• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 21
  • 6
  • 1
  • Tagged with
  • 38
  • 38
  • 20
  • 20
  • 15
  • 11
  • 9
  • 9
  • 8
  • 5
  • 4
  • 4
  • 4
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Two-dimensional stock cutting processes : an algorithm to optimize two-dimensional stock cutting at New River Valley Workshop, Inc. /

Hogge, Jerome W., January 1991 (has links)
Report (M.S.)--Virginia Polytechnic Institute and State University. M.S. 1991. / Vita. Abstract. Includes bibliographical references (leaves 62-63). Also available via the Internet.
2

Geologic controls on mass movement in the New River Gorge, West Virginia

Remo, Jonathan W. F. January 1999 (has links)
Thesis (M.S.)--West Virginia University, 1999. / Title from document title page. Document formatted into pages; contains x, 106 p. : ill. (some col.), maps (some col.). Includes abstract. Includes bibliographical references (p. 92-93).
3

Factors controlling landslide initiation as a result of July 2001 high precipitation events in a section of the lower New River Gorge, West Virginia

Kish, M. Patrick. January 2004 (has links)
Thesis (M.S.)--West Virginia University, 2004. / Title from document title page. Document formatted into pages; contains vi, 45 p. : ill. (some col.), maps (some col.). Includes abstract. Includes bibliographical references (p. 41-43).
4

The Appalachian cultural landscape along the New River /

Mellen, E. Garnett. January 1994 (has links)
Thesis (M.L.A.)--Virginia Polytechnic Institute and State University, 1994. / Vita. Abstract. Includes bibliographical references (leaves 99-101). Also available via the Internet.
5

The Appalachian Power Company Along the New River: The Defeat of the Blue Ridge Project in Historical Perspective

Woodard, Robert Seth 13 July 2006 (has links)
The Appalachian Power Company is an operating company of the American Electric Power Company, the largest electricity producing private electric system in the United States since 1953. The Appalachian Power Company held almost exclusive development rights along the New River since its 1911 charter. From then until the 1940s, it built a few small dams, a very large hydroelectric dam with the highest generating capacity of its time, and the largest steam plant in Virginia on the New River. Besides a few navigation issues, conflicting developments, and brief clashes with the federal government, seen in Chapter Two of this thesis, the Appalachian Power Company's developments along the New River went largely unchallenged until the late-1960s. The Blue Ridge Project was the utility's next large hydroelectric project on the New River. It was slated to impound the waters of the upper New River in Grayson County, Virginia, with two reservoirs extending into the river's headwaters in the counties of Ashe and Alleghany in northwestern North Carolina. Though the initial project met no serious opposition, environmental lawyers and the State of North Carolina defeated a considerably enlarged version of the proposal after a legal battle lasting over a decade. Why was this double impoundment not successfully constructed? What had changed in the last decades to influence Appalachian Power's previously unchallenged right to generate electricity along the New River? The purpose of this thesis is to answer these questions. / Master of Arts
6

Radical career changes of middle-aged professional, technical, and managerial workers in the New River Valley area of Virginia

Isom, Margaret Smith January 1989 (has links)
The specific problem of this study was to determine common characteristics of midlife professional, technical, and managerial workers who have made voluntary radical career changes, to identify positive and negative experiences faced by these individuals, and to identify coping strategies used by the career changer and families of the career changers. Data were gathered by the participant observation method of qualitative research. Twenty purposively selected career changers were interviewed using semi- structured interview questions. Questions were categorized as follows: personal background, schooling, career history, the career change, and after the career change. The interview sessions were tape recorded. Responses to the interview questions were assembled, codified, and examined for similarities. A profile of a middle-aged professional who has made a radical career change was developed. Excerpts from the profile follow. This individual: (a) is about 43 years old, (b) has worked in the same career for about 13 years prior to the change, (c) experienced no major traumatic event before the change, (d) received no assistance from a "help" agency during the time of change, (e) had few barriers to overcome in making the transition, (f) adjusted to the change with a minimum of effort, and (g) remained financially stable after the change. A major finding of the study was that 17 of the 20 subjects said they were better off psychologically after making the career change. / Ed. D.
7

Sedimentation in the New River Estuary, Southland

Thoms, Martin Charles January 1981 (has links)
The New River Estuary is a large mesotidal estuary connected to Foveaux Strait by way of an inlet, and has two principle rivers (the Oreti and the Waihopai) flowing into it. The purposes of this study have been to describe the sediment distribution within the estuary; investigate the sediment source-sink relationships.; to calculate whether on a net basis sediment is being deposited in or eroded from the New River Estuary, and to investigate some of the influences on the sediment dynamics of this estuary. Textural analysis of the sediment indicated that there are three sedimentary environments within the estuary, and each is distinguishable due to the relative mix of fine sand. It was shown that Foveaux Strait is a dominant source of medium-fine sand. The Oreti River and the channels of the main estuary body are also important sources of these sediments. Medium-fine sand is transferred into the estuary and very fine sand is transferred out of the estuary and onto the continental shelf. Aerial photographs indicated that estuarine morphology was stable over a 31 year period (from 1947 to 1978). However a network of scour rods indicated that the intertidal sediment surface was spatially and temporally dynamic. It was calculated that on a net basis sediment was deposited in the estuary over a five month period. An important influence on the sedimentation of the New River Estuary has been the reduction of the tidal com partment by 25%, due to the reclamation of 12.2 km2.
8

A comparison of energy self-reliance and industrial development using an input-output model /

Flora, Paul Richard, January 1984 (has links)
Thesis (M.U.R. Pl.)--Virginia Polytechnic Institute and State University, 1984. / Vita. Abstract. Includes bibliographical references (leaves 127-130). Also available via the Internet.
9

Sedimentation in the New River Estuary, Southland

Thoms, Martin Charles January 1981 (has links)
The New River Estuary is a large mesotidal estuary connected to Foveaux Strait by way of an inlet, and has two principle rivers (the Oreti and the Waihopai) flowing into it. The purposes of this study have been to describe the sediment distribution within the estuary; investigate the sediment source-sink relationships.; to calculate whether on a net basis sediment is being deposited in or eroded from the New River Estuary, and to investigate some of the influences on the sediment dynamics of this estuary. Textural analysis of the sediment indicated that there are three sedimentary environments within the estuary, and each is distinguishable due to the relative mix of fine sand. It was shown that Foveaux Strait is a dominant source of medium-fine sand. The Oreti River and the channels of the main estuary body are also important sources of these sediments. Medium-fine sand is transferred into the estuary and very fine sand is transferred out of the estuary and onto the continental shelf. Aerial photographs indicated that estuarine morphology was stable over a 31 year period (from 1947 to 1978). However a network of scour rods indicated that the intertidal sediment surface was spatially and temporally dynamic. It was calculated that on a net basis sediment was deposited in the estuary over a five month period. An important influence on the sedimentation of the New River Estuary has been the reduction of the tidal com partment by 25%, due to the reclamation of 12.2 km2.
10

The origins of rapids in the lower New River Gorge, West Virginia

Moore, Dawn Anne. January 1999 (has links)
Thesis (M.S.)--West Virginia University, 1999. / Title from document title page. Document formatted into pages; contains ix, 61 p. : ill. (some col.), maps (some col.) Includes abstract. Includes bibliographical references (p. 55-59).

Page generated in 0.0628 seconds