Spelling suggestions: "subject:"noise study"" "subject:"boise study""
11 |
Mateřská škola Kamechy - vybrané části stavebně technologického projektu / Kindergarten Kamechy - selected parts of the construction technology planStrádalová, Aneta January 2022 (has links)
The subject of this dimploma thesis is conctruction-technology project of preparation and realization of kindergarten Kamechy in the city district Brno – Bystrc. The thesis contains technical report, coordination situation with transport routes, time and financial schedules, study of main technological phases, project of construction site and technical report of construction site, time schedule of main building, list of main construction machines and mechanism, material resourses plan. Necessary part of this thesis is technological regulation and control and test plan of implementation monolithic ceilings above the 2nd floor. At the end design and assessment of cranes, noise study, evaluation of the object according to LEED certification and safety and health protection plan for selected technological processes were prepared.
|
12 |
Stavebně technologický projekt bytového domu v Ohrazenicích / CONSTRUCTION TECHNOLOGICAL PROJECT OF APARTMENT BUILDING IN OHRAZENICEZdražil, Luboš Unknown Date (has links)
The master´s thesis describes the realization of new apartment building in Ohrazenice. The thesis contains a technical report of the construction-technical project, studies of relatization of the main technological stages and report of the building equipment. I designed the main construction machines and mechanisms. An optimized budget with a bill of quantitiesand detailed construction schedule and a graph of staff needs is prepared for the SO01 building. The thesis also deals with technology of drilled piles and prepared a technological regulativ, schedule of occupational health and safety and a control and test plan.
|
13 |
Mateřská škola Kuřim - stavebně technologický projekt / Kindergarten Kuřim - construction technology projectKurka, Jan Unknown Date (has links)
The subject of the thesis is the solution of selected parts of the construction technology project of the construction of a kindergarten in Kuřim on Hybešova Street. It is a single-story brick building with a flat roof with a green roof. In my work I solve the study of the main technological stages, technological regulations for the monolithic ceiling structure and the green roof of the Smart Roof Solutions system together with inspection and test plans, design of the main construction machines, time and a financial plan for the main building of the kindergarten, the building time and financial plan for the entire construction plan, the balance of workers and the deployment of construction machinery and the construction site equipment project. Then I add a noise study, assessment of selected LEED 2009 Core & Shell credits, design of the TOPSAFE restraint system, health and safety plan, documentation of the green roof of the Smart Roof Solutions system and a search on the topic of green roofs.
|
14 |
Příprava realizace Rezidence Bučovických teras / Preparation for the implementation of the Bučovice Terrace ResidenceLoukota, Michal Unknown Date (has links)
The subject of the diploma thesis is the implementation of apartment buildings in Bučovice, specifically focusing on the apartment building "X". It deals with a construction technology project. Its content is a technical report on the construction technology project, traffic relations for the transport of materials and machines to the construction site, technical report on the construction site equipment, construction technology study, machine design, elaboration of technological regulation for monolithic ceiling construction and infiltration tank. The chapters on safety and health protection at work on the construction site, the LEED certification system and a noise study for earthworks are also elaborated. Several diagrams of the procedure of execution of individual constructions, time and financial plan, selected details are elaborated. The thesis contains 30 appendices.
|
15 |
Montovaná hala, areál firmy Bosh Diesel s r.o. - stavebně technologická příprava stavby. / Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.Koláček, Ivo January 2019 (has links)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
|
16 |
Obytný areál Ponavia park v Brně, příprava a organizace stavby / Preparation and Organization of ConstructionHladký, Dominik January 2020 (has links)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
|
17 |
Stavebně technologický projekt výstavby komplexu RD SLAVKOV - Pod Zlatou horou / Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horouKurková, Dita January 2020 (has links)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.
|
18 |
Stavebně technologický projekt administrativní budovy firmy Ray Service, a.s. ve Starém Městě / Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré MěstoSeménka, Petr January 2020 (has links)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.
|
19 |
Stavebně technologický projekt výstavby administrativní budovy s garážemi / Construction technological project of construction of an administrative building with garagesHrabovský, Lukáš January 2022 (has links)
The subject of this diploma thesis is the elaboration of a construction technological project for the construction of an administrative building with garages in Prague. The building is located in an enclosed area in the Prague-Veleslavín district. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, a technological regulation for the implementation of monolithic ceiling structures, a quality control and testing plan for monolithic ceiling structures. The diploma thesis also includes the calculation of construction according to THU, a occupational health and safety plan, concreting economics, a noise study, a selected points LEED certification and a budget with site equipment costs.
|
20 |
SNIŽOVÁNÍ HODNOTY STAVENIŠTNÍHO HLUKU POMOCÍ MODELOVÁNÍ VÝROBNÍHO PROSTORU STAVBY A ÚPRAV TECHNOLOGICKÝCH POSTUPŮ PŘI VÝSTAVBĚ / REDUCING THE VALUE OF CONSTRUCTION NOISE BY MODELING THE PRODUCTION AREA OF CONSTRUCTION SITE AND BY ADJUSTING THE TECHNOLOGICAL PROCEDURES DURING CONSTRUCTIONKantová, Radka Unknown Date (has links)
This doctoral thesis focuses on noise generated during construction. It defines the legislative and physical aspects of this topic. It determines heavy machinery as noise source and categorizes them by their usage in construction technologies. It collects source data of the machinery noises which can be further used in prognostic models. It analyses the level of construction noise which can impact the nearby residential areas and offers methodology for modelling and designing the possible arrangements for the noise reduction. It defines partial effects of the construction site which are significant for the noise spreading. It establishes their role in the value of acoustic pressure level of the noise affecting the façade of the considered building. With the data collection and with case study verification it offers a prepared work tool which can be easily used to predict noise levels on construction sites and can be applied in the early constructions preparations. The structure of this thesis is planned for possible usage as university textbook or study support.
|
Page generated in 0.0632 seconds