• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 59
  • 13
  • Tagged with
  • 73
  • 73
  • 73
  • 73
  • 73
  • 28
  • 28
  • 24
  • 21
  • 19
  • 18
  • 17
  • 17
  • 13
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

An invistagation of the factors reguired to improve the quality of low-cost houses in eThekwini Municipality, KwaZulu Natal

Nqentsu, Luleka January 2017 (has links)
Thesis is submitted in partial fulfilment for the degree of Master of Science in Building (Construction Project Management) to the Faculty of Engineering and the Built Environment, School of Construction Economics and Management at the University of the Witwatersrand, Johannesburg, 2017 / Access to housing and safe accommodation is an essential part of the South African government’s commitment to poverty relief and the improvement of the wellbeing of its people. Despite the substantial commitment and progress by the South African government towards ensuring adequate housing, much still needs to be done to combat the existing challenges facing the low-cost housing industry. Amongst various challenges, the low-cost housing sector faces challenges of poor quality houses. The level of dissatisfaction due to poor quality appears to be dominant in the low-cost housing sector. These challenges are crucial as the impact is severely noticeable, both socially and economically. The literature reviewed and the data collected is indicative that the use of emerging contractors who are likely inexperienced in the construction of low-cost houses is one of the major contributing factors to the poor quality of the end product. Emerging contractors form a majority of the construction contractors in the country and have been identified to play a vital role in the construction of low-cost houses. Constraints experienced by emerging contractors are posing risk to the projects and pose a challenge to the successful completion of these projects. The under-development of emerging contractors has resulted in poor workmanship and poor quality low-cost houses. Subsequent to the identified problem areas, this study on investigation of the factors required to improve the quality of low-cost houses in eThekwini municipality, KwaZulu Natal was initiated. The research objectives pursued by this study aimed to compare the contributing factors to the poor quality of low-cost houses as perceived by housing project managers and emerging contractors; to compare key factors that can be improved to enhance the quality of low-cost houses as perceived by project managers and emerging contractors; and to identify quality management mechanisms currently available in the construction of low-cost houses and determine their influence level. A mixed research methodology was employed, using the survey method as the research design and data collection, through semi-structured questionnaires. The questionnaires were hand delivered to forty (40) participants and twenty seven (27) 2 2 responses were received and analysed, which comprised ten (10) project managers and seventeen (17) emerging contractors. Results from the study showed that there are undeniably issues of poor quality that include foundation failures, structural cracks and leaking roofs in the low-cost housing sector in eThekwini, KwaZulu Natal. It is evident from the analysis that there are many probable underlying causes to the poor quality of low-cost houses, which include: lack of continuous development for emerging contractors; insufficient subsidy amounts; the use of inferior materials; and the use of unskilled labourers on site. The results of the study indicated that shortcomings exist in terms of the necessary skills among emerging contractors, which means there is a huge need for continuous training on different important skills. The need for training of emerging contractors is enormous and that all aspects in terms of training should be considered to be of equal importance. It can also be determined that there is a lack quality management framework within the department and the municipality. These quality management frameworks need to be developed to ensure improvement in quality of the low-cost houses. / XL2018
22

Low cost housing delivery in the Northern Province with reference to the Central Region

Matlala, M. M January 2000 (has links)
Thesis (MPA.) -- University of Limpopo, 2000. / Refer to the document
23

The role of community based housing organizations in housing the low- income people.

Nhlabathi, Sibonakaliso Shadrack. January 1996 (has links)
No abstract available. / Thesis (M.U.R.P.)-University of Natal, Durban, 1996.
24

Implementation of green measures for sustainable low-income housing in developing countries : guidelines for the design of new settlements in the South African context.

Murru, Barbara. 26 September 2014 (has links)
In South Africa, about 15,3% of the households were living in 2011 in formal state-subsidised low-income houses (houses for households with income lower than R 3500 - about $ 350 - per month), whereas 12,1% were living in informal dwellings. The sustainable development of low-income housing is therefore one of the main challenges for developing countries addressing the green Agenda as South Africa, especially considering the quality of life of inhabitants and the complex socioeconomic implications. Furthermore, the energy consumption patterns of low income households have emerged as one of the most important factors influencing the national electricity demand, as marked by the National Housing Code of 2009. The complex social and environmental issues related to the living conditions of low-income communities need to be addressed with an integrated approach to the design of the settlements. Rethinking and greening the low-income housing design principles firstly represent an opportunity to strive social inequity and improve the quality of life of households. The rationale of this study is to investigate how a strategic bottom-up approach and multi-scale low-cost green measures, implemented in the design process of South African low-cost housing, can potentially achieve environmental and social sustainability targets with affordable solutions. The dissertation analysed a representative case study of a low-cost housing development in the KwaZulu-Natal Province. The research adopted a bottom-up approach combining participatory methods through a survey and interviews with the local community, and a scenario analysis investigating design alternatives and multiscale green strategies (i.e. alternative building typologies, densification, passive design strategies). The proposed scenario evaluated the potential benefits of the green implementation, through qualitative and quantitative assessments based on sustainability indicators as environmental and energy impacts, social implications, safety and cost effectiveness, supported also by experimental methods using dynamic building energy modelling. The study promoted an integrated and holistic research and design approach to foster the sustainability in low-cost housing development. The outcome of this integrated bottom-up approach defined a framework of good criteria and methods for the design process, which can be intended as a guideline to effectively implement green measures and reach sustainability targets for low-cost settlements. / Thesis (M.Sc.Eng.)-University of KwaZulu-Natal, Durban, 2014.
25

Improving the supply of subsidised housing in South Africa

Bekker, Jakobus Petrus January 2017 (has links)
Despite South African citizen’s constitutional right to adequate housing, Government’s housing delivery has been described as a complex, multi-stakeholder, multi-phase problem, exacerbated by political interference and corruption. Housing delivery in South Africa is ideologically and politically designed and executed. However, the government subsidised housing sector remains plagued by: huge and increasing backlogs; corruption; quality concerns, and recipient and stakeholder dissatisfaction. This includes the government subsidised housing construction sector, which faces issues such as: established contractors leaving the sector; late and failed completion; substandard quality; rework; cost overruns; late progress payments; and insolvencies. Moreover, government subsidised housing officials, which forms part of this sector, must contend with abandoned projects and appointing new contractors; shoddy workmanship from sub-standard contractors; remedial work, including demolition and rebuilding; and systemic problems such as staff shortages and under qualified staff. The process of Government’s ideological and political designed and execution may therefore not have considered certain practicalities relative to construction principles and practice. It therefore appears that there may be some relationship between the compatibility of Government’s housing ideological and political designed (policy) and execution and general construction principles and practice. It is clear from the related literature that government subsidised housing construction has mostly been investigated as an exercise observing from the outside in, and not from a construction sector perspective. The main purpose of this study is thus to explore housing policy and practice compatibility as a major obstacle to housing delivery in general and assess whether the current housing policy is sufficiently responsive to the requirements of the government subsidised housing sector by specifically describing and exploring the effects of Government’s housing procurement policies relative to the ability of the construction sector to supply government subsidised housing. More specifically, the study describes and explores corruption, quality; contractors and worker competency, and government capacity as specific consequences of housing policy and practice incompatibility, as well as factors contributing to recipient dissatisfaction and the housing backlog. Finally, based on the finding, a proposed framework for improving the supply of subsidised housing in South Africa has been developed. The methodology for this study adopted a post-positivist philosophy, embracing a quantitative approach using questionnaires, which incorporated mainly five-point Likert type scale, but also multiple-choice questions, as instruments for data collection. Three surveys were conducted, starting with a pilot study and followed by a primary study, during which a total of 2 884 potential participants within the construction sector across South Africa were randomly sampled and solicited to participate, of which 284 responded. The respondents consisted of four groups: general contractors (76); government housing officials (34); built environment professionals (137), and built environment suppliers (37). An electronic questionnaire was sent by email to all potential participants and allowed four weeks to complete the survey. Furthermore, a housing recipient survey was conducted among 100 randomly selected recipients of government subsidised housing in the Nelson Mandela Metropolitan area, by means of a structured interview using a paper based questionnaire, over a period of two weeks. The primary outcome measures used for this study were the ranked mean scores for mainly descriptive analysis and the Chi-square test, the 𝑡-test, Cohan’s d test, ANOVA and Scheffé test, using Cronbach's alpha as a measure of internal consistency of scale and validity, for inferential analyses and hypotheses testing. Hypothesis testing was founded upon Government’s worldview that its policies will not influence the operations of the construction sector relative to housing construction, and therefore tested respondents’ perspectives with respect to the impact that government policies have in terms of contractor operations and contractor success, as well as its contribution towards the housing backlog, substandard housing, recipient dissatisfaction and corruption. The following results were obtained by means of the hypothesis testing:Government housing procurement policies are inappropriate for application in the government subsidised housing sector. Respondents therefore disagree with the notion that government policy and practices do not impact contractor operations and contractor success, and thus the supply of houses; The application of government housing procurement policies leads to inadequate quality. Respondents therefore disagree with the notion that government preferential procurement policies do not impact quality; Government’s housing procurement policies inappropriately target emerging contractors. Respondents therefore disagree with the notion that Government’s targeting of emerging contractors does not impact housing supply; Government has inadequate capacity to address subsidised housing construction sector requirements in terms of housing projects. Respondents therefore disagree with the notion that Government has the capacity to address subsidised housing construction sector requirements in the supply of housing, and Government subsidised houses do not meet recipients’ expectations. Respondents therefore disagree with the notion that government subsidised houses do meet recipients’ expectations. It thus became apparent that housing supply is mostly inhibited by Government’s housing procurement policy, contributing to various factors, such as quality capability, contractor capability, systemic and administrative capacity, and resulting in recipient dissatisfaction. Using Pearson’s product moment correlation, a framework model was developed to illustrate the process flow, which revealed definitive statistical and practical relationships between these factors, and indeed reflects complex relationships between factors inhibiting supply and resulting in recipient dissatisfaction. To find an appropriate framework model for the purpose of improving housing supply, various sources were consulted. Based on the research question, together with the aims and objectives for this study, as well as the realisation that the problems associated with housing supply relate to the project management of the construction phase, which requires interventions for improving supply, it was decided that a results framework would be the most appropriate for this purpose. The proposed framework is therefore a graphical depiction of how the research process may be used to identify problems in the government subsidised housing sector, questioning how these may be resolved, setting strategies to improve the situation, evolving hypotheses and testing these hypotheses to establish the critical factors to be considered in the process of resolving the problem in the housing sector, by means of implementation and feedback.
26

Design, fabrication, production and erection of elements for a low cost housing unit

Nxumalo, Mutshutshu January 1999 (has links)
Thesis submitted in partial compliance with the requirements for the Masters Degree in Technology: Mechanical Engeering at Technikon Natal, 1999. / Housing is currently one of the most critical development areas in the Republic of South Africa (RSA). This developmental project forms part of a possible solution in the delivery of housing through mass production. The objective of this study is to establish a empathetic connection between modem geodesic construction and the traditional dome and to design an effective and efficient prefabricated dwelling unit suited to be easily built by semi-skilled persons. The success of this project will fulfill one of the major objectives of the RSA's Reconstruction and Development Programmes (RDP) - 'A better lifefor all'. / M
27

Social housing in South Africa: a study of Walmer Link

Gxogxo, Vulisango Thanklord January 2014 (has links)
Shelter is a basic human right that was recognised by the South African constitution and this led to the government's partnership with the private sector together with NGO's in responding to the huge housing demand for the poor. Due to the RDP's failure in delivering houses to the poor masses, the government introduced a social housing programme in Walmer, Port Elizabeth in the Eastern Cape. The Walmer Link social housing programme has been able to give poor people an alternative than being backyard shack dwellers. The rental complex offers good quality housing with secured features at very low prices based on individual income. This initiative has been able to ease the pressure of providing houses to the poor from government and has also been able to lower poverty levels in the Port Elizabeth area.
28

Evaluating sustainable human settlements programs aimed at low groups within the Buffalo City Metropolitan Municipality

Mlaza, Thandeka January 2011 (has links)
Housing delivery and issues relating to housing delivery have long been a complicated subject for most SA municipalities and government departments tasked with these responsibilities. The aforementioned complications stem from our inherited apartheid planning that was mainly focused on inequality, racial segregation and spatial fragmentation of land use. Corruption, lack of skills, financial constraints and lack of resources are issues further considered to be contributors to the complications related to housing delivery. The study to be conducted seeks to play a part in dealing with the complicated nature of housing delivery through being a toolof assessment. The study is in the form of an evaluation as it mainly deals with obtaining answers relating to the views of the respondents on the sustainable human settlement program implemented as part of the DVRI in the BCMM. In doing so it, seeks to provide answers to some of the challenges faced by municipalities and other government departments so as to ensure that going forward, best practices are adopted in the housing delivery process. The findings from the study revealed primarily that, what is planned on paper is not often what is implemented on the ground. In evaluating the aims and objectives of the two sustainable human settlement pilot projects implemented as the BNG pilot projects through the DVRI, a considerable number of the objectives of the projects have not been met according to the beneficiaries. The reasons for the lack of satisfaction relating to the two projects as cited by the respondents included, amongst other things; dissatisfaction with the quality of the structure, lack of adequate services, lack of employment opportunities, lack of recreational facilities, lack of social facilities, lack of safe and reliable transportation and the general maintenance of the settlement. Solutions to the identified issues include; improved and meaningful participation between government, planners and the beneficiaries of such housing projects, so as to ensure that the views of the beneficiaries are considered and that they have a considerable influence on the decisions taken, thus promoting a bottom-up approach to the housing delivery process. The provision of key recreational and social amenities and the improved maintenance of the general settlement were also identified by the respondents as solutions.
29

Beneficiary perceptions of a low income housing scheme: Mdantsane township

Bandile, Unathi Cordelia January 2015 (has links)
The aim of this study was to investigate the socio-economic perceptions of the beneficiaries of the low income housing scheme in Unit P, of Mdantsane Township, under Buffalo City Metropolitan Municipality. Both quantitative and qualitative approaches were utilised in this study. For instance, questionnaires on the perceptions were administered amongst twenty (20) beneficiaries of this low housing scheme. Semi structured interviews were conducted amongst five (5) respondents who participated in the survey design. The study found that the intervention of providing poor people with houses was not appropriately done as these houses are too small and therefore fail to consider the families of the beneficiaries although the South African government seems to have succeeded to some extent in providing low income housing for the unemployed and those that belong to the low income category. The study also found that the location of Unit P poses a threat because it is located away from all the amenities compelling the beneficiaries to travel more than 5km to the amenities and essential services. The study therefore recommends that the government employs competent contractors that would do a proper job. State officials, tasked with overseeing the various state funded housing projects, have to ascertain the success of these projects by making sure that the contractors do not lack skills such as the ability to facilitate projects of a high magnitude as that could lead to flawed projects. They should be constantly monitored and post evaluated. This will help to minimize the wasting of state resources.
30

An investigation of the challenges facing the Nelson Mandela Bay Municipality in the provision of low-income housing

Li, Qiang January 2006 (has links)
The purpose of this study was to critically investigate challenges in the provision of low-income housing in the Nelson Mandela Bay Municipality (NMBM). In order to reach this goal, it was necessary to study the literature on the housing sector, especially as regards the impact between the external factors and the provision of low-income housing. A further supporting objective was to investigate and analyse the challenges in order to develop techniques and strategies for solving the challenges facing the NMBM in the provision of low-income housing. In order to address the reach problem and to fulfil the research objectives, an in-depth literature study was done. Empirical studies were also performed by means of face-to-face interviews and a questionnaire with the target group in the Housing Department of the NMBM. The literature and empirical study made it possible to identify underperformance and to recommend possible solutions for the challenges in the provision of low-income housing in the NMBM. These recommendations should be of value to all participants in the housing sector. From the investigation into the NMBM in the provision of low-income housing, the findings indicate that the constraints and challenges such as the housing backlog also exist in other parts of South Africa. Challenges such as availability of land in the NMBM can be considered to exist principally in the NMBM area. The new national policies and local government housing strategies should concur with the internationally accepted developmental approach. Recommendations were made with regard to sustainable development strategies, housing policies, finance and housing provision. Essential proposals were made, such as efficient financial support, and to train and improve certain unskilled staff in the NMBM. The study concludes with recommended techniques and strategies for the improvement of low-income housing in the NMBM, in order to overcome its challenges and to empower it on a sustainable basis.

Page generated in 0.7274 seconds