Spelling suggestions: "subject:"bimechanical assembly"" "subject:"bimechanical asssembly""
71 |
Průmyslový areál AQUASYS - stavebně technologický projekt / Industrial comlex AQUASYS - construction and technological projectJuračka, Lukáš January 2012 (has links)
This Master’s thesis deals with the technological project of building an industrial complex AQUASYS in Žďár nad Sázavou. This work includes technical reports ZS and STP, site equipment, wider transport relations, budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work and job security for this building.
|
72 |
Stavebně technologický projekt bytového domu typ M6,Brno-Slatina / Constructive-technological project of block of flats type M6, Brno SlatinaKuchaříková, Vlasta January 2012 (has links)
In my masters thesis I deal with constructive technological project to build a residential building site technology. The aim is to solve the structure in terms of time, financial and material requirements based on technical data submitted by the designer and client requirements. Architectural and technological project of the thesis contains, in particular building equipment, technological regulations, schedule, financial budget, design mechanical assembly, inspection and test plan, health and safety, ZOV, waste management, etc.
|
73 |
Technologický projekt sportovní haly v obci Nové Veselí / Technological project of a sports hall in Nové Veselí villageVaněk, Jiří January 2012 (has links)
This Master's thesis deals with the technological project of sports hall in New Veseli . This work includes the construction and technological equipment for the study site , ZOV , technological regulations, building equipment, wider transport relations, budget calculation , time planning , inspection and test plan , design mechanisms , job security this building , balance resources.
|
74 |
Výukový pavilon 2. LF Univerzity Karlovy v Praze – stavebně technologický projekt / Educational pavilion of the 2nd medical faculty of Charles university in Prague – vonstruction technology projectPaštika, Martin Unknown Date (has links)
The subject of this diploma thesis is technological preparation of educational pavilion 2.LF UK in Prague 5. The diploma thesis contains study of the main technological phases of the object, project of the site equipment, useful machines, time schedule, budget, technological prescription for reinforced concrete construction, project of the formwork for floor slab, control plan. The basis for technological preparation in this diploma thesis is design documentation.
|
75 |
Realizace bytového domu v Brně - stavebně technologický projekt / Implementation of Apartment House in Brno - Building Contruction ProjectPospíšil, Dominik Unknown Date (has links)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
|
76 |
Administrativní budova Lomnického - stavebně technologická příprava stavby / Administrative building Lomnického - Building technology preparation of constructionHanzlík, Vlastimil January 2019 (has links)
This diploma thesis focuses on the construction and technological preparation of the office building in the Lomnického street. The aim of this work is to choose the appropriate construction process. The thesis contains a technical report of a construction and technological project, solutions of wider transport relations, time and financial object plan, itemized budget, design of a site equipment, design of the main building machines and mechanisms, time schedule, technological regulation, inspection and test plan, calculation of two options of the excavation of building pit and details to waterproofing of the substructure. In detail, the thesis is dedicated to secure the building pit enclosed by diaphragm walls.
|
77 |
Příprava realizace dostavby klinické hematologie FN Brno / Preparation of realization of completion of clinical hematology, University Hospital BrnoPrůcha, Aleš January 2020 (has links)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
|
78 |
Stavebně technologický projekt administrativní budovy firmy Ray Service, a.s. ve Starém Městě / Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré MěstoSeménka, Petr January 2020 (has links)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.
|
79 |
Stavebně technologický projekt Výzkumného centra Fakulty informačních technologií VUT v Brně / Construction technology project of Research centre Faculty of Information Technology in BrnoChytková, Monika January 2013 (has links)
This Máster´s thesis deals with technological project of building a Research Center of Information Technologies VUT Brno in Brno. This work includes technical reports SY and STP, site equipment, budget, calculation, time planning, inspection and test plan, mechanical assembly, estimate,technological regulations, environmental plan, contract for work and job security for this building.
|
80 |
Kabeltechnik Mikulov - stavebně technologická příprava / Kabeltechnik Mikulov - construction and technological preparationDvořáková, Michaela January 2013 (has links)
The subject of my diploma thesis is the technology of steel production hall and brick administrative building in the komplex of Kabeltechnik compalny in Mikulov. Thesis deals with design of construction site, construction and technological study of construction of steel manufacturing hall, items budget according to project documentation, financial and time planing, proposal of suitable mechanical assembly including lifting mechanisms, safety of work, environmental plan and monitoring and test planing.
|
Page generated in 0.0431 seconds