• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Evaluating and updating the Kansas Department of Transportation’s lane closure guide in the Kansas City metropolitan area using Traffic Management Center data

Nye, Benjamin Gilbert January 1900 (has links)
Master of Science / Department of Civil Engineering / Eric J. Fitzsimmons / Each year maintenance and rehabilitation occur on interstates and highways to repair damage, improve rideability, and increase safety. To perform many of these activities a short or long-term work zone is required. However, short and long-term work zones can have significant impacts on traffic flow, especially during peak travel times. To mitigate the impact of work zones, the Kansas Department of Transportation (KDOT) has developed a lane closure guide to assist KDOT personnel and contractors in determining times during the day that a lane can be closed to traffic. The existing lane closure guide was comprised of limited data sources and assumptions based on past traffic counts. The purpose of this research study was to evaluate the existing guide and update it using a consistent data source that reflects current roadway conditions. During the evaluation of the existing lane closure guide, several inconsistencies with traffic counts, directional splits, and adjustment factors were found. To eliminate the consistencies, data from the Kansas City Traffic Management Center was used. During the procedure of updating the lane closure guide a repeatable data extraction process and a quality assurance/quality control process were utilized. In addition to updating the KDOT lane closure guide, sensor data verification was performed on one KC Scout sensor on K-10 using road tubes. The data from the road tubes was then compared to the data extracted from KC Scout during the same time interval. The comparison found the road tubes and KC Scout counted statistically the same number of cars for the chosen interval. However, the comparison found the road tube’s average speed for chosen interval to be on average 10 percent higher than KC Scout, which was statistically significant.
2

Work Zone Effects On Performance Of A Toll Plaza

Liu, Jingyu 01 January 2009 (has links)
No-lane closure workzone is typical during the construction of open road tolling lanes of a toll plaza. The influence of no-lane closure on toll plazas' performance is unknown because very few studies have been conducted to address this topic. The open road tolling (ORT) has become the new trend of operating an efficient toll plaza. So, the upgrading of a toll plaza from gated E-pass to open road E-pass has become common. The better the toll plaza authority knows about the influence of this construction and congestion effects, the better it can serve the costumers. This project mainly deals with the effects of no-lane closure workzone on the toll plaza performance, and with the collected data, a model was developed predicting 15 minutes throughput and queue length. To better study the workzone impact on toll plaza performance, three sites with different characteristics were selected. They are Lake Jesup Mainline Plaza along the Seminole Expressway (SR-417), the Beachline West Expressway Toll Plaza along the SR-528 and Conway toll plaza along the Holland East-West Expressway (SR-408) in Orlando area of Central Florida. Data preparation includes demand, throughput, processing rates, and queue lengths of different toll categories. Data was collected during peak period for before and during the no-lane closure construction (phase 1) at SR-528 and Lake Jesup toll plaza at SR-417, and middle lane construction (phase 2) and after opening ORT lanes (phase 3) at Conway toll plaza at SR-408.Comparisons were conducted between non-construction stage and construction stage for non-lane closure workzone effects study using data from 417 and 528, and comparisons between middle-lane-construction and complete of construction stage for ORT impact study using data from 408. Analysis results showed that when the toll plaza is operating at or close to its capacity, the no-lane closure workzone can have a negative impact on its performance. But when the toll plaza's demand is lower than the capacity, the no-lane closure workzone has no impact at the toll plaza's performance. And the ORT lanes have a positive influence on the capacity and throughput of the toll plaza. After the impact of no-lane closure workzone on toll plaza has been analyzed, all the data from three toll plazas are put together and a model is built using the variables of Demand/Capacity ratio, percentage of each category of vehicles, E-pass, Automatic or Manual, number of Manual lanes, workzone or no-workzone. Throughput and Queue length can be predicted by this model.

Page generated in 0.2284 seconds