• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 77
  • 45
  • 43
  • 25
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 217
  • 217
  • 114
  • 73
  • 67
  • 65
  • 60
  • 55
  • 54
  • 48
  • 43
  • 42
  • 41
  • 36
  • 35
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
151

Víceúčelová hala v Hodoníně / Multipurpose hall in Hodonín

Grufíková, Markéta January 2012 (has links)
Master´s thesis describes the design and the check of the construction of the art gallery. This hall has the elliptical ground plan, the main dimensions are 25 x 40 m and the height is 12 m. The structure consists of 24 supporting curved ribs, which are supported on elliptical ring of steel at the top of the construction. Between the ribs are inserted purlins, which support the perimeter cladding. The structure is designed alternatively like the system of the timber solid beams from the glued laminated timber and the system of the steel truss girders.
152

Sportovní hala / Sports hall

Horká, Petra January 2012 (has links)
The goal of this master´s thesis is to design load bearing structure of a sports hall. The thesis is elaborated in two variants of the structure design of the sports hall for common types of sports (handball, footsal, tennis, volleyball, basketball). The ground plan dimension is 42 to 72 meters and the construction height is 8 meters. The construction is designed for the district of Brno city. In the structural anlysis there were the following main load bearing structural elements designed and examined: glue laminated timber truss, wood purlins, steel beams, rods and bracing, columns, which together with the transverse girders are linked and foot and anchoring. The selected variant is also further developed. Part of the work is drawing documentation of the choosen variant, disposition drawing and drawings of the selected details.
153

Experimentální a numerická analýza spřažených dřevobetonových konstrukcí / Experimental and numerical analysis of composite timber-concrete structures

Zelený, Petr January 2013 (has links)
The master´s thesis deals with wood-concrete composite floors constructions. The work is divided into a theoretical and a practical part. The theoretical part describes methods of construction and materials used for wood-concrete composite constructions. The practical part describes an experimental four point bend test carried out on wood-concrete composite elements and samples. Further, manual calculation was performed according to Eurocode 5 and in program Asteres three variants of test elements were modeled. Each variant had different composite stiffness according to the working diagram of composite elements. At the end, experimental, computational and numerical results were compared.
154

Horský hotel v Beskydech / Mountain hotel in Beskydy

Kubášková, Barbora January 2014 (has links)
This thesis solves design of timber structure of mountain hotel in Beskydy. The hotel is two-storey building with residential attic and no cellar. The ground plan of the building is about 15x26 m and height of the building is 14,76 m. The type of roof timbers was chosen from two options. There was used structural timber of the strength class C24, glued laminated timber of the strength class GL24 and steel S235. Program Scia Engineer was used for the static analysis of the structure. There was made only linear calculation.
155

Ocelová konstrukce obytné budovy / The Steel Structure of a Residential Building

Špeta, Václav January 2014 (has links)
The master's thesis deals with a project of the steel structure of a residential building. The building is thought like sevenfloor balcony-access house. The access balcony is situated in atrium in the middle of the building, which is roofed with a shell dome. The regular hexagon creates a ground plan of each floor. Every floor is turned 30 degrees compared to the next floors. The longest cross dimension is 43 m (axial). The height of the building is 30,4 m (including copula envelope). The final structure is chosen on the basis of optimization of the structural variants. The climatic load angle structure falls into the locality of the town Brno. The vertical supporting structure is made from steel-concrete accoupled circular section columns. The floor structure is designed from the steel rolled section I and H. These support assembly of a horizontal structure. Some joists and girder are designed like accoupled with a concrete floor slab. The copula above atrium is made from glue laminated timber ribs. Infill rods are from steel tube. The top ring of copula is designed from the rolled section UPE.
156

Víceúčelová hala v Holicích / Multipurpose hall in Holice

Rückerová, Eva January 2014 (has links)
Master´s thesis deals with the design and assessment of the roof construction of the multi-purpose hall in Holice. The other two dimensions of the hall are 28 x 45 m. Height of the hall is 11,28 m. Roofing is done in three variants. The final solution is processed for one presentation. The main supporting element is formed by cross-linking arc beam made of laminated wood. Girders are spaced 5 m and connected purlins. Stability of the construction by three field bracings. The cladding is a rafter, shuttering of OSB particle that carry the roof deck.
157

Lávka pro pěší / Footbridge

Drexler, Martin January 2014 (has links)
This thesis deals with the design and assessment of the wooden footbridge. The structure is designed for the locality of the village Loučná nad Desnou acrros the river Desná. Span of the footbridge is 30m, and the width is 4m. The footbridge is covered with a saddle roof. The main supporting elements are two triple joint arcs with intermediate bridge deck. The bridge deck is made of two main beams and nine cross members, with always two longitudinal members in between them. Roofing is of nine cross-bindings, which are connected by purlins and top purlin. The stability of the whole structure is stiffened by the horizontal longitudinal stiffeners in the top and bottom surface and vertical longitudinal stiffener in the roof. The main load-bearing elements are made of glued laminated timber, the other elements are made of solid timber. Stiffeners are made of steel rods.
158

Pavilon botanické zahrady v Brně / The Botanical Pavillion in Brno

Rusoňová, Nikola January 2015 (has links)
Master´s thesis describes the design and check of the construction of botanical pavillion in Brno. The structure has an elliptical ground plan with dimensions 34 x 20 m, height of 9 m. The supporting structure consists of 16 support curved ribs which are braced at the top of the elliptical steel ring. Between the ribs are inserted purlins which support the perimeter cladding. The supporting structure is designed as an alternative system as girders of glued laminated timber and as system of steel truss girders.
159

Sportovní hala / Sports hall

Štelc, Martin January 2015 (has links)
This diploma thesis deals with the design expertise and supporting structures the single-roof sports hall for locality Brno. The ground plan dimensions are 42 x 72 m and ground clearance of about eight meters. Two variants are processed and selected variant is elaborated in detail. The sports hall is designed for most sports played indoors. In a static calculation are designed and assessed the main load-bearing elements such as truss glued laminated timber, wooden purlins, columns, girts and bracing. The work includes drawings.
160

Vícepodlažní budova / Multi-storey building

Janoušek, Martin January 2015 (has links)
This master's thesis deals with design of the timber structure four-storey building. Plan dimensions of the hall are 20 x 30 m. The structure is designed for the Třebíč. The structure is designed as a heavy timber frame. The axial distance of arches is 5 m. The timber structure is placed between the reinforced concrete towers.

Page generated in 0.151 seconds