Spelling suggestions: "subject:"gifting mechanism"" "subject:"ifting mechanism""
21 |
Sportovní areál - stavebně technologická příprava / Sports complex - construction and technological preparationPetruška, Tomáš January 2012 (has links)
The diploma thesis solves the construction technology project of sports complex. The aim of the thesis is rational proposal of construction and resources. The thesis contains plant building site, technological instruction, budget, time schedule, control and trial plan, design and assessment of lifting mechanism and machinery used over construction, contract for work and safety report. Part of the thesis is specialization in sports surfaces.
|
22 |
Vybrané části stavebně technologického projektu bioplynové stanice v Herálci / Selected Parts of Building -Technological Project of Biogas Station in HeralecPíštěk, Kamil January 2013 (has links)
The master thesis with the name Selected Parts of Building -Technological Project of Biogas Station in Heralec solves preparation and realization of building. The aim of master thesis is to design of time, financial and material resources. The thesis contains budget, time schedule, building-site, technological standard, control and trial plan, assessment of lifting mechanism and study of realization of the main stages. The thesis is prepared on the basis of technical documents submitted by the designer. Part of the thesis is specialization.
|
23 |
Výstavba objektu mateřské školy, Brno - Ivanovice, stavebně technologická příprava stavby. / The Development of the Building of the Kindergarten in Brno - Ivanovice, civil technological project.Pivcová, Tereza January 2014 (has links)
Subject of this master thesis is the structural and technological support for the construction of nursery school in Brno Ivanovice. The aim of master thesis is to design time, financial and material resources. The thesis contains technical report, time schedule, building-site, technological standard, control and quality inspection plan and study of realization of the main stages. Part of the thesis is trade’s specialization.
|
24 |
Polyfunkční dům Eastgate, Brno - stavebně technologický projekt / Construction technology project of The polyfunctional house Eastgate, BrnoBrabec, Josef January 2016 (has links)
The aim of this diploma thesis is the building-technological solutions of gross structure Multifunctional file EASTGATE Brno. This multi-functional file is divided into objects Z and Y. This thesis solves the construction of gross substructure and gross superstructure object Z and gross substructure object Y. It deals with the most optimal propsal of technological procedures, working machines, itemized budget, time schedule, check and test plans, equipment of construction site, assessment of lifting mechanism and last but not least closer transport relations. The thesis is prepared on the basis of technical documents submitted by the designer.
|
25 |
STK pro nákladní vozidla Olomouc - Holice - příprava a organizace výstavby objektu / Technical Inspection Station for trucks Olomouc - Holice - preparation and organization of construction buildingProcházka, Jan January 2012 (has links)
The master’s thesis goal is construction-technological project of the "Technical inspection station for trucks" in the city of Olomouc. The goal is rationaly propose preparation and organization of the main building construction. The thesis includes design of site equipment, budget, schedule, main construction machines, construction stages, cash-flow assessment and technological prescription for bored piles.
|
26 |
Stavebně technologický projekt bytového domu ve Velké Bíteši / Construction technology project of the apartment building in Velká BítešSotolář, Václav Unknown Date (has links)
The subject of this final thesis is the construction technology project of an apartment building in Velká Bíteš. The thesis contains a technical reports, construction technology study, coordination situation, time schedule and financial plan of the building in the structure of individual construction object, time schedule of the main building, solution of transport routes, technological regulation for the ventilated facade, control and test plan of the ventilated facade. Furthermore, a design of the construction site equipment is prepared, including a technical report, Occupational Health and Safety on the construction site for the superstructure construction phase, budget for the superstructure construction phase and a comparison of variants of the ceiling structure. Finally, a comparison of lifting mechanisms, LEED certification and assessment of photovoltaic facades is processed.
|
27 |
Příprava a realizace výrobní haly v Holešově / Implementation of Production Hall in HolešovŠevela, Ondřej January 2019 (has links)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.
|
28 |
Stavebně technologický projekt výstavby komplexu RD SLAVKOV - Pod Zlatou horou / Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horouKurková, Dita January 2020 (has links)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.
|
29 |
Stavebně technologický projekt výrobní haly v Hodějicích / Construction Project for Implementation of Industrial Hall in HodějiceKoudelková, Anna Unknown Date (has links)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
|
30 |
Polyfunkční dům Brno, Černovice - stavebně technologický projekt / Multifunctional house in Brno, Chernivtsi - construction technology projectKondáš, Ondřej January 2017 (has links)
The aim of this master's thesis is the construction-technological project of the entire building focusing on major construction building - Multifunctional house, which is based on large-diameter piles. The main part of thesis are budget of object and time schedules of construction. Part of the thesis is organization of construction and design of the site eguipment, technological regulation of selected work, quality control and solving transport relations including oversize cargo. It also deals with the design of mechanical assemblies, health and safety, safety of environment and design of instructions for use of building.
|
Page generated in 0.0794 seconds