• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Utilization of heat from a nuclear high temperature cooled modulator reactor in a crude oil refinery : techno-economic feasibility analysis / Alistair Ian Herbert

Herbert, Alistair Ian January 2014 (has links)
This research project will investigate the potential business case and technical feasibility of using nuclear generated heat in a crude oil refinery located some distance away. The key design element is an energy transportation mechanism that doesn’t compromise the safety, licensing or operability of the nuclear plant. In a crude oil refinery processing heat is generated by combusting fuels that are generally sellable products. The inherent safety features and high output temperature of a HTGR make it an appropriate replacement heat source for such a processing plant. An opportunity thus exists to replace the refinery hydrocarbon fuel usage with nuclear energy thereby improving refinery profitability. Three alternate proposed were generated. Alt 1: Generation of steam at HTGR, piped to the refinery to replace current supply. Alt 2: Closed loop reversible methanation reaction delivering potential chemical energy to the refinery which is released to the process in heat exchangers. Alt 3: Hydrogen production from water splitting at the HTGR, piped to the refinery and combusted in boilers or used for hydrotreating diesel. Utilizing data from refinery plant historian and journals, a basic engineering study assessed technical feasibility thereof. An economic model for the 2 most promising alternates was set up using quotations and factored data and evaluated against the existing refinery situation. A consistently increasing crude price was assumed. Alternates 1, 2 and 3 proved technically feasible and delivered 86 MW, 59 MW and 48MW to the refinery respectively. Generating steam at the HTGR (Alt 1) demonstrated an attractive business case, strengthened by co-locating the nuclear plant at the refinery. It is therefore concluded that using a HTGR for process heat in a petrochemical plant such as a refinery is techno-economically practical and demands further consideration. If future carbon emission legislation is promulgated this proposal will be key component of the solution. / MIng (Nuclear Engineering), North-West University, Potchefstroom Campus, 2014
2

Utilization of heat from a nuclear high temperature cooled modulator reactor in a crude oil refinery : techno-economic feasibility analysis / Alistair Ian Herbert

Herbert, Alistair Ian January 2014 (has links)
This research project will investigate the potential business case and technical feasibility of using nuclear generated heat in a crude oil refinery located some distance away. The key design element is an energy transportation mechanism that doesn’t compromise the safety, licensing or operability of the nuclear plant. In a crude oil refinery processing heat is generated by combusting fuels that are generally sellable products. The inherent safety features and high output temperature of a HTGR make it an appropriate replacement heat source for such a processing plant. An opportunity thus exists to replace the refinery hydrocarbon fuel usage with nuclear energy thereby improving refinery profitability. Three alternate proposed were generated. Alt 1: Generation of steam at HTGR, piped to the refinery to replace current supply. Alt 2: Closed loop reversible methanation reaction delivering potential chemical energy to the refinery which is released to the process in heat exchangers. Alt 3: Hydrogen production from water splitting at the HTGR, piped to the refinery and combusted in boilers or used for hydrotreating diesel. Utilizing data from refinery plant historian and journals, a basic engineering study assessed technical feasibility thereof. An economic model for the 2 most promising alternates was set up using quotations and factored data and evaluated against the existing refinery situation. A consistently increasing crude price was assumed. Alternates 1, 2 and 3 proved technically feasible and delivered 86 MW, 59 MW and 48MW to the refinery respectively. Generating steam at the HTGR (Alt 1) demonstrated an attractive business case, strengthened by co-locating the nuclear plant at the refinery. It is therefore concluded that using a HTGR for process heat in a petrochemical plant such as a refinery is techno-economically practical and demands further consideration. If future carbon emission legislation is promulgated this proposal will be key component of the solution. / MIng (Nuclear Engineering), North-West University, Potchefstroom Campus, 2014

Page generated in 0.0582 seconds