Spelling suggestions: "subject:"control"" "subject:"coontrol""
21 |
Stavebně technologický projekt polyfunkčních domů Zlín-Příluky / Construction and technological project of multifunctional buildings in Zlín-PřílukyKužela, Vlastimil January 2016 (has links)
This diploma thesis deals with technological project for the construction of complex of two multifunctional buildings in Zlín-Příluky. Thesis includes technical report, technological rules, plan of controls and testing, machines, safety plan, project of construction site equipment, budget and time schedule.
|
22 |
Polyfunkční dům v Sezemicích - stavebně technologický projekt / Architectural and technological project to construct a new multipurpose facibility in SezemiceLibánská, Barbora January 2012 (has links)
Architectural and technological project to construct a new multipurpose facility. The work includes: a technical report explaining the construction technology of the project, a construction site plan, time and financial plan of the construction, an implementation study of the major technological stages of the building, a project of site equipment, a design of main construction machines and mechanisms, a work schedule of the main building structure, a technological specification and a plan of control and quality assurance.
|
23 |
Univerzitní kampus Bohunice - Stavebně technologický projekt / University Campus Bohunice - Construction Technological ProjectMoravec, Jan January 2015 (has links)
This diploma thesis addresses the „University Campus Bohunice - Architectural and technological project“. This thesis includes excavation, pile foundation, reinforced concrete foundation slab it also deals with in detail technological regulations on earthworks and deep-pile foundation. The thesis contains solutions to building equipment, schedule of selected stages of the construction situation with the solution of transport routes, designed mechanical assembly required for selected stages and control plan earthworks and deep-pile foundation. This diploma thesis addresses the „University Campus Bohunice - Architectural and technological project“. This project involves construction of two buildings. Building A32 with two basement floors and three floors and second building A 31 with one basement floor and three floors. This thesis includes excavation, pile foundation, reinforced concrete foundation slab, it also deals with technological regulations of earthworks and deep-pile foundation in detail. The thesis contains solutions to construction site equipment, schedule of selected stages of the construction, location of buildings and the solution of transport routes, mechanical equipment required for selected stages of project and control plan of earthworks and deep-pile foundation.
|
24 |
Administrativní budova firmy Esko-T v Třebíči - stavebně technologický projekt / The office building of the company Esko-T in Třebíč - construction technology projectBrym, Jan Václav January 2015 (has links)
The subject of this thesis is building and technological project of new office building of the company Esko-T in Trebic. This work technological prescription monolithic frame, inspection and test plans, design mechanical assembly with the deployment of the machines on site, photographs wider transport links nearby buildings, Occupational safety and health, environmental protection, design cell site equipment, contract work, documentation broader transport relations, building equipment, store site cells at the site, the crane card, schedule deployment of machine-schedule construction site, object work schedule, balance and repair workers drawing project documentation, itemized construction budget, energy consumption on site and price compared monolithic and prefabricated skeleton.
|
25 |
Sportovní areál Třeboň - příprava a organizace výstavby / Sport complex in Třeboň - project planning and management of constructionHánová, Kristýna January 2017 (has links)
The aim of this diploma thesis is to determine the preparation and organization of a Sport areal in located Třeboň. The main purpose of this thesis is to design a solution for structural layout of an existing football field with covered grandsatnd construction. The diploma thesis includes following sections: technical report which refers to the construction-technological project, coordinating situation of the construction with wider links to transport routes, time and financial plan of the building site, feasibility study of the main technological phases, equipment of the building site, proposal of construction machina and mechanisms, timetable, plan for securing material sources, technological regulation of roof steel construction, test and kontrol plan, risks and draft measures, technical report for the issuance of construction permits and item budget.
|
26 |
Časná pooperační péče u pacienta s levostrannou mechanickou srdeční podporou HeartMate II / Early postoperative care of the patient with the left ventricular assist device HeartMate IIMalá, Irena January 2013 (has links)
Author's name: Bc. Irena Malá School: Charles university, Prague 1st Faculty of Medicine Institut of Theory and Practice of Nursing Vídeňská 800, 140 59 Prague 4 - Krč Program: Health Care Administration Title: Early postoperative care of the patient with the left ventricular assist device HeartMate II Diploma thesis supervisor: PhDr. Hocková Jana, PhD. Number of pages: 170 Number of attachments: 41 Year: 2013 Key words: early postoperative care, hypotermia, blood transfusion, fluid resuscitation, perioperative cardiovascular dysfunction, pharmacologic support, ventricular assist device HeartMateII, monitoration, device, cardiac arrhythmias, ventilation management, postoperative anticoagulation, glycemic kontrol, renal insufficiency, nutrition, nursing, complications, physiotherapy, psychological aspects The occurrence of the heart failure is similar to an epidemic with high mortality. This fact, together with stagnate or even decreasing number of suitable donors, led to a need of replacing the heart pump activity with an artificial one. Mechanical cardiac support systems are sophisticated devices that are able to support a certain period of time or completely replace the function of the heart as a pump. The indications implantation of mechanical cardiac support is significant symptomatic heart...
|
27 |
Polyfunkční dům - příprava a organizace výstavby / Multifunctional House - project planning and management of constructionKrč, Jan January 2014 (has links)
This master´s thesis deals with project planning and management of construction of multifunctional building. The main part of thesis are budget of object and schedules of work, which contain realization of reinforced concrete structure and other related works. Another part of thesis deals with the technical regulations about the implementation of horizontal and vertical parts of reinforced concrete structure and from finishing works about realization of inside plasters. Following this part there is design and schedule of using of appropriate building machines and small machinery for their implementation, design of site equipment, quality assurance of works performed, safety of work and minimization of environmental impact. The thesis contains also proposal of contract of work. This work does not deal with substructure of multifunctional building, because this is solved in bachelor thesis.
|
Page generated in 0.0389 seconds