• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 45
  • 11
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 69
  • 69
  • 56
  • 22
  • 21
  • 15
  • 15
  • 14
  • 13
  • 11
  • 10
  • 10
  • 10
  • 9
  • 8
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Performance variation and job enrichment in manual assembly work.

Ng, Tat-lun, January 1900 (has links)
Thesis (M. Sc.)--University of Hong Kong, 1978. / Typescript.
22

Multi Criteria Assembly Line Balancing Problem With Equipment Decisions

Pekin, Nilufer 01 January 2006 (has links) (PDF)
In this thesis, we develop an exact algorithm for an assembly line balancing problem with equipment selection decisions. Two objectives are considered: minimizing the total equipment costs and the number of workstations. Our aim is to choose the type of the equipment(s) in every workstation and determine the assignment of the tasks to each workstation and equipment type. We aim to propose a set of efficient solutions for each problem and leave the choice of the best solution to the decision maker&rsquo / s preferences. A branch and bound algorithm is developed whose efficiency is increased with some dominance rules and powerful lower bounds. Moreover, modified ranked positional weight heuristic method is used as initial upper bound. The effectiveness of the proposed procedure is demonstrated by computational analysis in which the effects of changing certain parameter values are investigated. We find that our algorithm is capable of solving the problem instances with up to 25 tasks and 5 equipments.
23

The benefit of using simulation to improve the implementation of lean manufacturing case study : quick changeovers to allow level loading of the assembly line /

McClellan, Jack J., January 2004 (has links) (PDF)
Thesis (M.S.)--Brigham Young University. School of Technology, 2004. / Includes bibliographical references (p. 61-62).
24

Balancing and sequencing of assembly lines

Scholl, Armin. January 1900 (has links)
Thesis (doctoral)--Technische Hochschule Darmstadt, 1995. / Includes bibliographical references (p. [283]-300) and index.
25

Balancing and sequencing of assembly lines

Scholl, Armin. January 1900 (has links)
Thesis (doctoral)--Technische Hochschule Darmstadt, 1995. / Includes bibliographical references (p. [283]-300) and index.
26

Uma abordagem matheurística para o problema de sequenciamento de tarefas e balanceamento de linhas de montagem de modelo único com Tempos de Setup dependentes da sequência

Bastos, Karen Juliana Weigner de January 2015 (has links)
O Problema de Balanceamento e Sequenciamento de Linhas de Montagem com Tempos de Setup dependentes da Sequência (SUALBSP, em inglês Setup Assembly Line Balancing and Scheduling) envolve a atribuição de tarefas às estações de trabalho e o sequenciamento destas tarefas dentro da estação à qual foi atribuída. Trabalhos anteriores propuseram soluções heurísticas com excelentes resultados, porém o uso de métodos exatos, por meio de algum resolvedor de Programação Inteira Mista, tem apresentado desempenhos decepcionantes, pois contém um subproblema NP-hard em todas as estações. Enquanto o modelo de Scholl, Boysen e Fliedner (2013) minimiza prioritariamente o número de estações, o modelo proposto neste trabalho parte da premissa que este é um dado definido. A partir de uma estimativa inicial de número de estações, processa-se o modelo com o objetivo de distribuir as tarefas e minimizar o tempo total de estação, que é o segundo objetivo do modelo original. Se este processamento for infactível, incrementa-se o número de estações em uma unidade e reprocessa-se o modelo até se encontrar um resultado factível. Experimentos computacionais em 101 instâncias de dados confirmam o bom desempenho da abordagem proposta, sem qualquer prejuízo à qualidade da solução. Portanto, os resultados apresentados demonstram que há espaço para estudos futuros a partir do uso de matheurísticas. / The Setup Assembly Line Balancing and Scheduling Problem (SUALBSP) involves the assigning of tasks to workstations and the sequencing of these tasks within the station to which they are assigned. Previous work has proposed heuristic solutions with excellent results, but the use of exact methods, by some Mixed-Integer Programming solver, has shown disappointing performance, because it contains an NP-hard sub problems in every station. While the model proposed by Scholl, Boysen and Fliedner (2013) primarily minimizes the numbers of stations, our model assumes it as a parameter. From an initial estimate of the number of stations, we process the model for allocating tasks and minimize station times, which is the second objective of the original model. If this processing is infeasible, we increase the number of stations by one unit and we reprocess the model to find a feasible result. Computational experiments in 101 instances of data set confirm the good performance of the proposed approach, without harming the quality of the solution. Therefore, the results show that there are opportunities for future studies based on the use of matheuristics.
27

Aplicação da simulação a eventos discretos no balanceamento de linha de montagem /

Maciel, Lucio Flore. January 2016 (has links)
Orientador: Fernando Augusto Silva Marins / Banca: José Roberto Dale Luche / Banca: Roberto Campos Leoni / Resumo: O objetivo geral da pesquisa foi desenvolver um modelo de simulação a eventos discretos para ser aplicado ao balanceamento de uma linha de montagem de componentes numa empresa do setor automotivo, buscando aumentar a produtividade da linha e utilizando menores quantidades de insumos. Na situação estudada há muitos elementos com comportamento estocástico, que podem influenciar na produtividade da linha, além da diversidade de insumos que abastecem a montagem, o que torna o balanceamento da linha uma tarefa complexa e favorece o uso da Simulação como procedimento de solução. Na modelagem conceitual do problema estudado adotou-se o método IDEF-SIM e para a simulação foi utilizado o software ProModel®. Como resultados tem-se um modelo conceitual e implementado para uma linha de montagem que possibilitou informações interessantes sobre o problema, tais como: juntar funções de dois postos de trabalhos, eliminar excesso de movimentação e eliminar gargalos / Abstract: The overall objective of the research was to develop a simulation model discrete event to be applied to balancing an assembly line components in automotive company, seeking to increase line productivity and using lower amounts of inputs. In the situation studied for many elements with stochastic behavior, which may influence the productivity of the line beyond the range of products that supply assembly, which makes the balancing line a complex task and promotes the use of the simulation procedure as a solution. In conceptual modeling of the studied problem adopted the IDEF-SIM method and for the simulation we used the ProModel® software. As results has a conceptual model and implemented for an assembly line that has enabled interesting information about the problem, such as joining functions of two posts jobs, eliminate excess movement and eliminate bottlenecks / Mestre
28

Uma abordagem matheurística para o problema de sequenciamento de tarefas e balanceamento de linhas de montagem de modelo único com Tempos de Setup dependentes da sequência

Bastos, Karen Juliana Weigner de January 2015 (has links)
O Problema de Balanceamento e Sequenciamento de Linhas de Montagem com Tempos de Setup dependentes da Sequência (SUALBSP, em inglês Setup Assembly Line Balancing and Scheduling) envolve a atribuição de tarefas às estações de trabalho e o sequenciamento destas tarefas dentro da estação à qual foi atribuída. Trabalhos anteriores propuseram soluções heurísticas com excelentes resultados, porém o uso de métodos exatos, por meio de algum resolvedor de Programação Inteira Mista, tem apresentado desempenhos decepcionantes, pois contém um subproblema NP-hard em todas as estações. Enquanto o modelo de Scholl, Boysen e Fliedner (2013) minimiza prioritariamente o número de estações, o modelo proposto neste trabalho parte da premissa que este é um dado definido. A partir de uma estimativa inicial de número de estações, processa-se o modelo com o objetivo de distribuir as tarefas e minimizar o tempo total de estação, que é o segundo objetivo do modelo original. Se este processamento for infactível, incrementa-se o número de estações em uma unidade e reprocessa-se o modelo até se encontrar um resultado factível. Experimentos computacionais em 101 instâncias de dados confirmam o bom desempenho da abordagem proposta, sem qualquer prejuízo à qualidade da solução. Portanto, os resultados apresentados demonstram que há espaço para estudos futuros a partir do uso de matheurísticas. / The Setup Assembly Line Balancing and Scheduling Problem (SUALBSP) involves the assigning of tasks to workstations and the sequencing of these tasks within the station to which they are assigned. Previous work has proposed heuristic solutions with excellent results, but the use of exact methods, by some Mixed-Integer Programming solver, has shown disappointing performance, because it contains an NP-hard sub problems in every station. While the model proposed by Scholl, Boysen and Fliedner (2013) primarily minimizes the numbers of stations, our model assumes it as a parameter. From an initial estimate of the number of stations, we process the model for allocating tasks and minimize station times, which is the second objective of the original model. If this processing is infeasible, we increase the number of stations by one unit and we reprocess the model to find a feasible result. Computational experiments in 101 instances of data set confirm the good performance of the proposed approach, without harming the quality of the solution. Therefore, the results show that there are opportunities for future studies based on the use of matheuristics.
29

Uma abordagem matheurística para o problema de sequenciamento de tarefas e balanceamento de linhas de montagem de modelo único com Tempos de Setup dependentes da sequência

Bastos, Karen Juliana Weigner de January 2015 (has links)
O Problema de Balanceamento e Sequenciamento de Linhas de Montagem com Tempos de Setup dependentes da Sequência (SUALBSP, em inglês Setup Assembly Line Balancing and Scheduling) envolve a atribuição de tarefas às estações de trabalho e o sequenciamento destas tarefas dentro da estação à qual foi atribuída. Trabalhos anteriores propuseram soluções heurísticas com excelentes resultados, porém o uso de métodos exatos, por meio de algum resolvedor de Programação Inteira Mista, tem apresentado desempenhos decepcionantes, pois contém um subproblema NP-hard em todas as estações. Enquanto o modelo de Scholl, Boysen e Fliedner (2013) minimiza prioritariamente o número de estações, o modelo proposto neste trabalho parte da premissa que este é um dado definido. A partir de uma estimativa inicial de número de estações, processa-se o modelo com o objetivo de distribuir as tarefas e minimizar o tempo total de estação, que é o segundo objetivo do modelo original. Se este processamento for infactível, incrementa-se o número de estações em uma unidade e reprocessa-se o modelo até se encontrar um resultado factível. Experimentos computacionais em 101 instâncias de dados confirmam o bom desempenho da abordagem proposta, sem qualquer prejuízo à qualidade da solução. Portanto, os resultados apresentados demonstram que há espaço para estudos futuros a partir do uso de matheurísticas. / The Setup Assembly Line Balancing and Scheduling Problem (SUALBSP) involves the assigning of tasks to workstations and the sequencing of these tasks within the station to which they are assigned. Previous work has proposed heuristic solutions with excellent results, but the use of exact methods, by some Mixed-Integer Programming solver, has shown disappointing performance, because it contains an NP-hard sub problems in every station. While the model proposed by Scholl, Boysen and Fliedner (2013) primarily minimizes the numbers of stations, our model assumes it as a parameter. From an initial estimate of the number of stations, we process the model for allocating tasks and minimize station times, which is the second objective of the original model. If this processing is infeasible, we increase the number of stations by one unit and we reprocess the model to find a feasible result. Computational experiments in 101 instances of data set confirm the good performance of the proposed approach, without harming the quality of the solution. Therefore, the results show that there are opportunities for future studies based on the use of matheuristics.
30

Optimalizace výrobního procesu ve vybraném podniku / Optimization of manufacturing process in a selected company

Kubíček, František January 2020 (has links)
This thesis is primary focused on optimization of the production process in a selected company.Teoretical part of this thesis is the result of literature research of Lean Six Sigma, which is mostly used by the company. It is a brief insight to an issue and introduction of the most often used tools from Lean Six Sigma methodology, which were used afterwards in practical part of this thesis. Also there is an introduction of the company and its production portfolio. Crucial part of this thesis is it‘s practical part focused on improving of current situation on the production line with an economical and technical assessment. The main goal was to create more compact and smaller area of product line with lower work in progress.

Page generated in 0.0907 seconds