• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 20
  • 1
  • Tagged with
  • 21
  • 21
  • 20
  • 20
  • 20
  • 19
  • 19
  • 19
  • 19
  • 19
  • 18
  • 18
  • 17
  • 17
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Administrativní budova v Brně, stavebně technologická příprava stavby / Administrative building Brno, Civil technical project

Sokola, Jiří January 2017 (has links)
Thesis I worked on a project basis provided the building permit for an office complex of two identical fourth storey buildings which from the first storey intersects the inner atrium. The buildings are located within the CTZone Brno in the street Masna. The buildings are designed so that the ground floor is a garage for cars and retail space for rent and above-ground floors are reserved for office space lease. Objects are based on a floating pile conducted by the CFA, which builds prefabricated concrete skeleton. The cladding is formed by a combined system of aluminum windows, masonry face and sheet plotted on a system of stainless steel brackets. Roofing of buildings is done running flat roofs, the roofing of the atrium serves as a walkable roof. The garage is designed bearing slab plate fitted topping for added durability. Internal Partition Walls and walls are made of aerated concrete blocks. Thesis deals with construction technological preparations for the construction and contains a technical report, coordinating the situation buildings with wider relationships routes, time and financial plan, study the implementation of the main stages, the project site equipment, design tools, technological regulation, inspection and test plan, itemized budget, comparing two designs rough superstructure and appropriate drawings.
12

Příprava realizace administrativních objektů Palmovka Park / Preparation for the implementation of administrative buildings Palmovka Park

Boucník, Jan January 2018 (has links)
The diploma thesis deals with the preparation of the construction of Palmovka Open Park III administrative building. It contains a technological regulation for drilled piles, technological regulation for reinforced concrete monolithic constructions, broader transport routes, study of the implementation of the main technological stages, design of building machines and mechanisms, control and testing plan for drilling piles and reinforced concrete constructions, risk and measures, time and financial plan, calculation according to THU, drawing of site equipment, cycle, timetable, item budget, selected technological details.
13

Stavebně technologický projekt polyfunkčního domu Sokolská 5 v Olomouci / Construction and technological project of polyfunctional building Sokolská 5 in Olomouc

Slováček, Ondřej January 2018 (has links)
The subject of this diploma thesis is the elaboration of the building project of Polyfunkční dům Sokolská 5. In the course of the diploma thesis is elaborated a summary technical report, report of building site and drawings for individual stages. The implementation of the waterproofing of the base structure and the reinforced concrete monolithic skeleton are subject to technological regulations and control and test plans. In this work the object time and financial plan, the use of machines and mechanisms and health and safety at work are also solved. For the main building objects, an item budget and a detailed schedule are prepared. Part of this work is also the calculation of the heat transfer through the envelope of the building.
14

Obytný areál Ponavia park v Brně, příprava a organizace stavby / Preparation and Organization of Construction

Hladký, Dominik January 2020 (has links)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
15

Rekonstrukce a přístavba Městského muzea Česká Třebová - příprava realizace a řízení stavby / Reconstruction and exctension of the City Museum Česká Třebová

Strnadová, Lenka January 2014 (has links)
Master thesis solves construction and technological project which deals with data processing, documentation and technological processes of building reconstruction and extension realization in Muzeum of Česká Třebová. The work contains technological building study, assessment of relationships to the wider transportation routes, time and financial plan, building-site organization project, design of the main building machines and mechanisms, technological prescriptions for excavation work and micropile injection, occupational safety and health protection management, project calculation budget.
16

Centrální objekt nemocnice v Uherském Hradišti - stavebně technologická příprava stavby / Central hospital buildings in Uherske Hradiste - Building construction technology preparation

Novotný, Zdeněk January 2015 (has links)
This diploma thesis deals with construction and technological preparation of the construction of the central hospital building in the town Uherske Hradiste. The work is composed of selected parts of the building and technological project, which is annexed to the diploma thesis. On some selected parts of the building and technological project is also prepared relevant drawings. The aim of the thesis is to choose a suitable and effective implementation process object depending on the circumstances and determine the resources of time, funds, personnel and materials.
17

Stavebně technologický projekt výrobní haly Massag v Bílovci / Construction technological project of factory hall in Bílovec

Carbol, Štěpán January 2017 (has links)
This thesis addresses the construction of steel buildings in Bílovec. In this work we are solved structurally technological study of the construction of steel buildings. The work deals with the traffic situation around the building and a landing distance. The thesis focuses on the installation for the steel skeleton and industrial floors of wire reinforced concrete, time and financial plan, project, site equipment, design of main construction machines and mechanisms, timelines, capital construction object, then control plan for the steel skeleton and industrial floor. Moreover, it is processed itemized budget including bills of quantities, Risk Plan for the steel skeleton and industrial flooring and design details. The basis for this work was the design documentation for the realization of this project.
18

Příprava realizace víceúčelového domu Brno - Klíčova / Preparation realization multipurpose building Brno - Klíčova

Sviták, Roman January 2014 (has links)
The thesis is focused on the preparation of realization the multipurpose building Brno - Klíčova. The content of this the thesis is study of construction technology followed by the construction technology project. The aim of the thesis is to identify the sources of the time, money, workers and materials of the building and then select the appropriate process of realization.
19

Centrální dispečink pro řízení železniční dopravy Praha - příprava realizace a řízení stavby / Central control rail traffic management Prague - preparation for the implementation and management of buildings

Buček, Radek January 2016 (has links)
The thesis deals with the preparation of the implementation and management of building central dispatching of rail traffic management Prague. The thesis contains the selected part of building technological project together with appropriate drawings. The project addresses mainly the rough construction of the mainbuilding.The aim of this thesis is to design appropriate and effective way of realization of construction depending on local conditions.
20

Stavebně technologický projekt výstavby polyfunkčního domu lokalita Nová Nitra / Constructive-technological project of building polyfunktion house locality Nova Nitra

Malý, Filip January 2012 (has links)
The content of this thesis is the construction project of technological multifunctional building new locality Nitra the Slovak Republic. Individual points outline the project, which are dealt with in this thesis can be divided into subcategories, depending on the type of information provided. The first category can include items such as a technical report to the STP, which describes the basic information about the objects constructed building including the construction situation, location of the site including links to transport and technical infrastructure and rough timetable for the construction of all buildings. The second category can include no specific calculation and optimization outputs such as itemized budget polyfunctional house SO-07.03, drawing of the site including all buildings proposed site and their economic evaluation, sizing of utilities for supplying water and electricity construction site, design of building machines and mechanisms including determining the time of deployment, technological regulation for the implementation of monolithic roof structure, including financial balance sheets prepared by the deployment of slab formwork. The last category included in the thesis are legislative requirements that must be observed and kept in the course of the construction plan is constructed as a safety and health at work, including security risks drawn up, inspection and testing schedule for monolithic construction and a list of environmental risks that may arise during implementation.

Page generated in 0.0563 seconds