• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 5
  • 5
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Object-oriented real-time simulation for a manufacturing facility

Lanka, Somanath January 1994 (has links)
No description available.
2

Industry-Situated STEM Labs: A Case Study of a Novel Application

William H Walls (9745313) 18 December 2020 (has links)
Abstract: The purpose of this research was to understand: (1) the influence that an industry-situated STEM lab experience has on students’ (ages 10-18) perceptions of careers in manufacturing, and (2) the challenges and opportunities that this space presents. To answer these questions, this study analyzed participant pre- and post-draw a manufacturer tests as well as manufacturing career perception surveys that included Likert-scale items and open response questions. Along with these data sources, five semi-structured interviews were conducted with industry stakeholders in order to understand the conception and operation of the STEM lab, as well identify any challenges or opportunities to improve or replicate success for other industries. From there, the data were analyzed through thematic coding for the drawings, open-response questions, and interviews, and a Mann-Whitney U test was performed on the survey results in order to look for general shifts in responses to specific questions from before to after the STEM lab experience. The results gained from the three different data collection techniques were looked at in aggregate and used to triangulate specific understandings, questions, and recommendations. The results confirmed a lack of students’ awareness and understanding of manufacturing, misperceptions surrounding the careers within, and a disconnect between industry needs and educational output. Along with the data, literature on vocational psychology supports the need for students to participate in authentic learning opportunities to build self-efficacy and form more accurate outcome expectations with regards to future career selection. However, the data did reveal that the industry-situated STEM lab experience likely led the participants to an improved understanding of the manufacturing ecosystem and provided an opportunity for local educators to engage with industry. While this research looked at a novel application of a STEM lab and highlighted its influence on students’ perceptions of manufacturing careers, there is obviously no “silver bullet” for fixing the talent pipeline for manufacturing and continuous work in this area needs to be done.
3

A MASS AND ENERGY BALANCE ANALYSIS FOR SUSTAINABLE MANUFACTURING IN THE EXPANDER MANUFACTURING INDUSTRY

Sruthi Nutakki (14232866) 09 December 2022 (has links)
<p>The primary goal of the research is to examine the expander manufacturing process of an industry, observe how the industry may sustainably be manufacturing elements throughout its entire manufacturing process, and analyze the advantages of doing so. It will also look at the challenges that would arise if these manufacturing processes were altered to make them more sustainable and environmentally friendly.</p>
4

Manufacturing Facility Layout: A Methodology Incorporating Rotated Aisles into Layout Design

Marinchek, Dean A. January 2014 (has links)
No description available.
5

Výrobní areál LIWA v Pelhřimově - příprava realizace a řízení stavby / LIWA manufacturing facility in Pelhřimov - implementation of construction

Jůn, Michal January 2017 (has links)
The aim of the thesis is the process of building technological project LIWA manufacturing facility in Pelhřimov. It deals mainly a technological process for the realization of the main building. The thesis contains a technical report, technological specification, control and test plan. Other parts of the work are time and financial plan, machine and mechanic design, project about equipment of construction site and time schedule. The annexes are further addressed drawings of the building site equipment.

Page generated in 0.0692 seconds