• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Maximización en la recuperación de pilares con sistema Wassara en método de minado de taladros largos

Chino Andrade, Renzo Yovanny 09 April 2024 (has links)
Esta presente investigación tiene por finalidad de maximizar la recuperación de pilares dejados post minado de tajeos primarios mediante la aplicación de un equipo de perforación con sistema Wassara, que consta de un martillo de fondo propulsado solo con agua y que ofrece mayor longitud y de diámetro de perforación, y menor grado de desviación. De acuerdo con la metodología, esta investigación es del tipo aplicada, enfoque cuantitativo, con un diseño preexperimental y nivel explicativo. En cuanto a resultados se compara un equipo de perforación Jumbo XDTH55UFDR, con un costo unitario de perforación de 41.30 US$/m, costos de perforación de 3.75 US$/t, costo minado de 49.53 US$/t, obteniéndose una recuperación de pilares de 80%, incrementando en 50%, en comparación a la recuperación de pilares de 30% con el Simba 1254; de tal manera, que el diseño de la malla de perforación contempla como parámetros un burden de 2.5 m y un espaciamiento de 2.5 m, longitud máxima de taladros de 80 m y diámetro de perforación de 100 mm, mayor al diámetro de 89 mm del Simba 1254; finalmente con respecto al análisis granulométrico en la voladura, se obtiene un porcentaje pasante P80 de 8.03, teniendo una reducción de 0.23 pulgadas. Concluyendo que con la aplicación del jumbo XDTH55UFDR con sistema Wassara, que tiene mayor longitud y diámetro de perforación en comparación a el Simba 1254, se logra perforar taladros de hasta 80 m de longitud con una desviación del 2.5% y ampliar la malla de perforación de 1.7 x 1.7 a 2.5 x 2.5, por ende, se aumenta en 50% la recuperación de pilares con leyes mayores a 2.2% Cu. / The purpose of this present investigation is to maximize the recovery of post-mining pillars from primary stopes through the application of drilling equipment with the Wassara system, which consists of a down-the-hole hammer propelled only with water and that offers greater length and diameter of perforation, and less degree of deviation. According to the methodology, this research is of the applied type, quantitative approach, with a preexperimental design and explanatory level. In terms of results, a Jumbo XDTH55UFDR drilling rig is compared, with a unit drilling cost of US$41.30/m, drilling costs of US$3.75/t, mining cost of US$49.53/t, which a pillar recovery of 80% is obtained, increasing by 50%, compared to the pillar recovery of 30% with the Simba 1254; in such a way, that the design of the drilling mesh contemplated as parameters a burden of 2.5 m and a spacing of 2.5 m, a maximum length of drills of 80 m and a drilling diameter of 100 mm, greater than the diameter of 89 mm of the Simba 1254; Finally, with respect to the granulometric analysis in the blasting, a P80 passing percentage of 8.03 was obtained, having a reduction of 0.23 inches. Concluding that with the application of the XDTH55UFDR jumbo with the Wassara system, which has a greater length and drilling diameter compared to the Simba 1254, it is possible to drill holes of up to 80 m in length with a deviation of 2.5% and expand the drilling mesh of 1.7 x 1.7 to 2.5 x 2.5, therefore, increasing the recovery of pillars with grades greater than 2.2% Cu by 50%.
2

Evaluación de la utilización de wetlands aeróbicos para la eliminación de metales pesados en aguas contaminadas

Flores Obispo, Michael Isaías 29 February 2024 (has links)
En el Perú, la industria minera viene generando un gran impacto en el ámbito económico, social y ambiental a lo largo de los años. Donde, el ámbito ambiental, es el más perjudicado, siendo el componente agua uno de los principales componentes ambientales afectados, debido al mal manejo de los efluentes generados por las actividades mineras o por pasivos ambientales mineros. Por eso, los sistemas de tratamiento pasivo, como, los Wetlands artificiales, surgen como una alternativa para la remediación a largo plazo, además, de ser económicamente más viable que una planta de tratamiento, ya que emplea especies de plantas para la remoción de elementos tóxicos. Con el fin de cumplir con la normativa ambiental: Límites Máximos Permisibles (LMP) y Estándares de Calidad Ambiental (ECA). La presente investigación tiene como objetivo evaluar el uso de Wetlands aeróbicos, usando plantas como la Totora y Carrizo, para eliminar metales pesados de aguas contaminadas; y su posible utilización para la remediación de pasivos ambientales mineros. Para lograr tal objetivo, se construyeron celdas, a escala de laboratorio, que contenían las plantas previamente mencionadas, soluciones que contiene metales como Cu, Zn, Pb y Fe, y piedra chancada como sustrato. El ciclo de remediación fue de 9 días, donde se realizó el monitoreo de los parámetros físico-químicos (pH, conductividad eléctrica, oxígeno disuelto, turbidez), aniones (nitratos, amoniaco, sulfatos) y contenido de metales. Al finalizar el ciclo, se procedió a retirar las especies de plantas para su tratamiento y análisis mediante los métodos de Vía Seca y Vía Húmeda, para determinar la cantidad de metales presentes en cada parte de la planta (tallo y raíz) y determinar sus eficiencias de absorción. De los resultados obtenidos en laboratorio, se determina que en el día final de tratamiento la mayoría de los parámetros físico-químicos analizados, cumplen con los Límites Máximos Permisibles (LMP) y Estándares de Calidad Ambiental (ECA), a excepción del amoniaco. Además, las concentraciones finales de los metales pesados, cumplen con los LMP y ECA, a excepción del Pb que solo cumple con los LMP. Se obtiene, que el Carrizo obtuvo mejor eficiencia de remoción de Cu (87%) y Zn (94%), y la Totora mejor eficiencia de remoción de Cu (90%), Pb (92%) y Fe (69%). De la misma forma, el Carrizo presento mejor eficiencia de acumulación de Cu y Zn, y la Totora mejor eficiencia de acumulación de Cu y Pb. De los dos métodos empleados, la Vía Húmeda presenta mejores valores de recuperación de metales que la Vía Seca, en metales como el Cu y Fe. Finalmente, se presentó el presupuesto empleado a escala de laboratorio para el desarrollo de la propuesta de remediación para que pueda ser implementada a mayor escala, tanto en operaciones mineras como en pasivos ambientales mineros. / In Peru, the mining industry has been generating a great impact in the economic, social and environmental spheres over the years. Where, the environmental sphere is the most affected, with water being one of the main environmental components affected, due to the poor management of effluents generated by mining activities or by mining environmental liabilities. For this reason, passive treatment systems, such as artificial wetlands, emerge as an alternative for long-term remediation, in addition to being economically more viable than a treatment plant, since it uses plant species for the removal of toxic elements. In order to comply with environmental regulations: Maximum Permissible Limits (MPL) and Environmental Quality Standards (EQS). The objective of this research is to evaluate the use of aerobic wetlands, using plants such as Totora and Carrizo to eliminate heavy metals from contaminated waters and their possible use for the remediation of mining environmental liabilities. To achieve this objective, cells were built, on a laboratory scale, containing the plants, the solutions which contains metals such as Cu, Zn, Pb and Fe, and crushed stone as a substrate. The remediation cycle was 9 days, where physical-chemical parameters (pH, electrical conductivity, dissolved oxygen, turbidity), anions (nitrates, ammonia, sulfates) and metal content were monitored. At the end of the cycle, the plant species were removed for treatment and analysis using the Dry Ashing and Wet Digestion Methods, to determine the amount of metals present in each part of the plant (stem and root) and their absorption efficiencies. From the results obtained in the laboratory, it is determined that on the final day of treatment, most of the physical-chemical parameters analyzed comply with the Maximum Permissible Limits (MPL) and Environmental Quality Standards (EQS), with the exception of ammonia. Furthermore, the final concentrations of heavy metals comply with the MPL and EQS, except for Pb, which only complies with the MPL. It is obtained that the Carrizo has better removal efficiency of Cu (87%) and Zn (94%), and the Totora better removal efficiency of Cu (90%), Pb (92%) and Fe (69%). In the same way, the Carrizo presented better Cu and Zn accumulation efficiency, and the Totora better Cu and Pb accumulation efficiency. Of the two methods used, the Wet Digestion Method presents better metal recovery values than the Dry Ashing Method, in metals such as Cu and Fe. Finally, the budget used at a laboratory scale for the development of the remediation proposal was presented so that it can be implemented on a larger scale, both in mining operations and in mining environmental liabilities.
3

Mejora en la gestión de los procesos de perforación y voladura para incrementar el cumplimiento de los programas de preparación y desarrollo a cargo de la empresa IESA S.A. en la mina El Porvenir

Moreano Panti, Edwar Ruben 02 August 2022 (has links)
En las últimas décadas la situación de la industria minera ha tenido grandes revoluciones, debido a la evolución de las tecnologías en el incremento de la productividad, pero también del otro lado, al protagonismo social de las comunidades en su efervescente reclamo a los titulares mineros por asuntos que escapan de su alcance, pero igual los absorben. En esta revolución mencionada la adaptación ha sido clave para que el negocio minero no pare, así como todas sus externalidades positivas. La adaptación es justamente lo que se ve en el contenido de esta investigación, debido a que en el planteamiento del problema se identifica que las empresas contratistas mineras se están viendo forzadas a ser más productivos, por manejar contratos por precios unitarios y la competitividad natural exige mayor calidad en sus procesos. El estudio toma un caso en particular, donde se evidencia que no hay cumplimiento del programa de avances mensual, y cuya causa es la deficiente gestión en los procesos de perforación y voladura desde la baja y/o pobre ingeniería de diseño. En la investigación se hace un análisis mixto (cuantitativo y cualitativo), para demostrar la conexión que existe entre el factor técnico y humano, para posteriormente medir la correlación que existe entre la disciplina operativa y el cumplimiento del programa de avances. La disciplina operativa esta soportada por un plan de gestión de comunicación interna donde el trabajador se convierte en colaborador al poder interactuar con el emisor del mensaje. Al cierre de la investigación se demuestra que un buen diseño con base técnica no es suficiente para garantizar su aplicación en el terreno, sino, existe herramientas como la gestión de comunicación interna para madurar la disciplina operativa de la organización. / In the last decades the situation of the mining industry has had great revolutions, due to the evolution of technologies in the increase of productivity, but also of the other hand, to the social protagonist of the communities in their effervescent claim to the headlines miners for matters that are beyond their reach, but they still absorb them in this revolution mentioned the adaptation has been key so that the mining business does not stop, as well as all its positive externalities. Adaptation is precisely what is seen in the content of this research, because in the statement of the problem it is identified that the mining contractor companies are being forced to be more productive, by managing contracts for unit prices and the natural competitiveness demands higher quality in its processes. The study takes a particular case, where it is evident that there is no compliance with the program of monthly advances, and whose cause is the deficient management in the processes of perforation and blasting from below and/or poor design engineering. In the investigation, an analysis mixed (quantitative and qualitative), to demonstrate the connection that exists between the technical factor and human, to later measure the correlation that exists between the operational discipline and the compliance with the progress program. The operational discipline is supported by a plan of internal communication management where the worker becomes a collaborator to power interact with the sender of the message. At the end of the investigation, it is shown that a good design with a technical basis is not enough to guarantee its application in the field, but there are tools such as the management of internal communication to mature the operational discipline of the organization.

Page generated in 0.0494 seconds