• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Comparação aplicada entre as técnicas de planeamento CPM e LOB (Line of Balance)

Ferreira, Ricardo Costa January 2011 (has links)
Tese de mestrado integrado. Engenharia Civil (Construções). Universidade do Porto. Faculdade de Engenharia. 2011
2

USO DE TÉCNICAS DE PLANEJAMENTO EM GESTÃO DE PROJETOS.

Alcântara, Karine Gomes Bezerra de 13 September 2012 (has links)
Made available in DSpace on 2016-08-10T10:40:19Z (GMT). No. of bitstreams: 1 KARINE GOMES BEZERRA DE ALCANTARA.pdf: 5389542 bytes, checksum: dc9ede65ba065fe001b67486f091d942 (MD5) Previous issue date: 2012-09-13 / Despite the construction sector being one of the largest sectors in the economy, it has its own specific characteristics with abundant movement of financial resources and absorption of labor. Even though its importance, it has major flaws regarding the planning process for residential development. There are few techniques that assist in production schedule aimed at producing vertical and horizontal sequential works.The CPM method, by utilizing heuristic rules of programming, enables the manager to view constructive scenarios. This technique associated with the concept of resource leveling remedies common problems of construction delays and excessive use of resources for project execution. Also, line of balance, a technique used in this study, displays the flaws and gaps in production, reducing the idleness of labor and the leveling of the rate of production. The objective of this study is to compare planning techniques of vertical sequential works, in order to get better performance based on the reduction of time and resource optimization. This study developed analysis and demonstrations of the effectiveness of tactical and operational planning of four enterprises with particular characteristics and differentiated from each other in order to test and process the data obtained by the work scenarios of executive managers, showing the best alternative of execution for the type of enterprise studied. Therefore it is concluded that the proposed techniques are easy to use, have specific performance, feature complementary graphical visualizations and proven to be very effective in making decisions. Both associated techniques generate excellent results for works of a repetitive nature. / O setor da construção, apesar de ser um dos maiores setores da economia, tem características próprias em especial pela grande movimentação de recursos financeiros e absorção de mão de obra. Apesar de sua importância, apresenta grandes falhas quanto ao processo de planejamento de empreendimentos residenciais. Existem poucas técnicas que auxiliem na programação de produção direcionados a obras verticais e horizontais seriadas. O método CPM, por utilizar regras heurísticas de programação, possibilita ao gestor a visualização do cenário construtivo. Essa técnica, associada ao conceito de nivelamento de recursos permite sanar problemas comuns de atrasos de obras e uso excessivo de recursos para a execução de projetos. A linha de balanço, técnica também empregada, permite visualizar as falhas e folgas de produção, reduzindo a ociosidade de mão de obra e o nivelamento do ritmo de produção. O objetivo deste trabalho é comparar técnicas de planejamento de obras horizontais seriadas, para a obtenção do melhor desempenho produtivo com base na redução de tempos e otimização de recursos. Neste estudo, foram desenvolvidas análises e demonstrações da eficácia do planejamento tático e operacional de quatro empreendimentos com características particulares e diferenciadas entre si, visando a comparação e o tratamento dos dados obtidos pelos cenários executivos dos gestores das obras, demonstrando assim a melhor alternativa de execução para a tipologia do empreendimento de estudo. Conclui-se que as técnicas propostas são de fácil aplicação, possuem desempenhos específicos, possuem visualizações gráficas complementares e mostraram-se muito eficazes no processo de tomada de decisões, gerando excelentes resultados para obras de natureza repetitivas.

Page generated in 0.3177 seconds