A Gps/gis Based Line Of Balance Method For Planning And Control Of Construction Projects

Uysal, Furkan 01 August 2007 (has links) (PDF)
In construction industry Gantt charts, network methods and Line of Balance (LOB) methods are generally used for planning and control of projects. Networking techniques such as Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) require technical knowledge and could be difficult to implement without proper scheduling background. Gantt charts and LOB techniques are usually easier to implement, however, similar to network techniques these techniques lack visualization. A graphical based scheduling and progress control method could improve existing techniques with visualization so that schedule information could be understood easily by the project participants. Geographic Information Systems (GIS) can be helpful for improving the traditional scheduling methods by utilizing spatial information. In this study, a prototype Global Positioning System (GPS) and GIS based LOB method is proposed. To illustrate the benefits, the proposed method will be applied to a pipeline project.
2

Evaluation and Comparison of Project Scheduling Methods and Software Used in the Construction Industry

Parlak, Mehmet 12 August 2016 (has links)
The objectives of this thesis are to evaluate scheduling methods and most common construction project management software (CPMS) which are Primavera and MS Project, and to determine most widely used project scheduling techniques and CPMS with a survey. The thesis focus on project scheduling since it is very deterministic for project success. Evaluation results indicate that, Gantt Chart Method and PDM are useful for small to medium projects, CPM is for complex projects, PERT is for uncertain projects, and LOB Technique is for repetitive projects. The comparison between Primavera and MS Project show that Primavera is more robust, professional, and detailed while MS Project is cheaper and easier. The survey was completed with 22 participants from construction companies in the US and Turkey and the results demonstrate CPM and Gantt Chart Method are the most common methods. Also, MS Project is the most widely used CPMS followed by the Primavera.