• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Metodología de cálculo de productividad de perforación y mejoras de gestión en minas a cielo abierto, aplicado a DRT

Valdés Soto, Sibila Tatiana January 2016 (has links)
Ingeniera Civil de Minas / Frente al actual escenario del precio del cobre y las proyecciones para lo que resta de 2016 se hace indispensable revisar los procesos de la cadena del negocio para identificar oportunidades de mejoras que permitan a la operación tener mayor eficiencia en términos de mejor productividad y menores costos, cumpliendo con los estándares de seguridad. En el negocio minero se tiene una serie de actividades para obtener como resultado los cátodos, dentro del proceso la primera operación unitaria es la perforación del macizo rocoso que permitirá junto con la tronadura, arrancar la roca para su traslado y posterior procesamiento. Por lo anterior, podemos deducir que los resultados de la actividad de perforación, generará efectos relevantes en las actividades que a este le siguen, y por ende, en el proceso global de la extracción de mineral. Este trabajo de título tiene por objeto identificar las interferencias de la operación de perforación de la División Radomiro Tomic (RT), para generar propuestas frente a oportunidades de mejora, así como establecer una metodología de estimación de los indicadores operacionales. La perforación en RT está compuesta por perforadoras: DML, PITVIPER y ROC L8. Para definir una línea base (LB), se estudia la data histórica de los indicadores operacionales en el periodo enero 2012- mayo 2015 de perforación, de la cual se puede concluir que es necesario actualizar los valores utilizados en planificación de largo plazo, pues hay brechas entre los resultados reales y lo programado a nivel de planes anuales y quinquenales. A fin de mejorar la estimación de la productividad de las perforadoras, se define que el rendimiento está afecto al tipo de roca y a la fase, mientras que la utilización efectiva es escrita en función de las demoras no programadas: traslado, tronadura, espera agua, cambio de aceros, corte de energía necesaria para la operación, espera de sitio para perforar y espera de energía/combustible. Así el cálculo de los metros es m=Disp_flota∙(24∙#_días∙#_(eq,flota)-DP_flota-Res_flota-∑_flota▒〖DNP∙F_x) 〗 La aplicación de esta metodología de cálculo que incluye las interferencias del proceso es realizada al mes de junio 2015 logrando una mejora en la estimación de un 23%. Finalmente, se utiliza la metodología LEAN-KAIZEN para propuestas de mejora que buscan una reducción global de un 20% en las demoras no programadas, estandarización y gestión visual. De acuerdo a la LB de 2015, de implementar estas propuestas y conseguir la meta es posible aumentar los metros perforados anuales en 60.500 m, equivalentes a un 75% de la producción anual de cada perforadora DML, lo que puede permitir prescindir de un equipo de la flota en arriendo para cumplir el plan. / Due to decrease of the copper price and its forecast for the second semester of the year, it is essential review the process value chain to identify opportunities to improve the efficiency in terms of major productivity and lesser costs, without affecting the standards on security. The first unitary stage of the cathode production is the rock mass drilling; this process, with the blasting, allow the rock extraction, its hauling and later treatment. According to this, better results in the drilling process, implies relevant effects on the subsequent stages, and then, an improvement in the global process of the mineral extraction. The goal of this work is identify the more relevant interferences in the drilling process of the Codelco-Radomiro Tomic (RT) mining company, to propose improvement chances to the production process and develop a methodology for the estimation of the effective use and the effective efficiency to the purpose of incorporate operational variables, e.g. designing parameters. The RT‟s drilling process has four (4) fleets: DML, PITVIPER and ROC L8. To stablish de base line is studied the historical data, from January 2012 to May 2015, of the drilling operational indexes. As result, is concluded the necessity of an update of the values used for the long term planning, since there are relevant gaps between the annual and quinquennial plans and the real results for the same periods. For the purpose of improve the estimation of the drilling productivity, is defined that the efficiency is a function of the rock type and the current cutback, meanwhile the effective use is a function of the seven (7) mainly unscheduled delays: hauling, blasting, pending water, steel change, energy cut, waiting for drilling site and pending fuel/energy. The function that calculate the drilling distance (in meters) is given by: Σ Where, is availability of each fleet, is average scheduled delays, is average reserve of each fleet, is average unscheduled delays and is bench saturation constant. The proposed calculation methodology is applied for June 2015, achieving an improvement of 23% of the distance drilling estimation. At last, based on the LEAN-KAIZEN methodology, are suggested a battery of proposal – based principally on standardization and visual management – aimed to reduce the unscheduled delays in a 20%. According to the base line of 2015, if the proposal are implemented, it will be possible increase the annual distance drilling in 60.500 m, which is equivalent to a 75% of the annual production of a DML drill; this would allow to dispense one (1) drill from the rented fleet. / Este trabajo ha sido financiado por División Radomiro Tomic, Codelco / 29/7/2021
2

Uso de modelos estocásticos para el cálculo de productividades de la Mina Radomiro Tomic

Bahamondes Navarrete, Jaime Andrés January 2014 (has links)
Memoria para optar al título de Ingeniero Civil de Minas / Radomiro Tomic (RT) es una mina a cielo abierto perteneciente a CODELCO Chile. Actualmente, RT explota minerales oxidados que son procesados en su propia planta, y minerales sulfurados que son enviados a la concentradora de la mina Chuquicamata, ubicada a 8.5 km de distancia. Adicionalmente, para el año 2018 y en marco del proyecto de expansión Sulfuros RT fase II , estará en funcionamiento la planta de procesamiento de sulfuros RT, aumentando a tres los lugares activos para el chancado del mineral. Se prevé un complejo escenario para el 2018 en relación al manejo de materiales de RT, producto del alto número de camiones estimados para la fecha (105) y de los 4 chancadores primarios que estarán en funcionamiento: 2 en sulfuros RT, 1 en óxidos y 1 de sulfuros Chuquicamata. Por cuanto este trabajo busca estimar, utilizando la teoría de colas, qué congestión se podría producir en los servicios de carguío y chancado durante ese año. Para la estimación de tiempos de cola en un circuito, Jorgen Elbrond propuso en 1977 una metodología basada en la teoría de colas, observaciones en terrero y en simulaciones. Utilizando esta metodología e incorporando modificaciones tales como en las horas de operación de los equipos, se construyó un modelo de RT para el mes de septiembre del año 2012, y una vez calibrado con datos reales se determinó una desviación en los tiempos de cola de 30% el cual al ser aplicado a data real se reduce a 25% (Error intrínseco). Luego de aplicar este modelo al sistema minero del 2018 se logra una re-estimación en el tiempo de ciclo medio como consecuencia de agregar el tiempo de cola, además de la re-estimación de los camiones efectivos. La Ilustración i muestra la diferencia del tiempo de ciclo medio y el total de camiones para la metodología tradicional y el caso con colas incorporadas. Ilustración i Tiempo de ciclo y número de camiones obtenido mediante el modelo y cálculo tradicional Considerando el error asociado del modelo calibrado, los camiones efectivos requeridos para el cumplimiento del plan aumentan en 9. Si bien esta herramienta no indica de manera precisa el número de camiones extra a comprar, por el error asociado a la estimación, sí entrega una información más fidedigna sobre el cumplimiento del plan minero pues la estimación del tiempo de cola es más cercana a lo que planificación de largo plazo realiza hoy en día. En cuanto a posibles mejoras del modelo a futuro, estas hacen referencia principalmente a cambios en el modelamiento, esto en términos de replanteamiento de las ecuaciones de teoría de colas, incorporando la fenomenología observada en las distribuciones de probabilidad.

Page generated in 0.3238 seconds