• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • No language data
  • Tagged with
  • 18
  • 18
  • 18
  • 17
  • 17
  • 9
  • 9
  • 7
  • 6
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Grease to the wheel or a spanner in the works? : an investigation of office and industrial occupier displacement and property market filtering generated by public sector assisted property developments : a case study of Tyne and Wear

Greenhalgh, Paul January 2006 (has links)
The thesis is a study of property occupier displacement generated by the supply of new office and industrial accommodation that has been promoted or assisted by property-led regeneration policies. A review of literature revealed that there had been little in-depth investigation of the phenomenon of occupier displacement and the filtering effect associated with it. A flow model was developed to illustrate the incidence of occupier displacement and the process of property market filtering. There are two main strands to the research (see Figure 1.1), firstly an exploration of the property chains generated by the displacement of office and industrial occupiers in response the supply of new accommodation, and secondly, an investigation of the reasons why office and industrial occupiers relocate and how they determine where to move to. Three phases of research were employed to record the displacement generated by twenty public sector assisted office and industrial developments in the Tyne and Wear conurbation. Occupiers of twenty developments were identified by site inspections and a total population questionnaire survey was undertaken, complemented by a telephone survey, to record the status and origin of over 500 property occupiers and allow the property chains to be pursued. The chaining exercise revealed the scale of displacement or relocation and the outcome of the resulting chains. The origin of first move occupiers and chain-ends was plotted to reveal their spatial distribution. The research recorded that over half of all occupiers had relocated and over a third of chains generated by such moves, resulted in vacant property elsewhere in the conurbation. Structured interviews with 29 office and industrial occupiers were undertaken to investigate their locational decisions and the factors that influenced their outcome, the results of which were triangulated with the earlier research phases to reveal ten key themes that fundamentally determine such decisions. The originality of the research is the scale and rigour of the chaining survey, the mapping of the spatial distribution of the origin of occupiers and the chain-ends, and the pursuit of understanding of how occupiers respond to the availability of new accommodation. The scale occupier displacement, generated by new office and industrial accommodation, is significant, but by stimulating property market excitation and vacancy a filtering effect is set-up that can generate positive benefits to a local economy by allowing occupiers to expand.
12

The challenge of compact urban development in Nicaraguan secondary cities

Morton, Ian January 2015 (has links)
Urban sprawl has one definitive characteristic - low intensity/inefficient use of land (Ewing et al., 2008) (Downs, 2000) (Peiser, 2001). Residential densification is the increase in the density of residential land use to combat the negative effects of sprawl. There has been very little academic research on either urban sprawl or residential densification in the specific context of developing countries. This research seeks to address this by looking at the issues in four Nicaraguan secondary cities using a mixed methods approach. This work develops, for the first time in Nicaragua, a housing typology for secondary cities and a consultation of urban planning professionals on sprawl, density and residential densification. Eight housing types have been identified, six of which have average densities that are low or medium (but very close to the boundary with low). The other types are outliers with higher densities – one slightly higher, the other much higher. The consultation has 17 participants and uses a 2-stage Delphi technique. There was consensus that damaging urban sprawl was occurring in each of the cities and that more compact development through residential densification would be beneficial. Participants identified appropriate methods of residential densification for the case study cities, each of which upon analysis, fits into one of the categories established by the City of Capetown Spatial Planning and Urban Design Department (2009, p. 6): either higher density development ‘on greenfield sites ... within [a] ... city’s planned growth direction;’ or higher density development on ‘vacant infill sites’ within existing urban areas; or densification lot by lot within existing urban areas, on lots which are already developed. The consultation revealed current barriers to residential densification, ranging from the enduring “culture of low housing density” in Nicaragua to poor financing options for families to include earthquake resistant foundations in their self-build properties, which would permit safe building on more than a single storey.
13

Evaluation of a social housing retrofit and its impact on tenant energy use behaviour

Lowery, David January 2012 (has links)
Retrofit programmes for installing energy efficient technologies in social housing are a key part of efforts to reduce UK carbon emissions by 80 per cent by 2050. This requires a reduction in CO2 emissions by an average of 80%, from all housing, in order to assist the UK’s long term goals. The UK’s turnover of housing stock is relatively slow compared to most developed countries and approximately 87% of the current housing stock will still be standing in 2050. Therefore, to meet carbon emissions targets, existing buildings must be refurbished or ‘retrofitted’ with technologies which reduce carbon emissions on a huge scale. The Government intends to achieve this by driving energy efficiency in households and businesses predominantly through the proposed Green Deal framework. This represents a shift in policy approach since the 2010 elections, towards a private finance and private industry approach, as rather than the previous Labour Governments predominately state managed and grant-aided social retrofit approach. The influence of the economic recession at the time of this transition is also likely to be a key driver of the Governments changing approach to financing the retrofit of millions of UK homes. Other strategies such as the UK Fuel Poverty Strategy are also intended to dove-tail with this national push to retrofit housing stock, due to reduced energy costs and increased thermal comfort. There is great potential for the proposed national retrofit mobilisation to reduce carbon emissions from homes, contribute to economic growth and provide other benefits such as the reduction of Fuel Poverty. However, the amount of energy used in homes is largely dependent on the behaviours of the occupier(s) and occupant behaviour can determine the effectiveness of retrofit programmes and thus impact on the potential of this significant mobilisation to reduce energy consumption and carbon emissions from housing. Thus, occupant behaviour is increasingly recognised as a critical element to be acknowledged and addressed in order to meet carbon reduction targets, both within the literature (excluding the policy literature) by and those delivering retrofits on the ground. This research provides a unique insight into occupant energy use behaviour by evaluating a ‘live’ project to retrofit energy efficient being implemented by Gentoo Group which includes construction and social landlord roles. The literature review relevant to the research focuses on Psychological theories of behaviour and Practice Theory. This provides insights from both paradigms provide two viewpoints on behaviour: an insight into the nature of individual behaviour (Psychological theories of behaviour), and; a consideration of how the framework and structure of society (including aspects such as technology) interacts with the individual’s practices (Practice Theory). The research methodology utilised an inductive approach, underpinned by a qualitative research design. In-depth interviews were conducted before and after specific interventions (a technical intervention and informational interventions) took place, these interviews were recorded and transcriptions were thematically organised and analysed using the template analysis technique. This process first identified ‘patterns of behaviour related to energy use’ arising due the project interventions and secondly based on the frequency of these occurring, identified ‘key patterns’. The theoretical perspectives of the Psychology and Practice Theory literature were drawn on in order to contextualise the findings of the research, but it this thesis does not attempt to apply them in an empirical approach. The analysis process instead draws on specific elements from both of the disciplines to assist the interrogation of the ‘key patterns’ so they may be better explained or understood. Key findings of the research highlighted that energy use behaviour is impacted by the introduction of technology, and tenant behaviour can potentially impact on the energy saving effectiveness of retrofit projects. Significant impacts were identified specifically where tenants had an interaction with the technology being introduced and the informational intervention had no significant impact on behaviour. ‘Key patterns’ indicated several factors which influence tenant energy use behaviour and of these the barriers to retrofit effectiveness were identified as: limited access to knowledge and skills; habits preventing behaviour change to utilise introduced technologies; the quality of installation and function of the technical intervention; convenience of introduced technology potentially increasing energy use, and: the need or desire for thermal comfort. The thesis concludes that energy use behaviour is pivotal factor in determining retrofit effectiveness and that behaviour, and in particular behaviour-related barriers to retrofit effectiveness, should be acknowledged and addressed as part of the UK retrofit strategy, especially in the light emerging policies such as the Green Deal and Energy Company Obligation, which intend to drive retrofit on a huge scale. Recommendations are made inform retrofit practitioners and academic and policy debates on behaviour in the context social housing retrofit, and suggestions are made for future research to explore this research area further.
14

Managing and controlling airport construction projects : a strategic management framework for operators

Alnasseri, Nasser January 2015 (has links)
During the last few decades, strategic management and strategic human resource management theories have received a great deal of attention in many industrial sectors. The complex and constantly changing business environment has driven large construction companies more than ever before to reflect on the interplay between their organisational strategies and their strategic management processes, tools and techniques. This is despite the great value of human capital for an organisation’s strategic flexibility within different sets of environmental evolutions. This includes people in various positions, administrative, professional, managerial and unskilled, as well as numerous project stakeholders. Several researchers are increasingly interested in applying strategies and human-related studies within the construction industry; however, an integrated study of these two factors has been notably lacking, particularly in an airport context where the challenges and difficulties of managing construction projects are high. This doctoral thesis contributes to the existing literature by exploring the unique characteristics of an airport construction environment, along with reporting the findings of the impact that different airport ownership forms have on construction management efficiency. Through integrating numerous theories and concepts associated with project strategies, strategic human resource management and various efficiency management attributes, this research project presents a unique strategic framework that offers a structured approach to support airport holding bodies. Research primary data were collected following semi-structured interviews with senior construction project managers of airport operators within three distinct airport organisations in terms of their ownership structures. The resultant findings provide insight into the many differences between the case studies in term of project management practices. Furthermore, an explanation of the key practices that influence the occurrence of project success were identified. This doctoral investigation identified there is a need for flexibility and scalability aligned with adopting the strategic framework and engaging its conceptual application with actual management and controlling practices. In essence, the research framework was developed for each category of airport organisation, where an airport organisation is encouraged to focus its efforts on managing the most important framework components which are needed for effective improvement of management practices and, accordingly, to achieve expectations. The resulting theoretical framework provides a unique tool for airport operators to apply their project management knowledge effectively in order to realize complex projects and to secure potential efficiency gains. This study therefore provides a novel theoretical insight into the strategic management of human resources during airport construction projects. The primary application of the strategic framework is concerned with managing and controlling existing airport construction projects, particularly refurbishment or extension projects, however this could be also applied to new airport construction projects where the factors affecting strategic management and strategic human resource management anticipated to be different to those studied during this investigation. This has paved the way for future investigations to be conducted to tackle this dichotomy and further understand the intriguing aspects of airport construction business.
15

Taking stock : an investigation into the nature, scale and location of secondary commercial office vacancy in the UK and an appraisal of the various strategies and opportunities for its management and amelioration

Muldoon-Smith, Kevin January 2016 (has links)
There has been little comprehensive investigation of secondary office vacancy in the UK, nor its potential management or amelioration. In response, this thesis is a study of the nature, scale and location of this situation and an appraisal of the various strategies for its management and amelioration. There are three strands of research. An investigation into the nature, scale and location of secondary commercial office vacancy in the UK. An appraisal of potential management strategies and the development of policy recommendations in relation to the potential amelioration of this situation. An appraisal of the literature was conducted to develop an initial theoretical interpretation of secondary office vacancy. A multi attribute database of commercial office vacancy was then developed to evidence the stock of secondary office vacancy in the UK. Finally, a Delphi exercise was conducted to understand the underlying conditions of this phenomenon, its management and potential amelioration. Findings indicate that secondary office vacancy is ambiguous and colloquial. Vacant secondary office property exists in abundance while prime office property is in short supply. The institutions of the commercial office market over simplify and potentially disguise its manifestation. The incidence of secondary office vacancy is primarily caused by a structural change in the nature of demand. It can be held in reserve to support prime office supply, however, it can also overhang less buoyant locations. Consequently, the management strategies for secondary office vacancy are stratified, ranging from exploitation, to demand repositioning, to renewal and finally removal and redevelopment. Findings suggest that these management strategies should be predicated upon the demonstration of economic viability and mediated by the relative era of construction and underlying institutional characteristics. Finally, policy recommendations suggest that the amelioration of secondary office vacancy would be assisted by the promotion of more agile ways of working based on functional tolerance, and optionality.
16

The impact of collaborative working on construction project performance

Wu, Shuwei January 2010 (has links)
In the construction industry, the relationship between clients and contractors has been usually characterized by uncertainty and adversarial behaviour. More recently, their relationship is said to be changing from a traditional and arms-length basis to more collaborative forms, e.g. partnering. There is evidence that such collaborative forms can have a substantial impact on project performance, not only with regard to time, cost and quality objectives, but also with regard to more general outcomes, e.g. greater innovation and improved user satisfaction. However, such benefits are less well understood due to limited research and in particular an absence of robust and appropriate methods of evaluation. The purpose of this research is to address this shortfall and seek to evaluate these wider aspects of project performance relative to different degrees of collaborative working. To achieve this, collaborative working and project performance first need to be transformed into a measurable form by breaking them down into a variety of attributes or indicators. Surrounding these attributes/indicators, item statements are developed and a Likert Scale is then adopted for questionnaire design. Questionnaires were mainly administered by semi-structured interviews in which the client and contractor from the same project were invited to evaluate their collaborative working and the corresponding project performance. After unidimensionality and reliability testing for the composite measures, the response difference between client and contractor group is explored through conducting paired samples t-test. Subsequently, cluster analysis is conducted to produce a taxonomy of collaborative working and correlation and regression analysis are conducted to explore the associations between collaborative working and project performance. The final conclusion strongly supports the existence of a strong positive linear relationship between collaborative working and project performance, provides valuable regression formulas to make project performance predictions and gives a more precise classification of collaborative working to help reduce the confusion over its definitions in a novel way.
17

Developing public private partnership strategy for infrastructure delivery in Nigeria

Babatunde, Solomon January 2015 (has links)
The success of any public-private partnership (PPP) project in a country is largely dependent on the country’s maturity on critical success factors (CSFs) that made PPP projects successful. Thus, identification of metrics and standards for measuring the maturity of stakeholder organisations on CSFs for PPP projects implementation remains a challenge. Though studies on CSFs for PPP projects abound, approaches of using CSFs to develop PPP process maturity received scarce attention. Against this backdrop, this research becomes imperative to create efficient and transparent operational strategies with a view to using CSFs to develop process maturity for stakeholder organisations in PPP projects in Nigeria. Data for the research were obtained through mixed methods approach namely: quantitative and qualitative approaches. Questionnaires were administered on five different stakeholder organisations comprised public sector authorities (i.e. ministries, department, and agencies), concessionaires, local lenders/banks, consultants, and contractors involved in different PPP projects implementation in Nigeria. The data collected were analysed using descriptive and inferential statistics. Also, the qualitative approach was conducted through an expert forum and six PPP infrastructure project case studies in Lagos metropolis, Nigeria. The expert forum was constituted to refine and verify the conceptual framework developed. Also, structured interviews were conducted with primary stakeholders in the six PPP infrastructure project case studies in the study area. The research identified fourteen CSFs that made PPP infrastructure projects successful in Nigeria. These CSFs were employed for capability maturity levels definition ranging from level 1(Ad hoc) to level 5(Optimising) in accordance to Capability Maturity Model (CMM) concept. This led to the development of stakeholder organisations capability enhancement framework (SOCEF) in PPP infrastructure projects in Nigeria. The framework was validated by PPP experts to ensure it is comprehensive, objective, practical, replicable, reliable, and suitable for use in Nigeria. Thus, a quantitative assessment tool was developed with the framework in assessing the current capability maturity levels of stakeholder organisations involved in PPP infrastructure projects on fourteen CSFs identified in this research. The findings revealed that public sector organisations were between maturity level 1 and maturity level 2 (out of 5 maturity levels) on CSFs applicable to them. The majority of the private sector organisations were in maturity level 2 on CSFs associated with them. It is established in this research that Nigeria’s maturity is between maturity level 1 and maturity level 2 (out of 5 maturity levels) on CSFs that made PPP infrastructure projects successful. The findings emanated from this research provided both the theoretical and practical contributions to knowledge. The theoretical contributions include the methodology for developing capability maturity levels in PPPs, new insights into the usefulness of CSFs in PPP projects, and contributed to the wider body of knowledge of process improvement in the construction industry at large. The practical contributions are the capability level definitions and enhancement framework for PPP practice, and the specific CSFs for PPP infrastructure projects in Nigeria. The framework developed in this research had provided the benchmark for the identification of methodical approach and standard to process improvement in PPP infrastructure projects in Nigeria. It is believed that the framework would provide a useful guide and roadmaps for improvement by indicating ‘what’ needs to be done by stakeholder organisations involved in PPP projects in achieving higher capability maturity levels on identified CSFs for PPP projects in Nigeria and developing countries at large. Thus, the framework could be used to benchmark future studies.
18

Social capital, local economic development and environmental quality in deprived communities : the case of the Kpirikpiri community in South-East Nigeria

Anyigor, Kelechi Theophilus January 2012 (has links)
No description available.

Page generated in 0.1397 seconds