Spelling suggestions: "subject:"ld5655.v855 1986.1564"" "subject:"ld5655.v855 1986.0564""
1 |
Determining the most appropiate [sic] sampling interval for a Shewhart X-chartVining, G. Geoffrey January 1986 (has links)
A common problem encountered in practice is determining when it is appropriate to change the sampling interval for control charts. This thesis examines this problem for Shewhart X̅ charts. Duncan's economic model (1956) is used to develop a relationship between the most appropriate sampling interval and the present rate of"disturbances,” where a disturbance is a shift to an out of control state. A procedure is proposed which switches the interval to convenient values whenever a shift in the rate of disturbances is detected. An example using simulation demonstrates the procedure. / M.S.
|
Page generated in 0.0307 seconds