• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 28
  • 1
  • 1
  • 1
  • Tagged with
  • 31
  • 31
  • 24
  • 24
  • 23
  • 23
  • 21
  • 20
  • 19
  • 18
  • 18
  • 18
  • 17
  • 17
  • 17
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Průmyslový areál AQUASYS - stavebně technologický projekt / Industrial comlex AQUASYS - construction and technological project

Juračka, Lukáš January 2012 (has links)
This Master’s thesis deals with the technological project of building an industrial complex AQUASYS in Žďár nad Sázavou. This work includes technical reports ZS and STP, site equipment, wider transport relations, budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work and job security for this building.
22

Technologický projekt sportovní haly v obci Nové Veselí / Technological project of a sports hall in Nové Veselí village

Vaněk, Jiří January 2012 (has links)
This Master's thesis deals with the technological project of sports hall in New Veseli . This work includes the construction and technological equipment for the study site , ZOV , technological regulations, building equipment, wider transport relations, budget calculation , time planning , inspection and test plan , design mechanisms , job security this building , balance resources.
23

Výrobní hala v Černé Hoře - vybrané části stavebně technologického projektu / Production Hall in Černá Hora – Selected Parts of Construction-technological Project

Různar, Daniel Unknown Date (has links)
The topic of my master's thesis are selected parts of the construction technology project Production Hall in Černá Hora with administrative part. Thesis contains engineering report, construction budget, time schedule for the whole construction, deployment of mechanisms and staff, project of construction site, study of the implementation of the main technological stages, the most appropriate construction mechanisms, routes of mechanisms, ranges and travels of mechanisms, financial and time schedule of the main building, technological specification for established pilots and montages of prefabricated skeleton, control and test plan, implementation of pilots, proposals of design of movement mechanisms, comparison of cladding of ventilated facades, skeleton assembly procedure diagrams and noise study of the construction site.
24

Stavebně technologický projekt výrobní haly s přístavbou v Poličce / Construction-technological project of production hall with extension in Polička

Holubář, Zdeněk Unknown Date (has links)
This diploma thesis is dealing with a construction-technological project of a production hall in Polička. The main subject of the thesis is a technological report, a realization study of the main technological phases, a coordination situation of the construction with broader relations to transport routes, a project of the office building site equipment, a suggested list of the main construction vehicles, a time plan for the main building object, technological prescriptions for a prefabricated skeleton and bored piles and documents related to this.
25

Stavebně technologický projekt realizace novostavby výrobní haly pro automobilový průmysl / Construction Project for Implementation of Industrial Hall for Automotive Industry

Světlík, Jiří Unknown Date (has links)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
26

Skladovací hala PFM Flexi - stavebně technologický projekt / PFM Flexi storage hall - construction technology project

Chroustovský, David January 2018 (has links)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
27

Stavebně technologický projekt haly ADS s.r.o. Větřkovice / Building Construction Project - Implementation of Production Hall ADS s.r.o. Větřkovice

Ráb, Jakub January 2019 (has links)
The subject of my master's thesis is construction technological project of the hall ADS s.r.o. Větřkovice. The work includes technical report of construction technological project, facilities of construction zone, solving traffic routes from the production to the place of construction, study of the implementation of the main technological stages of the building SO02, the most appropriate machine assembly, technological specification for drilled piles and for montage of prefabricated reinforced concrete skeleton, control and test plan, schedule of work, itemized budget, plan of the safety and health protection during work, proposals of design of movement mechanisms and time and financial discretion of realization of the reinforced areas of the production hall area.
28

Příprava a organizace výstavby výrobního areálu / Preparation and organization of the production area's construction facility

Řeháček, Martin January 2013 (has links)
This master’s thesis relate to the preparation and organization of the production area’s construction of the SPEDUR company in Žďár nad Sázavou. The thesis contents technical report on the construction technological project, construction site, time plans, project of the equipment site, draft of the mechanisms, control and testing plan, environmental plan, risks of safety and health at work and calculation for this construction.
29

Stavebně technologický projekt dvoulodní haly ve Fulneku / Constructive Technological Project of Two-Aisle Hall in Fulnek

Selník, Petr January 2013 (has links)
The subject of this diploma thesis are chosen parts of building technological project of pursuance of the factory building Massag in Fulnek based on the metal bearing structure. This diploma thesis contents study of realization of main technological process of the hall, financial and time plan of building, project of construction site installation, budget of the construction, time planning of works, inspection and test plan, the project of safety and protection of health at work, technological regulation of building metal bearing structure.
30

Stavebně technologický projekt rozhledny Vartovna u obce Seninka / Construction technological project of the lookout tower Vartovna near the Seninka village

Starnovský, Jakub Unknown Date (has links)
The diploma thesis deals with the complex construction of the Vartovna lookout tower near the village of Seninka. Within this work was prepared item budget, drawings of construction site equipment for the main construction stages, concreting scheme and landfill supply, time schedule of the whole construction, construction financing plan, number of workers, necessary machines and mechanisms with their deployment over time, technological regulation for monolithic foundations. hydraulic concrete structures, technological regulation for the assembly of the steel structure of the lookout tower, control and test plans for monolithic and prefabricated structures, the formwork scheme of all foundation structures, and safety and health protection at work.

Page generated in 0.0509 seconds