processes of the hospitals above. This research presents a quantitative data analysis and concludes that, despite the difficulties by the \"Hospital Escola Municipal de São Carlos Professor Doutor Horácio Carlos Panepucci\" construction, it is possible to do a industrialized work without the subordination to a centralized factory. To contribute to the area, this research shows the concepts of Production Engineering related to the industrialization of construction. Furthermore, the survey data exposes important information about the objects, which can have different interpretations by other researchers. The João Filgueiras Lima\'s work is analyzed from the production process point of view. This research provides opportunities for future works about industrialization of construction focusing on Sarah Network\'s hospitals.
3

O processo de produção de um sistema construtivo em painéis estruturais pré-fabricados em madeira / The production process of a construtive system in prefabricated wooden panels

Kokubun, Yuri Endo 02 April 2014 (has links)
Esta dissertação tem por objetivo documentar e analisar o processo de produção do sistema construtivo em painéis estruturais de madeira pré-fabricados aplicado ao protótipo de residência de energia zero - Ekó House. A estrutura do protótipo é composta por quadros de madeira serrada (cumaru - Dipteryx odorata) contraventados por chapas de OSB e ligações metálicas. A descrição do processo produtivo se inicia com a descrição do desenvolvimento do projeto para produção, elaborado em software de manufatura digital, da fabricação com equipamentos convencionais e máquinas de comando numérico computadorizado (CNC), chegando à etapa de montagem da estrutura, utilizando equipamentos de transporte, de içamento e mão de obra capacitada. A partir da análise deste processo, é possível verificar ganhos de produtividade e qualidade na estrutura em painéis pré-fabricados em madeira devido aos procedimentos adotados, dos quais se destacam: (1) precisão obtida pelo emprego de máquina CNC em conjunto com software de manufatura digital; (2) utilização de dispositivos de montagem e; (3) maior controle de produção pelo maior emprego de atividades em ambiente industrial. Esses procedimentos possibilitaram a montagem da estrutura em painéis pré-fabricados em 4 dias e sua desmontagem em 2 dias. As dificuldades mais expressivas estão relacionadas a: (1) manuseio e montagem dos painéis devido à necessidade do uso de equipamentos de içamento e mão de obra treinada; (2) difícil trabalhabilidade da madeira nos processos de pré-fabricação da estrutura e; (3) emprego de soluções não convencionais ao processo construtivo tradicional, o que exigiu a adaptação de ferramentas e o desenvolvimento de procedimentos não usuais na construção em madeira no Brasil. Os processos, procedimentos e ferramentas desenvolvidos, mediante ajustes, se mostraram viáveis para utilização em sistemas construtivos em painéis pré-fabricados em madeira no Brasil. / This dissertation aims to document and analyze the production process of a constructive system in prefabricated wooden panels applied to a net zero energy house prototype - Ekó House. The structure of the prototype consists of bearing panels in timber frame (cumaru - Dipteryx odorata) braced by OSB plates and metallic connections. The description of the production process starts with the development of the design for production, elaborated with digital manufacturing software, the fabrication with conventional woodworking equipment and Computer Numerical Control Machines (CNC Machines), and the assembly of the structure, using transportation and lifting equipment and skilled labor. From the analysis of this process, it was possible to verify gains in productivity and quality in the structure of prefabricated wooden panels due to the procedures adopted, among which are highlighted: (1) the precision achieved by the use of CNC Machines combined with digital manufacturing software; (2) use of jigs and (3) greater control of production due to the greater employment of activities in an industrial environment. These procedures allowed the assembly of the prefabricated structure in 4 days, and disassembly in 2 days. The main challenges are related to: (1) handling and assembly of the wooden panels due to the need of lifting equipment and skilled labor; (2) difficult wood workability in the prefabrications process of the structure and (3) using unconventional solutions to the traditional construction methods, required adaptation of regular tools and the development of unusual procedures in wood construction in Brazil. The process, procedures and tools developed, with some adjustments, area feasible for use in prefabricated wooden panels in Brazil.
4

O processo de produção de um sistema construtivo em painéis estruturais pré-fabricados em madeira / The production process of a construtive system in prefabricated wooden panels

Yuri Endo Kokubun 02 April 2014 (has links)
Esta dissertação tem por objetivo documentar e analisar o processo de produção do sistema construtivo em painéis estruturais de madeira pré-fabricados aplicado ao protótipo de residência de energia zero - Ekó House. A estrutura do protótipo é composta por quadros de madeira serrada (cumaru - Dipteryx odorata) contraventados por chapas de OSB e ligações metálicas. A descrição do processo produtivo se inicia com a descrição do desenvolvimento do projeto para produção, elaborado em software de manufatura digital, da fabricação com equipamentos convencionais e máquinas de comando numérico computadorizado (CNC), chegando à etapa de montagem da estrutura, utilizando equipamentos de transporte, de içamento e mão de obra capacitada. A partir da análise deste processo, é possível verificar ganhos de produtividade e qualidade na estrutura em painéis pré-fabricados em madeira devido aos procedimentos adotados, dos quais se destacam: (1) precisão obtida pelo emprego de máquina CNC em conjunto com software de manufatura digital; (2) utilização de dispositivos de montagem e; (3) maior controle de produção pelo maior emprego de atividades em ambiente industrial. Esses procedimentos possibilitaram a montagem da estrutura em painéis pré-fabricados em 4 dias e sua desmontagem em 2 dias. As dificuldades mais expressivas estão relacionadas a: (1) manuseio e montagem dos painéis devido à necessidade do uso de equipamentos de içamento e mão de obra treinada; (2) difícil trabalhabilidade da madeira nos processos de pré-fabricação da estrutura e; (3) emprego de soluções não convencionais ao processo construtivo tradicional, o que exigiu a adaptação de ferramentas e o desenvolvimento de procedimentos não usuais na construção em madeira no Brasil. Os processos, procedimentos e ferramentas desenvolvidos, mediante ajustes, se mostraram viáveis para utilização em sistemas construtivos em painéis pré-fabricados em madeira no Brasil. / This dissertation aims to document and analyze the production process of a constructive system in prefabricated wooden panels applied to a net zero energy house prototype - Ekó House. The structure of the prototype consists of bearing panels in timber frame (cumaru - Dipteryx odorata) braced by OSB plates and metallic connections. The description of the production process starts with the development of the design for production, elaborated with digital manufacturing software, the fabrication with conventional woodworking equipment and Computer Numerical Control Machines (CNC Machines), and the assembly of the structure, using transportation and lifting equipment and skilled labor. From the analysis of this process, it was possible to verify gains in productivity and quality in the structure of prefabricated wooden panels due to the procedures adopted, among which are highlighted: (1) the precision achieved by the use of CNC Machines combined with digital manufacturing software; (2) use of jigs and (3) greater control of production due to the greater employment of activities in an industrial environment. These procedures allowed the assembly of the prefabricated structure in 4 days, and disassembly in 2 days. The main challenges are related to: (1) handling and assembly of the wooden panels due to the need of lifting equipment and skilled labor; (2) difficult wood workability in the prefabrications process of the structure and (3) using unconventional solutions to the traditional construction methods, required adaptation of regular tools and the development of unusual procedures in wood construction in Brazil. The process, procedures and tools developed, with some adjustments, area feasible for use in prefabricated wooden panels in Brazil.
5

Desenvolvimento de sistema construtivo e estrutural modular em aço para edificações para fins didáticos / Guidance Development for Housing Design for Educational Purposes using the Steel Modular Building System

Penazzi, Maria Emilia 10 April 2015 (has links)
Submitted by Izabel Franco (izabel-franco@ufscar.br) on 2016-09-23T13:11:43Z No. of bitstreams: 1 DissMEP.pdf: 18309308 bytes, checksum: a10a6c45475f6c502beb10e59d62743a (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-26T20:38:11Z (GMT) No. of bitstreams: 1 DissMEP.pdf: 18309308 bytes, checksum: a10a6c45475f6c502beb10e59d62743a (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-26T20:38:16Z (GMT) No. of bitstreams: 1 DissMEP.pdf: 18309308 bytes, checksum: a10a6c45475f6c502beb10e59d62743a (MD5) / Made available in DSpace on 2016-09-26T20:38:22Z (GMT). No. of bitstreams: 1 DissMEP.pdf: 18309308 bytes, checksum: a10a6c45475f6c502beb10e59d62743a (MD5) Previous issue date: 2015-04-10 / Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq) / In the context of Construction, the constructive structural system is responsable for considerable parcel of the construction performance after its occupation. First, this research uses a theoretical boarding within a bibliographical revision about concepts of industrialized construction, approaching the current technician scene in Brazil, and confronting some of the main industrialized technologies available today in the segment of construction. Then, it is tried to demonstrated the technique viability of constructive and structural steel system through the development of a module that could be adjust to diferent archetypes of constructions. Such a way, it was opted to the choice of an existing building in the Federal University of São Carlos (UFSCar), called building of theoretical class rooms 7 (AT7), adapting its educational demand into a system modular in steel. For such boarding,the elaboration of solutions techniques, in a flexible and adaptable way to the initial projetual conception was necessary, contemplating not only space geometry in respect to its structure, but also considering closings systems, installations and logistic, inside industrialized construction thematic. As result, a viable technically modulation was elaborated, considering dimensional, structural and logistic points, so it could be applied or adjusted according to some situations of project, inside constructive and structural types boarded in this study. In this manner, the research presents practical character, therefore it is motivated by the necessity of approaching relative real problems to the projetual conception, supplying and fomenting techniques choices about industrialized systems, cooperating in the spreading of the concept of Industrialization in the technician scene. / No contexto da Construção Civil, o sistema construtivo e estrutural responde por considerável parcela do desempenho da edificação após sua ocupação. Valendo-se inicialmente de uma abordagem teórica, o trabalho apresenta uma revisão bibliográfica sobre conceitos de construção industrializada, abordando o atual cenário técnico no Brasil, e confrontando algumas das principais tecnologias industrializadas presentes hoje no segmento da construção civil. Na sequência, procurou-se demonstrar a viabilidade técnica de utilização do sistema construtivo e estrutural em aço, através do desenvolvimento de um módulo adequável a variadas tipologias de edificações. Para tanto, optou-se pela escolha de um edifício existente na Universidade Federal de São Carlos (UFSCar), denominado Edifício de Salas de Aulas Teóricas 7 (AT7), adaptando o sistema modular à demanda do espaço didático. Para tal abordagem, foi necessária a elaboração de soluções técnicas, de modo flexível e adaptável à concepção projetual inicial, contemplando não somente a geometria espacial em relação à sua estrutura, mas também considerando os sistemas de fechamentos laterais e verticais, instalações e logística, dentro da temática da industrialização da construção. Como resultado, foi elaborada uma modulação tecnicamente viável de ser executada, tanto do ponto de vista dimensional, quanto estrutural e de logística, e que pode ser aplicada ou adequada a várias situações de projeto, que optem por este partido construtivo e estrutural. Desse modo, a pesquisa apresenta caráter aplicativo, pois é motivada pela necessidade de se resolver problemas reais relativos à concepção projetual, fornecendo subsídios para fomentar escolhas técnicas relativas a sistemas industrializados, colaborando na divulgação do conceito de Industrialização no meio técnico. Palavras chave: Sistema modular em aço. Industrialização da construção.
6

Entre o progresso técnico e a ordem política arquitetura e urbanismo na ação habitacional do IAPI / Between technical progress and political order: architecture and urbanism in the housing action of Industrial Retirement and Pension Institute (IAPI)

Botas, Nilce Cristina Aravecchia 13 June 2011 (has links)
Trata da produção pública de habitação fi nanciada pela previdência social a partir de 1930, com recorte específico sobre a atuação do Instituto de Aposentadoria e Pensões dos Industriários (IAPI). Aborda o objeto considerando os seguintes aspectos: relações político-econômicas que condicionaram projetos e obras; conexões entre o campo intelectual e o projeto político; trânsito de idéias nacionais e internacionais na formulação de um conceito próprio sobre arquitetura, urbanismo e habitação; limites e possibilidades do desenvolvimento tecnológico. A atuação dos engenheiros e arquitetos, no âmbito de sua aderência ao projeto desenvolvimentista, é avaliada pelas interfaces de sua formação teórica, de sua inserção política e administrativa e de sua ação propriamente dita. / This research deals with the public housing production financed by the social security after 1930, with a specific range over the performance of the Industrial Reti rement and Pension Institute (IAPI). It deals with this object considering the following aspects: political and economic relationships that conditioned projects and Works; links between the intellectual field and the political project; exchange of ideas national and international in the creation of an own concept of architecture, urbanism and housing; limits and possibilities of the technological development. The engineers´ and the architects´ performance, in the scope of the adherence to the developmental project, are assessed by the interfaces of their theoretical formation, political and administrative vision and their action itself.
7

Entre o progresso técnico e a ordem política arquitetura e urbanismo na ação habitacional do IAPI / Between technical progress and political order: architecture and urbanism in the housing action of Industrial Retirement and Pension Institute (IAPI)

Nilce Cristina Aravecchia Botas 13 June 2011 (has links)
Trata da produção pública de habitação fi nanciada pela previdência social a partir de 1930, com recorte específico sobre a atuação do Instituto de Aposentadoria e Pensões dos Industriários (IAPI). Aborda o objeto considerando os seguintes aspectos: relações político-econômicas que condicionaram projetos e obras; conexões entre o campo intelectual e o projeto político; trânsito de idéias nacionais e internacionais na formulação de um conceito próprio sobre arquitetura, urbanismo e habitação; limites e possibilidades do desenvolvimento tecnológico. A atuação dos engenheiros e arquitetos, no âmbito de sua aderência ao projeto desenvolvimentista, é avaliada pelas interfaces de sua formação teórica, de sua inserção política e administrativa e de sua ação propriamente dita. / This research deals with the public housing production financed by the social security after 1930, with a specific range over the performance of the Industrial Reti rement and Pension Institute (IAPI). It deals with this object considering the following aspects: political and economic relationships that conditioned projects and Works; links between the intellectual field and the political project; exchange of ideas national and international in the creation of an own concept of architecture, urbanism and housing; limits and possibilities of the technological development. The engineers´ and the architects´ performance, in the scope of the adherence to the developmental project, are assessed by the interfaces of their theoretical formation, political and administrative vision and their action itself.
8

Light Steel Framing: uso em construções habitacionais empregando a modelagem virtual como processo de projeto e planejamento / Light Steel Framing: use in residential building employing virtual modeling as design and planning process

Campos, Patricia Farrielo de 09 May 2014 (has links)
O déficit habitacional brasileiro é cada vez maior e os sistemas construtivos utilizados para diminuir a carência de moradias, em sua grande maioria, são lentos e constituídos de forma artesanal. Atualmente, a região brasileira com maior necessidade de unidades habitacionais de baixa renda é a Sudeste, onde se encontra o Estado de São Paulo que representa 19% do déficit habitacional brasileiro. Além disso, o difícil gerenciamento dos projetos envolvidos na construção (arquitetônico, estrutural, elétrico, entre outros), elaborados em diferentes softwares, e a complexa gestão das obras convencionais, em alvenaria, retarda a execução das construções, dificultando a solução do problema habitacional. A utilização do sistema construtivo industrializado Light Steel Framing pode minimizar esse problema, integrando a industrialização na construção civil com as novas tecnologias da informação disponíveis para o mercado da arquitetura, engenharia e construção. Os sistemas construtivos pré-fabricados e industrializados que utilizam o aço, como o Light Steel Framing, quando projetados em plataformas BIM (Building Information Modeling), através de um modelo informativo único, permitem um maior planejamento, partindo do projeto até a fase de fabricação dos componentes da construção. Em função de sua industrialização o Light Steel Framing não permite adaptações e ajustes no canteiro de obras, solicitando assim mão de obra qualificada para a sua execução. Para minimizar e otimizar a quantidade de materiais empregados em uma construção de Light Steel Framing é sugerida a utilização de malhas modulares com 1200x1200mm. A intenção deste trabalho é, de após uma análise aprofundada sobre o sistema construtivo, demonstrar as possibilidades permitidas pelo Light Steel Framing. Através de simulações, em modelos digitais 3D, realizadas tomando como projeto de estudo um modelo habitacional da CDHU estruturado por painéis-parede cegos e painéis-parede com esquadria foi estudada a implementação do sistema Light Steel Framing com o objetivo de aferir a quantidade de material empregado quando o projeto é concebido com os princípios projetivos do sistema construtivo Light Steel Framing. / The housing deficit is growing and the building systems used to reduce the shortage of housing are mostly slow, manual processes. Currently, the Brazilian region with the greatest need for low-income housing units is the Southeast, where the state of São Paulo represents 19% of the Brazilian housing deficit. Furthermore, the difficult management of the projects involved in construction (architectural, structural, electrical, etc.), which are prepared in different software, and the complex management of conventional construction--masonry--slows the building process, aggravating the housing problem. The use of the industrialized building system Light Steel Framing can minimize this problem by incorporating industrialization in construction with the new information technologies available in the market for architecture, engineering and construction. The prefabricated and industrialized building systems which use steel, such as the Light Steel Framing, when designed on BIM (Building Information Modeling) platforms, through a single information model, allow for greater planning, from the design phase to the manufacturing of building components. Due to its industrialization, Light Steel Framing does not allow adaptations and adjustments at the construction site, thus requiring skilled labor for its implementation. To minimize and optimize the amount of materials used in Light Steel Framing construction the use of modular meshes of 1200x1200mm is suggested. The intention of this work is, after a detailed analysis of the constructive system, to demonstrate the possibilities afforded by Light Steel Framing. Through simulations in 3D digital models. using a CDHU housing model with blind wall panels and casing wall panels as a case study, the deployment of Light Steel Framing has been studied with the aim of measuring the amount of material employed when the project is designed with the design principles of the Light Steel Framing construction system.
9

Light Steel Framing: uso em construções habitacionais empregando a modelagem virtual como processo de projeto e planejamento / Light Steel Framing: use in residential building employing virtual modeling as design and planning process

Patricia Farrielo de Campos 09 May 2014 (has links)
O déficit habitacional brasileiro é cada vez maior e os sistemas construtivos utilizados para diminuir a carência de moradias, em sua grande maioria, são lentos e constituídos de forma artesanal. Atualmente, a região brasileira com maior necessidade de unidades habitacionais de baixa renda é a Sudeste, onde se encontra o Estado de São Paulo que representa 19% do déficit habitacional brasileiro. Além disso, o difícil gerenciamento dos projetos envolvidos na construção (arquitetônico, estrutural, elétrico, entre outros), elaborados em diferentes softwares, e a complexa gestão das obras convencionais, em alvenaria, retarda a execução das construções, dificultando a solução do problema habitacional. A utilização do sistema construtivo industrializado Light Steel Framing pode minimizar esse problema, integrando a industrialização na construção civil com as novas tecnologias da informação disponíveis para o mercado da arquitetura, engenharia e construção. Os sistemas construtivos pré-fabricados e industrializados que utilizam o aço, como o Light Steel Framing, quando projetados em plataformas BIM (Building Information Modeling), através de um modelo informativo único, permitem um maior planejamento, partindo do projeto até a fase de fabricação dos componentes da construção. Em função de sua industrialização o Light Steel Framing não permite adaptações e ajustes no canteiro de obras, solicitando assim mão de obra qualificada para a sua execução. Para minimizar e otimizar a quantidade de materiais empregados em uma construção de Light Steel Framing é sugerida a utilização de malhas modulares com 1200x1200mm. A intenção deste trabalho é, de após uma análise aprofundada sobre o sistema construtivo, demonstrar as possibilidades permitidas pelo Light Steel Framing. Através de simulações, em modelos digitais 3D, realizadas tomando como projeto de estudo um modelo habitacional da CDHU estruturado por painéis-parede cegos e painéis-parede com esquadria foi estudada a implementação do sistema Light Steel Framing com o objetivo de aferir a quantidade de material empregado quando o projeto é concebido com os princípios projetivos do sistema construtivo Light Steel Framing. / The housing deficit is growing and the building systems used to reduce the shortage of housing are mostly slow, manual processes. Currently, the Brazilian region with the greatest need for low-income housing units is the Southeast, where the state of São Paulo represents 19% of the Brazilian housing deficit. Furthermore, the difficult management of the projects involved in construction (architectural, structural, electrical, etc.), which are prepared in different software, and the complex management of conventional construction--masonry--slows the building process, aggravating the housing problem. The use of the industrialized building system Light Steel Framing can minimize this problem by incorporating industrialization in construction with the new information technologies available in the market for architecture, engineering and construction. The prefabricated and industrialized building systems which use steel, such as the Light Steel Framing, when designed on BIM (Building Information Modeling) platforms, through a single information model, allow for greater planning, from the design phase to the manufacturing of building components. Due to its industrialization, Light Steel Framing does not allow adaptations and adjustments at the construction site, thus requiring skilled labor for its implementation. To minimize and optimize the amount of materials used in Light Steel Framing construction the use of modular meshes of 1200x1200mm is suggested. The intention of this work is, after a detailed analysis of the constructive system, to demonstrate the possibilities afforded by Light Steel Framing. Through simulations in 3D digital models. using a CDHU housing model with blind wall panels and casing wall panels as a case study, the deployment of Light Steel Framing has been studied with the aim of measuring the amount of material employed when the project is designed with the design principles of the Light Steel Framing construction system.

Page generated in 0.1855 seconds