• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1588
  • 1095
  • 166
  • 89
  • 88
  • 63
  • 49
  • 47
  • 38
  • 25
  • 25
  • 25
  • 25
  • 25
  • 24
  • Tagged with
  • 3748
  • 584
  • 507
  • 400
  • 321
  • 317
  • 282
  • 270
  • 269
  • 255
  • 245
  • 234
  • 227
  • 216
  • 181
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Bergschakt 153 kopplad till enbergspänningsmodell i Kiirunavaara gruvan : Ore pass 153 connected to a rock tension model in the mine of Kiirunavaara

Sundelin, Alexander January 2017 (has links)
No description available.
42

The financing of mining exploration and development : sources of funds and decision criteria

Hales, Frederick William January 1966 (has links)
The search for promising mineral deposits and their development into producing mines require the expenditure of much larger sums of money than was formerly necessary for success. Mining is recognized as a risky business, and the suppliers of venture capital must be adequately compensated for assuming this risk. With the progressive development of a prospect, the uncertainty regarding its value is reduced and capital is more readily available at lower cost. As capital requirements have increased, greater reliance has been placed upon the internal resources of established producers. Equity capital is still supplied by the public for the hazardous first stages of prospecting and exploration, but later development and production financing is likely to be obtained from operating companies or financial institutions. Government guarantees, loans, and purchase agreements have been important in the financing of several large ventures. The development of a mining property is a stochastic production function, the outcome of which is probabilistic. In order to optimize this output, no more should be spent on a property than the expected realization of its present worth. This requires the continuous assessment of the probability of various outcomes and their financial results at each stage of the decision process. The purchase of information to further reduce the uncertainty of future earnings may be necessary before making the final commitment to production. The developer must also be assured of sufficient capital to complete mine development and plant construction. / Business, Sauder School of / Graduate
43

Financial optimization of mining plant size

McIntosh, Douglas Grant January 1970 (has links)
The hypothesis of this study is that the optimal plant size for a mining venture is dependent upon both uncontrollable and controllable variables. Examples of variables which are uncontrollable to the firm are characteristics of the orebody, capital and product markets, projected price levels, and tax structure. Controllable variables in determining plant size are rate of recovery, level of recovery, capital costs, and operating costs. The primary purpose of this study is to delineate the effects of these variables, both singly and jointly, upon plant size and to present a model which will interrelate the variables with that scale of plant which will maximize the value of the firm. A secondary purpose of the study is to compare the impact of both Canadian and United States tax laws upon the profitability of a given operation, and upon the optimal grade-capacity combination to be employed for a given orebody. The difference of the impact of Canadian and United States tax laws with respect to the conservation of resources is also considered. After each of the controllable and uncontrollable variables is defined and analysed, a detailed analysis is made of various methods of mine valuation, with the objective being to identify the valuation method which most closely relates to the value of the firm. Then a model is constructed which will give the mine-life annual cash flows for a given orebody under various concentrator-capacity--cut-off-grade combinations. These cash flows are then converted to internal rates of return and benefit-to-cost ratios, which are contoured for various cut-off grades and concentrator capacities under various metal prices. The model assumes an orebody with a tonnage of 40e ⁽²ˉ ⁵x⁾ million tons, where x is the cut-off grade, in percent copper. Contour plots of benefit-to-cost ratio and internal rate of return were constructed for cut-off grades ranging from 0% to 1% copper, and for concentrator capacities ranging from 5000 tons-per-day to 50,000 tons-per-day, at net smelter returns of 40¢ per lb. to per 46¢ per lb. of contained copper. The tax system under which the highest profits are attained is Canadian tax laws with pre-1968 British Columbia taxes. The operation is least profitable under United States tax laws. However, optimal plant size is least sensitive to changes in metal price under United States tax laws, and most sensitive to price changes under Canadian tax laws with pre-1968 British Columbia taxes. Similarly, optimal cut-off grade is most insensitive to changes in metal price under Canadian tax laws with pre-1968 British Columbia taxes, and most sensitive to product price changes under United States tax laws. Therefore, it can be shown that under United States tax laws, the response of an operation to changing product prices would be to change the optimal cut-off grade, while in Canada, particularly under pre-1968 British Columbia taxes, the response would be to change the optimal operating capacity. Therefore, American tax laws provide the greatest flexibility for responding to changes in product price. The tax system which produces the greatest degree of conservation of resources, as is reflected by completeness of ultimate extraction, is the American case. The lowest extraction level would result under Canadian taxes, with pre-1968 British Columbia/taxes. / Business, Sauder School of / Graduate
44

Aspectos economicos da exploração mineral

Shintaku, Isao 01 June 1998 (has links)
Orientador: Saul Barisnik Suslick / Dissertação (mestrado) - Universidade Estadual de Campinas, Instituto de Geociencias / Made available in DSpace on 2018-07-24T00:38:24Z (GMT). No. of bitstreams: 1 Shintaku_Isao_M.pdf: 2621216 bytes, checksum: f061204622b6653114e6ae755fc0ea2a (MD5) Previous issue date: 1998 / Resumo: Este trabalho aborda os principais fatos econômicos que envolvem a exploração mineral, indo desde os aspectos geológicos, seleção de áreas, passando pelo o investimento inicial, suas dificuldades e deficiências, suas características, bem como o comportamento dos investimentos na exploração mineral no Brasil e em outros países. O Brasil, um dos maiores potenciais mineiros do mundo, tanto pela sua extensão territorial como por sua diversidade geológica, sofre uma perda significativa nos investimentos em pesquisa mineral, pois não oferece um clima adequado aos moldes internacionais, para entrada de capitais, comprometendo, o processo de geração de jazidas e, conseqüentemente, a descoberta de novas minas e o seu aproveitamento. Um levantamento comparativo dos investimentos em exploração mineral em diversos paises contemplando período o 1986-1995 indica que o Brasil ainda não ocupa uma posição de destaque no cenário mundial. Foram identificados nesta dissertação os riscos da exploração mineral, os tipos, e como podem ser administrados. Além disso, foi feita uma análise dos fatores que influenciam a tomada de decisão de um investimento mineral e, sob a forma de estudo de caso, foram abordados os aspectos econômicos do ouro / Abstract: This work deals with the main economic facts in which are included the mineral exploration, geological aspects, selection of areas, initial investments, its difficulties and deficiencies, its features, as well as the behavior of the mineral exploration in Brazil and other countries. Brazil, one of the greatest mining potentialities in the world, for its land extension, as well as because of its geological diversity, is undergoing a significant lost in mineral research investments, because it does not offer an adequate structure for the entrance of capital, according to the international patterns, weakening new mineral deposits generation and consequently the discovery of new profitable mines. A comparative study, in the 1986-1995 period, regarding investments in mineral exploration in many countries, shows that Brazil does not occupy a distinguished position in the world scenery yet. In this work, the mineral exploration risks were realised and how they can be managed, as well as, an analysis of the factors that influence on the decision of a mineral investment. As a case study, the gold economic features were discussed. / Mestrado / Administração e Politica de Recursos Minerais / Mestre em Geociências
45

Optimering av sprutbetonganvändning vid bergförstärkning i Zinkgruvan / Optimization of shotcrete use for rock reinforcement in Zinkgruvan

Thunander, Eric January 2021 (has links)
Vid ortdrivning i Zinkgruvan förstärks väggar, tak och lastarrader  med sprutbetong. De två volymer på sprutbetong beställningar är 5,5 kubikmeter och 7 kubikmeter. I dagsläget använder Zinkgruvan en c-sprutning vid förstärkning av orter med sprutbetong. Zinkgruvan utför inte betongsprutingar själva utan hyr in en underentreprenör som utför jobbet.  Med hjälp av Zinkgruvans beräkningsprogram som räknar ut den volym som behövs för olika gavlar/orter har projektet skapat ett verktyg för hur mycket sprutbetong som behövs för både c och b-sprutningar. En c-sprutning täcker hela ortens väggar och tak med sprutbetong medan en b-sprutning sprutar från 1,5 m upp på väggen, anfang och tak. Projektet har även skapat en logg tillsammans med arbetsledarna på ort där det loggas hur mycket extra sprutbetong beställs ner till orter/gavlar där det behöver kompletteringssprutas. Resultatet från beräkningsverktyget och loggen visar att det finns goda möjlighet att spara sprutbetong.  Genom att förändra rutinerna och gå från en c till en b-sprutning behövs inte 7 kubikmeter lass. En b-sprutning klarar sig på 5,5 kubikmeter lass. Detta innebär att b-sprutningar har flera fördelar, arbetsgången  blir mer flexibel och Zinkgruvan kan om det behövs ändra ordningen på gavlarna utan att det stör produktionen. Även 50% av sprutbetongen som läggs på lastarrader kan sparas genom att man minskar sprutad yta och tjocklek på lastarder. Där krävs däremot förbättrade rutiner kring säkerhet och fjärrstyrning av fordon för att kunna gå vidare med detta. Genom att ändra kontraktet med underentreprenörer till ett helhetsansvar för sprutbetong, betongsprutningen och köp av sprutbetong fås tydligare ansvarsgränser vilket leder till att Zinkgruvan kan ställa bättre krav på utförande och kvalité. Denna förändring borde medföra att man kan minska onödiga kompletteringssprutningar. Dessa tre åtgärder har en potential att tillsammans minska den totala sprutbetongmängden med ungefär 20%. Dessa besparingar i sprutbetong medför även stora minskningar i CO2 belastningen för Zinkgruvan. / During drifting in Zinkgruvan, walls, roofs and tunnel faces are reinforced with shotcrete. The two order volumes of shotcrete are 5.5 cubic meters and 7 cubic meters. At present, Zinkgruvan uses a c-reinforcement when strengthening drifts and tunnel faces with shotcrete. Zinkgruvan does not carry out any concrete spraying itself but hires a subcontractor to do the work. Using Zinkgruvan’s calculation on the volume needed for different drifts and tunnel faces the project has created a calculation tool for how much shotcrete is needed for both c and b spraying. C-reinforcement covers the entire walls and ceiling of the drift with shotcrete while b-reinforcement sprays from 1.5 m up on the wall and ceiling. The project created a log together with the site supervisors where they logged how much extra shotcrete is ordered to supplement the incomplete sprayings. The results of the calculation tool and log show that there is a good opportunity to save shotcrete volume. By changing the routines and moving from c to b-reinforcement, 7 cubic load is not needed as b-reinforcement can cope with a 5.5 cubic load. This means that b-reinforcement has several advantages, the production planning becomes more flexible and Zinkgruvan can, if necessary, switch orders of spraying the drifts without disturbing the daily production. 50% saving of the shotcrete sprayed on tunnel faces can be achieved by reducing sprayed surface area and the thickness of shotcrete on tunnel faces. However improved procedures around safety and remote-controlled vehicles are required to move forward in this matter. By changing the contract with the subcontractor to a contract with overall responsibility for the shotcrete spraying and purchase of shotcrete, creates clear limits of liability, which means that Zinkgruvan can put clearer demands on quality and execution. This change should minimize all unnecessary supplement spraying with shotcrete. These three measures have the potential that together reduce the total shotcrete amount by approximately 20%. These savings in shotcrete also lead to large reductions in CO2 emissions.
46

Evaluation of the relation between ore texture and grindability

Ghanei, Javad January 2020 (has links)
No description available.
47

Flaskhalsar i tillredningsprocessen : Zinkgruvan, Lundin Mining / Bottlenecks in the drifting process : Zinkgruvan, Lundin Mining

Hasbo Olsson, Carl, Westin, Pontus January 2020 (has links)
Nyckeln till en framgångsrik produktionskedja bygger på att samtliga moment arbetar efter dess fulla prestanda. Blir det avbrott i produktionen kan det föranleda förseningar och onödiga kostnader för företaget. Idén till detta examensarbete grundades då Zinkgruvan lyfte problematiken med flaskhalsar i tillredningsprocessen. Målet blev då att identifiera dessa flaskhalsar och finna anledningen till att dem uppstår. Vidare skulle examensarbetet resultera i åtgärdsförslag för att delvis eller helt eliminera problemet med flaskhalsarna som identifierats vid undersökningarna av tillredningsprocessen. För att nå det uppsatta målet utfördes litteraturstudier samt ett antal fältbesök som arrangerades nere i gruvan. Litteraturstudier ämnade ge djupare förståelse om studieobjektet samt finna matematiska samband som möjliggjorde identifiering av flaskhalsar. Avsikten med de fältbesök som arrangerades var att möjliggöra datainsamling beträffande tider på de olika momenten i tillredningsprocessen.   Examensarbetet resulterade i två matematiska samband som beskriver hur en flaskhals kan identifieras med avseende på kapacitet och utnyttjandegrad. Sambanden tillsammans med den datainsamling som utfördes i gruvan genererade beräkningar som antydde att lastningen var flaskhals som utmärkte sig i båda avseenden, kapacitet och utnyttjandegrad. Utökad infrastruktur i de områden där långa körsträckor för lastningen råder blev ett åtgärdsförslag för att begränsa tidsåtgången. En annan åtgärd som föreslagits var att utöka den del av Zinkgruvans maskinpark som beträffar lastningen. Anledningen till att lastningen blir flaskhalsen visade sig i slutändan bero på mer än en orsak. Bland annat var en anledning långa körsträckor till och från arbetet för lastningen. Resultatet beträffande flaskhalsar i Zinkgruvan blev endast en generalisering. En viktig slutsats blir således att det skulle krävas många fler mätningar för statistisk signifikans. / The key to a successful production line demands full performance from all steps involved. If an interruption in the production occurs, it may cause the company delays and unnecessary expenses. The idea for this degree project was established when Zinkgruvan mine first brought up the problems with bottlenecks in the drifting process. Thus, the objective of this project was to identify these bottlenecks as well as the reasons for their origin. Furthermore, the results from the bottleneck detection would end up being analyzed and used to suggest solutions to partly, or entirely eliminate the origin of the bottlenecks. Crucial to reach the objective were literature analysis and field studies arranged in the mine. The purpose of literature analysis was to grant deeper knowledge of the subject itself whilst finding mathematical relations which could enable identification of bottlenecks. The main purpose of the field studies was to gather data concerning time whilst achieving a deeper understanding of the production process in the Zinkgruvan mine.   The result ended up with two mathematical relations describing how a bottleneck, in theory, can be detected with respect to capacity and utilization. Those relations combined with the data gathered in the mine generated calculations implying that loading made the bottleneck in both categories, capacity and utilization. Extended infrastructure in the areas where long loading distances occur, became one of the suggested solutions to limit expenditure of time. Another solution suggested was to increase the amount of machinery regarding loading. In the end, the reason as to why loading became the bottleneck turned out to depend on various factors. Amongst others, one reason turned out to be the long mileages back and forth the current working site. The result regarding bottlenecks in the Zinkgruvan mine ended up being only a generalization, thus, a very important conclusion states that more data regarding time is required to make the result statistically significant.
48

Särhållning av gruvavfall med avseende på syrabildande potential : en studie av svenska sulfidmalmsgruvor / Selective handling of acid producing mining waste : A study of Swedish sulphide ore mines

Sellin, Jessica January 2016 (has links)
Gruvavfall utgör över 80 % av den totala mängden avfall i Sverige. Avfallet från gruvindustrin kan påverka våra ekosystem negativt om tungmetaller och försurande ämnen lämnar materialet. I Sverige utgör avfall från sulfidmalmer störst risk för miljön eftersom det innehåller mineral som genom kontakt med luft vittrar och producerar surt och metallhaltigt lakvatten. Efterbehandling av dessa material är viktigt för att förhindra läckage till omgivningen. Eftersom efterbehandling är en kostsam process hänvisar Stiftelsen för Miljöstrategisk Forskning i första hand till särhållning av materialet med avseende på syrabildande potential. I denna studie har undersökts vilka förbättringsmöjligheter som finns för särhållning av avfall inom gruvindustrin. Arbetet har utförts genom studier av miljörapporter, avfallshanteringsplaner samt kommunikation med Länsstyrelser och Naturvårdsverket. De förbättringsmöjligheter som i denna studie identifierats rör utformning av kriterierna för klassning av syrabildande potential samt metodik vid bestämning av syrabildande potential. Inför framtida särhållning bör kriterierna för vad som klassas som icke syrabildande material skärpas såtillvida att de bättre överensstämmer med definitionen för inert avfall i utvinningsavfallsförordningen. Om kriterierna formuleras som villkor tilldelade genom Mark- och miljödomstolen kan det dessutom föreligga större möjligheter till uppföljning och undersökning av metodikens lämplighet för att hindra spridning av surt och metallhaltigt lakvatten. Metodiken för identifiering av icke syrabildande material kan förbättras genom att borrkax analyseras under produktionens gång. Dessutom bör lakvattnet från deponierna med icke syrabildande material analyseras för att kunna följa upp åtgärdernas verkan. Denna studie visar även att det idag finns mer potentiellt syrabildande anrikningssand än gråberg på upplag, vilket indikerar att teknologin för att särhålla anrikningssand bör förbättras. / Mining waste exceed 80 % of the total amount of waste in Sweden. Waste from mining industry could pose a threat to our ecosystems if metals and acidic substances leave the material. Sulphide ore deposits pose the largest threat to the Swedish environment, since they contain minerals that decompose through weathering processes and produce acidic and metal containing rock drainage. Drainage treatment is crucial to avoid leakage to the surroundings. The Swedish Foundation for Strategic Environmental Research recommends selective material handling of acid rock drainage generating material as first option mainly because of the expenses that comes with drainage treatment. In this study it has been investigated in which means the selective material handling can be improved in Sweden. The work has been conducted through studies of environmental reports, waste management programs and communication with the Swedish County Administrative Boards and Swedish Environmental Protection Agency. The areas with possibility of improvement that were identified in this study concern the criterions for acid drainage potential in waste rock and acid drainage potential identification methodology. The criterions for non acid rock drainage generating waste rock should correspond with the definition of inert waste in the Swedish waste management regulation. If the criterions are defined as conditions through the environmental court, it might be easier to conduct thorough follow-up. The methodology for identification of non acid generating waste rock could be enhanced if borehole-samples were analysed during the operation of the mine. Furthermore should the rock drainage from the deposits with non acid generating waste rock be analysed to be able to follow up the measurements. This study reveals that the amount of tailings on deposits currently exceeds the amount of waste rock, which indicates that the technology for separating tailings needs to be evolved.
49

Sprängsalvor i olika bergarter / Explosives in different rock types

Jildesten, Jacob January 2019 (has links)
Examensarbetet genomfördes hos Bergsskolan i Filipstad, i samarbete med Skanska Industrial Solutions AB, region bergmaterial. Uppföljningen begränsades tidsmässigt och omfattade perioden april – juni 2019. Arbetets huvudsyfte var att skapa ett uppföljningssystem som Skanska sedan kunde utveckla till ett ordentligt arbetsredskap inom losshållningen. Systemets fokus riktades mot de viktigaste sprängtekniska parametrarna inom sprängteknik. För skapandet utav uppföljningssystemet användes sprängjournaler från Skanskas bergtäkter i Sverige, samt nödvändig data från SGU:s bergartskarta där bergtäkternas respektive bergarter hämtades från. Systemet skapades i dataprogrammet Excel. Systemet är baserat på bergarten kontra bergtäkten, där salvinformationen är kopplad till respektive bergtäkt. Systemet fungerar på följande vis: 1. Välj den bergart du söker  systemet visar då de bergtäkter som innehar den bergarten. 2. Klicka på den bergtäkt du söker  systemet kopplar dig till täktens salvinformation. 3. Välj salvnummer och fyll sedan i salvinformationen med önskad data. 4. Spara filen  klar! Resultatet visade att målet var uppnåeligt. Ett system där sprängningar följdes upp i de olika bergarterna skapades. Uppföljningssystemet som presenterades är endast en prototyp som för att funka ordentligt för företaget bör byggas vidare i en annan databas (inte Excel). / The master thesis was made at Bergsskolan in Filipstad in cooperation with Skanska Industrial Solutions AB. The follow-up was made during the time period of April – June 2019. The main purpose of the thesis was to create a follow-up system that Skanska could use and develop into a real working tool in the future. The focus of the system was aimed at the most important parameters of successful blasting. Skanskas blasting records from the different opencast mines were used to create the follow-up system. SGU: s rock map of Sweden was also used to locate the different rock types in the opencast mines. The system was created in the data program Excel. The system is based on rocks versus mines, were the blasting information is connected to the mines. The follow-up system works like this: 1. Choose the type of rock you are searching for  the system will then show you all the opencast mines that operate in that kind of rock. 2. Click on the mine that you are searching for  the system will take you to that mines blasting information. 3. Choose the burst number and apply all the relevant blasting information in the right boxes. 4. Save the file  done! The result showed that the goal of the thesis was reachable. A follow-up system was created were blasting information in different rocks was shown. The system is only a prototype of how a follow-up system in different rocks can look like. If the company wishes to use the system, then it should be recreated in another data program (not Excel) that specifies on database programming.
50

Assessment of static performance of LKAB´s welded mesh : Laboratory testing and analysis

Eriksson, Fredrik January 2020 (has links)
Surface support is an areal support, which is installed on rock excavation surface to prevent bulking of rock mass and retain loose rock fragments. Welded wire mesh is one type of surface support. Literature study indicates that there is a wide range of testing methods on mesh. Different setups regarding mesh configuration, installation, and load applying system are used to evaluate its load-bearing, deformation, and energy absorption capacities. Loads are applied in different ways to simulate both static and dynamic loading conditions. However, there is not any standardized testing method.   Common configuration of a welded mesh sheet in LKAB´s underground mines has the dimension of 2.3 m × 2.5 m and is made of 5.5 mm (in diameter) wires welded with a square grid pattern of 75 mm × 75 mm spacing. It is installed with a square bolt pattern with a bolt spacing of 1.0 m × 1.0 m particularly in seismically active areas. Comprehensive field damage investigations at LKAB’s Kiirunavaara mine have shown localized failure of mesh, i.e., the mesh was cut or torn by rock blocks as a result of a seismic event. This is especially common along the mesh overlap where mesh sheets are joined together. However, the performance of welded mesh used at the LKAB’s mines and its performance along mesh overlap is not well understood.   Laboratory tests of LKAB´s welded wire mesh were conducted at the Mining and Civil Engineering Lab at Luleå University of Technology. A test frame was built to test the mesh under static conditions after literature review. Mesh sheets with reduced dimension of 1.2 m x 1.2 m were mounted at the corner by four bolts on the frame and tested with different loading conditions in test series AA. In test series AB/AD, two mesh sheets with overlap were tested and the load was applied at the overlap between two bolts. For the base case in series AA, a rupture load of 41.4 kN was registered at a displacement of 0.44 m using the loading plate with the size of 0.07 m2 when the load was applied at the center of the whole mesh sheet. The highest rupture load, 60.7 kN at 0.26 m displacement, was reached when the size of the loading plate was increased from 0.07 m2 to 0.5 m2. Load-carrying capacity (by using rupture load) obtained for test series AA was in the range of 32.4 - 60.7 kN with a displacement range of 0.26 - 0.44 m, considering varied loading plate material and size of the loading plate. In test series AB/AD where focus was placed on the overlap, the load-carrying capacity was in the range of 28.9 – 47.5 kN at a displacement range of 0.19 – 0.22 m. A single mesh tested with this loading configuration gave the lowest rupture load, 28.9 kN at a displacement of 0.19 m. The load-carrying capacity of two mesh sheets with three grids overlap was increased to 47.5 kN at a displacement of 0.22 m. Stiffness of the tested mesh also increased with an overlap. There is nearly no difference in load-carrying capacity when the loading mode has changed from pulling to pushing. Reducing the number of grids at the overlap to one grid decreased the load-carrying capacity of the mesh significantly, and the overlap seemed to become open quickly as the load was applied on it.   Two failure modes were observed for the mesh tests: tensile failure of the wires and failure at the heat affected zone (HAZ). Failure at HAZ is caused by weakening of the wires at the welding points. In test series AA, failure at the HAZ was observed in all tests near a faceplate. In test series AB/AD, both tensile failure and failure at HAZ were observed. They were observed close to either a faceplate or the loading plate.   To conclude test series AA, there is a problem with the redistribution of load and failure always occurs at the welding points close to faceplates. Roof mesh with wider wires at the face plates and high energy absorbent mesh have shown good results regarding handling these described problems, therefore these could be tested with LKAB´s bolting pattern and mesh configurations. In test series AB/AD, the observed problem is that the load concentrates on the closest bolts, therefore the load should be redistributed to bolts next to the loaded area. Seismic mesh, straps and improved bolting pattern can help with that, and they could be tested to evaluate them further. / Yt-förstärkning är ett element som installeras mellan andra bergförstärkningar. Yt-förstärkning är konstruerade och installerade för att hålla tillbaka och minska bergutfall mellan dessa andra förstärknings installationer. En litteraturstudie har visat att det finns en mängd olika sätt att testa yt-förstärkningar. Olika testuppställningar förekommer, där olika specifikationer utav yt-förstärkningar är varierade. Inspännings metod, last på bultar samt olika sätt att inducera last har en stor spridning. Detta gäller för både statiska- och dynamiska lastförhållanden.   En vanlig typ utav yt-support är svetsat stålnät med en wire tjocklek på 8gagues. Dessa är ihop svetsade till ett rutnät med 4 in × 4 in mellan wirarna. Dessa är installerade i olika gruvor med antingen ett diamant- eller kvadratiskt bultmönster, förekommande avstånd mellan är 1,2 m till 1,5 m mellan bultarna. Nät som används utav LKAB har en wire-diameter på 5,5 mm och ett avstånd på 75 mm × 75 mm i deras svetsade stålrutnät. Näten hos LKAB är installerade med ett kvadratiskt rutmönster med bultaståndet 1,0 x 1,0 m och 3 rutors överlapp. Dessa är oftast installerade i områden där spänningarna är höga och seismisk aktivitet är sannolik. En skadekartläggning orsakad av seismisk aktivitet genomfördes i LKAB´s undergjordsgruva Kiirunavaara. Där framkom det att de installerade näten antingen slits sönder av stenblock eller att överlappen ger med sig.   En utvärdering utav LKAB´s nät har gjorts genom att testa dem i laborationsmiljö på Luleå Tekniska universitet. En test-ram byggdes, denna bultades fast i golvet för att vara styv. Mindre nätbitar om 1.2 x 1.2 m blev installerade i riggen och en last applicerade mellan fyra bultar in testserie AA. I test seria AB/AD påfördes lasten mellan två bultar, här undersöktes överlappats inverkan på nät-konfigurationen. I grund testet i serie AA uppnåddes en last om 41.4 kN och en deformering på 0.44 m innan första brottet noterades. Högst brottlast noterade när lastpåföringsplattans area ökade från 0.07 m2 till 0.5 m2, dvs 61.7 kN med endast en förskjutning på 0.26 m. Brottgränsområdet för testserie AA är mellan 32.4 kN – 61.7 kN där deformation är mellan 0.26 m -0.44 m, inom dessa områden varierades också lastpåföringsplattans material och lasten på bultarna som håller fast nätet. För testserie AB/AD är samma område 28.9 kN – 47.5 kN med deformationerna 0.19 m – 0.22 m. Grund testet med ett nät där lasten appliceras mellan två bultar har lägst brottområde, 28.9 kN vid 0.19 m. När lasten istället appliceras på ett överlapp ökar brottslasten till 47.5 kN vid en deformation om 0.22 m, styvheten i konstruktionen ökar också. Det är inte noterad någon större förändring om överlappen belastas med en dragande eller tryckande teknik. När mängden rutor reduceras till endast en ruta, observerades tendensen till separation av näten vid påföring utav last.   Genom hela testuppställningen har två brottorsaker noterats, drag brott i vajer och brott i närhet utav uppvärmda områden, svetsar. I testserie AA har endast den senare brottorsaken noterats, dessa förekommer uteslutande i närhet till bultbrickorna. För testserie AB/AD är båda brottorsakerna är noterade. De förekom både vid bultbrickorna och vid lastpåföringsplattan.   Testserie AA har problem med att fördela lasten efter ett första brott har uppsåt samt att svetsarna i nätet är den svagaste länken. High energy mesh och Roof mesh har påvisat goda egenskaper att lösa dessa två problem enligt tidigare genomförda tester. Någon utav dessa kan modifieras och testas med LKAB´s installationsmönster. För testserie AB/AD är de möjligt att härleda brott i överlappet till för hög lastkoncentration i de närmsta bultarna. En lastfördelning till närliggande bultar ses som en lösning, både seismiska nät och straps har dessa egenskaper. Dessa kan med fördel också testas installationsmönster för att utvärdera och förstå den komplexa installationen som uppstår.

Page generated in 0.0597 seconds