• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • No language data
  • Tagged with
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

IMPROVING FARM MANAGEMENT DECISIONS BY ANALYZING PRODUCTION EXPENDITURE ALLOCATIONS AND FARM PERFORMANCE STANDING

Osborne, William A 01 January 2013 (has links)
This study examines the potential effects of categorical increases in production expenditures on farm income performance according to farm standing. The objective of this study is to expose differences in anticipated net farm income return from production expenditure investments and the optimal expense allocation strategy for each performance level. Studying farm performance through segregation by utilizing a two-tier analysis and quantile regression acknowledges the possibility that managerial strategy can differ based on managerial ability. Study outcomes are useful to farm managers because they offer more prescription style results and interpretations than found in other farm performance studies. Study findings show that as managerial proficiency increases so does a manager’s ability to extract higher returns from additional expenditures in certain input categories. Additionally, better managers are able to produce higher returns from more investment sources than their lower performing peers. Overall, study results and interpretations point to the importance of farm management ability as the key input for improving farm performance.
2

A model for predicting the performance of project managers in mass house building projects in Ghana

Ahadzie, Divine Kwaku January 2007 (has links)
Presently, within the human resource management (HRM) genre and including the construction management discipline, the identification and development of appropriate performance measures is seen as the only viable means for validating and engendering managerial excellence. There is also a growing awareness that appropriate predictive modelling practices can help engender the identification and development of these measures. Against the background that project-based sectors of the construction industry in developing countries need to adopt a proactive approach towards recognising and embedding performance measures in HRM practices, this thesis addresses the development of a model for predicting the performance of project managers (PMs) in mass house building projects (MHBPs) in Ghana. A literature review of the significance of performance measures in the HRM genre is first presented including an evaluation of the methodologies for measuring the performance of PMs. This is followed by a review of research and development in the management of human resources in the construction industry in developing countries including Ghana. Informed by the literature, an appropriate theoretical framework is adopted which draws on the organisational psychology theory of job performance, the conventional wisdom in project success criteria and an emerging framework of project lifecycle. Subsequently, a competency-based multidimensional conceptual model is developed. The conceptual model reflects both the elements of performance behaviours and outcomes in predicting the performance of PMs at the conceptual, design, tender, procurement, construction and operational phases of the project lifecycle. Adopting positivism as an appropriate research paradigm, structured questionnaire survey is used to elicit the relevant data from property developers in Ghana for the construction phase of the project lifecycle. Subsequently the data is analysed using one-sample t-test, factor analysis and multiple regression analysis (stepwise). From a broad range of competency-based measures used as independent variables, it is found that, the best predictors of the PMs’ performance at the “construction phase” of MHBPs are: job knowledge in site layout techniques for repetitive construction works; dedication in helping works contractors to achieve works programme; job knowledge of appropriate technology transfer for repetitive construction works; effective time management practices on the house-units; ability to provide effective solution to conflicts while maintaining good relationships; ease with which the PM is approachable by works contractors; and volunteering to help works contractors solve personal problems. These independent variables explained 74.4% of the variance in the model (at p < 0.0005). Validation of the model confirmed its goodness of fit and hence predictive accuracy. The findings suggest that at the construction phase of MHBPs, PMs who exhibit these behavioural competencies are likely to achieve higher levels of performance. Accordingly, PMs who aspire to achieve better managerial performance outcome on MHBPs should strive towards developing and improving these competencies. It is contended that the developed model could be used by property developers for the selection and recruitment of potential PMs and also for developing appropriate training requirements towards best practice improvement in the implementation of MHBPs. While the study focuses on Ghana, there is the potential for the model to be adopted for use by other developing countries towards the advancement of improved HRM activities in project management practice.

Page generated in 0.0777 seconds