• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • 1
  • Tagged with
  • 15
  • 12
  • 7
  • 7
  • 6
  • 5
  • 5
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Studie návrhu možností zachycení sedimentů v nádrži Brněnské přehrady

Rambousková, Veronika January 2010 (has links)
No description available.
2

Návrh rozdělovacího objektu na řece Romži / Proposal of the water divider on the river Romže

Blaha, Josef January 2016 (has links)
The diploma thesis deals with the design of the water divider near Prostějov on the Romže River. Divider flows will be transferred into the Hloučela River. Within the thesis, hydraulic calculations of the side spillway were solved according to Bürgel, Pavlosky, Engels, Musterle, Kunštátský, Hager and energy solution methods in the Microsoft Excel spreadsheet and by using the HEC-RAS program as well. The calculations were compared to each other. Geometry of the relief water divider on the Romže River and the related buildings was designed based on the performed calculations. The required function of the relief object is guaranteed by manipulation of designed sluice gate. The study includes the text part with the calculations and the drawing part documenting the implementation of the designed measures.
3

Rekonstrukce jezu v obci Brantice / Reconstruction of the weir in Brantice village

Filipi, Josef January 2017 (has links)
Topic of Diploma thesis is „Reconstruction of the weir in the Brantice village.“ The theoretical part of their focus deals with the definition and putting patterns associa-ted with the design-ing reconstruction of the weir. In the practical part were made three proposals reconstructions of the weir, which are mathematically based, graphically pre-sented and discussed.
4

Studie návrhu hydrotechnických a biotechnických opatření na levém břehu řeky Svratky v k.ú. Ujčov, cca ř. km 93,8 - 94,1

Bureš, František January 2017 (has links)
This diploma thesis Study of the proposal of hydraulic and biotechnical measures on the left bank of the river Svratka in the cadastral area Ujčov, of approx. km 93.8 to 94.1, builds on the previous bachelor thesis Study of selected land on the river Svratka in the village Ujčov. This work is a suggestion to adjust the area in terms of the appropriate use of land, which is owned by the author's family. The affected area lies at the weir on the river Svratka and is currently made up of a pool, which is a relic of the arm of Svratka. The pool is followed by a wetland and grassland with wood vegetation. The first part consists of a literature review and analysis of the issue areas, including its historical development. The practical part is focused on individual hydraulic engineering and biotechnical modifications in the area.
5

Návrh vakového jezu v Oslavanech / Design of Inflatable Weir in Oslavany

Kocman, Tomáš January 2013 (has links)
This thesis describes the current state of the river Oslava in Oslavany design and reconstruction of the existing fixed weir in the affected location. As a best alternative reconstruction of the existing fixed weir reconstruction was chosen the hard threshold floating weir inflatable weirs. The next part of the thesis describes the proposed solution, and the last part of the thesis deals with the assessment of the proposed solutions.
6

Analýza proudových poměrů v okolí nové vodní elektrárny / Hydraulic analysis in the surrounding of hydro power plant

Lorenc, Václav January 2018 (has links)
The diploma thesis deals with analysis of flow ratios at the hydraulic plant Klecany – Roztoky, located in the region of Střední Čechy at Vltava river (km 37,08). At this site 3D streaming of superficial water was simulated aiming to evaluate the influence of potencial construction of the new hydroelectric power plant Klecany II on existing Klecany I. Using all of the base documentation available, 3D models of current and planned conditions were created to serve as base for calculation in FLOW 3D. The first part of the thesis describes, how the planned construction of the new hydroelectric power plant Klecany II could influence the current fairway at the inlet 400 m3/s. The second part analyses shape of planned flow hydroelectric power plant Klecany II for flow Q90d, equal to 180 m3/s. All of the results are presented in intelligible charts and images.
7

Studie rybích přechodů na Bečvě / Study of fish-passing facility on the weirs on Bečva river

Chovancová, Kateřina January 2013 (has links)
This master's thesis consists of three main parts. The first section describes some types of fish crossings and basic information of their design. There is also marginally described program HEC-RAS. The second part is about the Zuberská weir and Osek stage. I review here fish ladders according to the original drawings in the HEC-RAS and suggest possible options to address these passable fish crossings for the fish crew. The last section is devoted to Mikulenkov weir where the fish crossing has been completely removed. Here I propose a new fish ramp according to modern knowledge and applicable standards. I also review the proposed fish ramp in the HEC-RAS program in order to verify the hydraulic characteristics.
8

Posouzení ovladatelnosti sektoru jezového pole VD Roudnice nad Labem při extrémních povodňových stavech / Controllability assessment of the Roudnice nad Labem sector weir box at extreme floods

Růžek, Patrik January 2017 (has links)
This thesis deals with the determination of the load torque during flood conditions on the hydrostatic sectoral weir in Roudnice nad Labem. Problems are solved due to a glitch in the lowering sector. The aim of this study is to determine the resulting torque, of three selected states, which occurred at the water works. The issue was solved as a plane 2D problem using AutoCAD, in which were read the relevant data. It was also used ANSYS software, which modeled the flow of water over the weir to detect pressures acting on overflow face. All calculations are then counted in Microsoft Excel. Force balance is performed on the one-meter design.
9

Návrh rekonstrukce jezu Přízřenice na řece Svratce / Reconstruction of the Přízřenice weir at the Svratka river

Trněný, Michal January 2017 (has links)
The Diploma Thesis deals with the design of rekonstruction of the controlled weir ´´Prizrenice“ on the river Svratka to a new gate weir structure. The first part focuses on teoretical intro and the processing of data on the area of interest and the selection of appropriate design solution for the reconstruction of the weir, where there are described several types of movable gate. As a part of sollution, there will be design of small hydro power station. At the end of this part the current condition of the buildings and the channel of the Svratka river in the area of interest is evaluated. In the second part, the Thesis deals with the design of the gate weir structure and its subsequent assessment. At first, the solid substructure and the height of the gate is designed and assessed. Subsequently, the stilling basin is designed and in conclusion, the overall stability of the designed structure is assessed.
10

Studie MVE v rámci plavebního stupně Přelouč II / Feasibility study of a small hydropower station within the navigation lock Přelouč II

Kratina, Jakub January 2019 (has links)
The content of this diploma thesis is a feasibility study of a small hydropower station within the navigation lock Přelouč II. This work builds on the framework proposal of one variation of layout arragement of the navigation lock. In this variant is considered to build a lock, which also includes a small hydropower station. At the beginning, the location of individual building objects is resolved with respect to the conditions in the locality. This is followed by a more detailed development of the building and technological part of a small hydropower plant. Part of the thesis is accompanying and technical report, drawing documentation, hydrotechnical and hydroenergetic calculations and photographic documentation.

Page generated in 0.0322 seconds