Spelling suggestions: "subject:"aintenance operations"" "subject:"emaintenance operations""
1 |
Logistics and maintenance options to support the P-8A Poseidon's expeditionary missionCalamug, Bernard F. Trout, James A. January 2010 (has links) (PDF)
"Submitted in partial fulfillment of the requirements for the degree of Master of Business Administration from the Naval Postgraduate School, June 2010." / Advisor(s): Yoho, Keenan ; Nalwasky, Richard. "June 2010." "MBA Professional report"--Cover. Description based on title screen as viewed on July 14, 2010. Author(s) subject terms: Anti-submarine Warfare (ASW), Anti-surface Warfare (ASUW), and Intelligence, Surveillance, and Reconnaissance (ISR), P-8A Poseidon, Expeditionary, Forward Operating Location (FOL), Logistics, Maintenance, JOPES Includes bibliographical references (p. 39-41). Also available in print.
|
2 |
Framework for compressed workweek implementation for TxDOT maintenance forces and flexible work arrangements for employeesLoskorn, Jeffrey Aaron 16 February 2012 (has links)
With the increasing need for highway maintenance and the decreasingly available funds, the Texas Department of Transportation (TxDOT) Austin District has sought to better utilize maintenance section employee resources by implementing a compressed workweek. The primary goal of this thesis is to establish a framework and methodology to study the effects of a compressed workweek on maintenance crews in both rural and urban environments. Secondly, this thesis will provide a background of best practices of popular flexible work arrangements, including compressed workweeks, telework, and flextime. The compressed workweek is a type of flexible work arrangement that allows employees to work longer days during a part of the week in exchange for a partial or full day off later in the week. Compressed workweeks can offer numerous benefits to maintenance crews, including increased production, less set up and shut down time per week, decreased operating costs, reduced overhead, and increased employee morale. TxDOT will implement a six-month pilot project in two rural maintenance sections and one urban section. Compressed workweeks have proven to be successful in other districts with rural maintenance sections, but application of a compressed workweek in an urban maintenance section has yet to be studied. Therefore, maintenance crew activity data from previous years will be compared to data collected during the trial period to understand changes in productivity and to estimate vehicle operating costs. Lastly, surveys of maintenance employees will be conducted throughout the study to solve any personal issues that arise as well as determine employee satisfaction with the new schedule. / text
|
3 |
Facility Management Process Improvement for Small National Parks in the Southeast Region of the United StatesJackson, James Charles 12 April 2004 (has links)
This thesis illustrates a process by which small organizations in the National Park Service can implement minor changes in current management and contracting practices to achieve measurable improvements in economy and efficiency by applying the principles and procedures outlined for competitive sourcing studies in Office of Management and Budget Circular A-76 (May 2003).
|
Page generated in 0.1039 seconds