• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Optimizing roof control using probabilistic techniques in roof failure prediction

Fraher, Richard Louis 06 October 2009 (has links)
A major objective in the design stage of an underground mine is the reliable prediction of roof falls' size, frequency and location. Probabilistic simulation of potential roof control problems allows a designer to test the performance of competing mine layouts against assumed roof conditions. By comparing different roof control plans using the simulation, the option that provides the lowest overall cost can be selected. The program ROCSIM (Roof control Optimization Cost Simulation) was developed to provide a theoretical solution to this problem. The occurrence and frequency of roof falls are related to the type of roof support, support density, geology, structural discontinuities, location in the mine, and elapsed time between mining and the roof fall. Using a Roof Rating System (RRS) developed for this research, a numerical rating can be given to each area of roof. Using this rating, specific parameters can be assigned to these probability distributions to simulate the occurrence of roof falls within a given geologic setting. Once the location of a roof fall is determined, a cost is calculated taking into account the production delay that would result and the direct cost of cleaning up the fall and resupporting the roof. Assigning a cost to a roof fall allows the comparison of competing roof support designs relative to their overall cost. The final decision on the amount of support and room width must be determined based on legal restraints and minimization of mining costs. / Master of Science

Page generated in 0.0577 seconds