• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

An economic justification of using a small turbine rather than pressure reducing valves between the high pressure header and high pressure heating lines of V.P.I. Power Plant

Chatterjee, Anil Kumar 07 November 2012 (has links)
Generally it is believed that in a power station when there is a demand for process steam and also demand for heating, most of the auxiliaries of the plant should be arranged to be driven by steam rather than using electrical energy for them. This is, however, a general remark and a correct selection can be made only after a detailed study is made of all factors involved. The V. P. I. central heating and power plant works mainly as a heating station, generation of electrical energy, being a by-product. So this problem is completely different from the standpoint of a general power station. This station supplies heating steam to the college through two different pressure lines. One is the low pressure, and the other is the high pressure line. / Master of Science

Page generated in 0.0337 seconds