Spelling suggestions: "subject:"managemement risk"" "subject:"managemement disk""
11 |
Tool support for social risk mitigation in agile projects a thesis submitted in partial fulfilment of the degree of Master of Computer and Information Sciences (MCIS) at the Auckland University of Technology, Auckland, June 2007 /Licorish, Sherlock Anthony. January 2007 (has links)
Thesis (MCIS - Computer and Information Sciences) -- AUT University, 2007. / Primary supervisor: Anne Philpott. Co-supervisor: Professor Stephen MacDonell. Includes bibliographical references. Also held in print (x, 147 leaves : ill. ; 30 cm.) in City Campus Theses Collection (T 005.12 LIC)
|
12 |
Farming risks in the Upper Eyre Peninsula : AGRIC 7010 Project C (ANR) (one semester) /Nguyen, Cao Nam. January 2002 (has links) (PDF)
Thesis (M.Ag.Bus.)--University of Adelaide, Dept. of Agronomy and Farming Systems, 2002. / "November 2002." Bibliography: leaves 73-80.
|
13 |
Improving the U.S. Navy's execution of technical authority through a common risk management and technical assessment processTomaiko, Thomas Andrew. January 2008 (has links) (PDF)
Thesis (M.S. in Systems Engineering Management)--Naval Postgraduate School, September 2008. / Thesis Advisor(s): Matthews,, David F. ; Roberts, Benjamin J. "September 2008." Description based on title screen as viewed on November 5, 2008. Includes bibliographical references (p. 89). Also available in print.
|
14 |
Applying risk management to reduce the time in lay-up while increasing the cost effectiveness of a Nimitz (CVN 68) class aircraft carrier in dry dock during the execution phase of a refueling and complex overhaulRahming, Kiah Bernard. January 2009 (has links) (PDF)
Thesis (M.S. in Systems Engineering)--Naval Postgraduate School, March 2009. / Thesis Advisor(s): Langford, Gary O. "March 2009." Description based on title screen as viewed on April 23, 2009. Author(s) subject terms: Systems Engineering Process, Risk Management, Risk Analysis, Risk Matrix, Cost Effectiveness, Time Effectiveness, Refueling and Complex Overhaul. Includes bibliographical references (p. 111-114). Also available in print.
|
15 |
Historical risk assessment of a balanced portfolio using Value-at-RiskMalfas, Gregory P. January 2004 (has links)
Thesis (M.S.)--Worcester Polytechnic Institute. / Keywords: Portfolio Risk; Monte Carlo Simulations; Value-at-Risk. Includes bibliographical references (p. 39).
|
16 |
Applying the PDRI in project risk managementWang, Yu-ren, January 2002 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2002. / Vita. Includes bibliographical references. Available also from UMI Company.
|
17 |
Value at risk models for a nonlinear hedged portfolioLiu, Guochun. January 2004 (has links)
Thesis (M.S.)--Worcester Polytechnic Institute. / Keywords: hedging; value at risk; risk measure; risk management. Includes bibliographical references.
|
18 |
Developing an integrated risk management system in emergency management process /Mitra, Amlan. January 1992 (has links)
Major paper (M.U.R.P.)--Virginia Polytechnic Institute and State University, 1992. / Vita. Abstract. Includes bibliographical references (leaves 64-69). Also available via the Internet.
|
19 |
A quantitative liquidity model for banksSchmaltz, Christian. January 2009 (has links)
Diss.: Frankfurt (Main), Frankfurt School of Finance & Management, 2009. / Inludes bibliographical references (p. 217-223).
|
20 |
A Study of the Delta-Normal Method of Measuring VaRKondapaneni, Rajesh. January 2005 (has links)
Thesis (M.S.) -- Worcester Polytechnic Institute. / Keywords: VaR; Delta-normal method. Includes bibliographical references (p. 39).
|
Page generated in 0.0879 seconds