• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1879
  • 978
  • 10
  • 10
  • 7
  • 6
  • 3
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 2895
  • 2759
  • 611
  • 592
  • 557
  • 498
  • 498
  • 459
  • 415
  • 381
  • 379
  • 378
  • 339
  • 314
  • 301
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
421

Vurdering av kryssløsning på Klett / Assessment of intersection alternatives at Klett

Rekaa, Knut Sveinung Løvlund January 2012 (has links)
Sør for Trondheim skal E6 utvides til fire felt mellom Heimdal og Melhus. I den forbindelse blir det behov for et nytt kryss på Klett, der E39 og Rv 707 kobles sammen med E6. E6 vil få motorvegstandard, og skal beholde fire kontinuerlige felt gjennom kryssområdet. Dette medfører at det nye krysset må utformes over minst to plan.Et toplanskryss på Klett har vært planlagt i lengre tid, og flere alternative utforminger har vært på skrivebordet. Imidlertid har dårlige grunnforhold og stramme økonomiske rammer medført et behov for å tenke nytt. Denne rapporten er utarbeidet i samarbeid med Statens Vegvesen Region Midt, og har til hensikt å belyse ulike kryssalternativer, samt forsøke å komme frem til en fornuftig løsning på Klett.Det er utarbeidet totalt ni alternative utforminger av krysset, hver med tilhørende beskrivelse og skisse. For å skille kryssalternativene fra hverandre på en oversiktlig måte, er en vektingsmetode av de mest sentrale faktorene benyttet. Dette danner grunnlag for hvilken kryssløsning som tas med videre til detaljeringsfasen.En kryssløsning bestående av to ramper i bro over E6, samt å beholde dagens rundkjøring, ble ansett som mest fornuftig. Dette skyldes først og fremst at krysset har god tilpasning til kurvebildet i området, er ansett å være gunstig økonomisk og tar opp et minimum av landbruksarealer.Til å detaljere det utvalgte krysset er NovaPoint benyttet. I programmet er krysskonstruksjonen inndelt i totalt tolv vegmodeller, og noe av utfordringen består i tilpasningen mellom disse. Spesielt viktig er det å opprettholde kontinuerlige vegflater og grøfter, samt å sikre god vannavrenning i alle punkt. En av de største geometriske utfordringene er stigningen i rampene fra rundkjøringen opp til broene over E6. Dette ble løst med å senke E6 lavt i terrenget, og heve rundkjøringen 1,5 m fra dagens posisjon.Som utgangspunkt for prosjekteringen av rundkjøringen er rundkjøringsmodulen i NovaPoint benyttet. Det er imidlertid nødvendig å gjøre noen mindre justeringer for å tilpasse geometrien til forholdene på Klett. Videre er det gjennomført sporingsanalyse for å kontrollere at dimensjonerende kjøretøy kan gjennomføre samtlige svingebevegelser i rundkjøringen. NovaPoint er også benyttet for å kontrollere sikt på utsatte områder i krysskonstruksjonen.Virtual Map benyttes for å visualisere krysset i 3D. Utsnitt fra modellen brukes til å fremstille detaljer fra prosjekteringen, samt å beskrive en mulig utbyggingsstrategi og omkjøringsplaner. Det er også gjennomført en manuell og en verktøybasert kostnadsanalyse av krysset. Resultatene fra disse viser at kryssets totale kostnader kan forventes å ligge innenfor intervallet 192,5 til 461 millioner kroner, med en sannsynlig kostnad i området rundt 350 millioner kroner. Til slutt er det gjort vurderinger av prissatte og ikke-prissatte konsekvenser en kryssutbygging kan medføre.
422

Implementering av BIM i bærekraftig oppgradering av bygninger : Mulighetsstudie for utføring av tilstandsanalyser med nettbrett / Implementation of BIM in Building refurbishment : Feasibility study on performing building state analysis with a Tablet computer

Vik, Vidar Samson January 2012 (has links)
Vi opplever i dag en økt hyppighet av klimakatastrofer som flom og tørke som følge av økt konsentrasjon av klimagasser i atmosfæren. Dette har ført til et behov for å redusere klimagassutslippene fra industrien på jorden. Byggebransjen, ofte kalt 40 % -bransjen, står for om lag 40 % av klimagassutslippene, og har dermed et stort potensial for reduksjon. BIM er en prosess som søker å redusere ressursbruken, og er dermed en bærekraftig prosess som har blitt tatt i bruk i stor skala i nybygg. Rehabiliteringsprosjekter henger derimot etter med implementering av BIM. Gode og korrekte tilstandsanalyser er en forutsetning for gode og ressurseffektive rehabiliteringsprosjekter. Ved å benytte nettbrett med BIM-modeller, ønsker man å effektivisere denne prosessen samt øke kvaliteten på tilstandsrapportene.Gjennom arbeidet med denne masteroppgaven ble det utført en tilstandsanalyse av Alfasetveien 11. Hele tilstandsregistreringen ble utført på et nettbrett (Samsung Galaxy tab 10.1). BIM-modellen som tilstandsregistreringene ble lagt inn i, ble utarbeidet ved hjelp av Revit Architecture, AutoCAD Architeture og AutoCAD WS. For at Revit Architecture kunne bli brukt til tilstandsanalyser, måtte det utarbeides en rekke løsninger for programvaren. Med støtte fra CAD-Q lot dette seg utføre. Det ble testet ut en rekke ulike applikasjoner for BIM-håndtering på nettbrett. Applikasjonene var tilgjengelige på Google Play. Det ble prøvd ut fortrinnsvis gratis applikasjoner. Det viste seg at det kun var applikasjonen TeamViewer som kunne benyttes til tilstandsregistrering på nettbrett med BIM-modell. TeamViewer er en fjernstyringsapplikasjon som lar en kontrollere en sentral PC fra et nettbrett.En IDM ble utarbeidet for prosessen ved å benytte et nettbrett med en BIM-modell til tilstandsanalyser. IDMen inneholder byggfaglig informasjon med forslag til functional parts. Det må IT-fagkyndige til for å utarbeide en MVD som muliggjør informasjonsflyt på tvers av programvarer via IFC-filformatet.Tilstandsanalysen som ble gjort av Alfasetveien 11 er ingen fullverdig tilstandsanalyse siden denne oppgaven omhandler prosessen ved å benytte et nettbrett med BIM-modell til tilstandsanalyser. Derimot ble denne prosessen utført i sin helhet på nettbrettet med BIM-modellen. Dette var ikke en optimal løsning med dagens applikasjoner og nettbrett. Det viste seg at applikasjonen som kunne brukes til formålet ikke var egnet for navigering med fingrene på et nettbrett. Dette førte til at navigering i modellen gikk svært sakte. Som igjen førte til at effektiviteten ikke økte i forhold til den tradisjonelle måten som ønskelig. Bildebehandlingen var heller ikke optimal slik at en av kildene til feil i grunnlaget for utarbeidelse av tilstandsrapporten, ikke kunne elimineres. I tillegg er nettbrettene som lages i dag ikke særlig robuste. Siden mye av tilstandsregistreringene skjer på utsiden av bygget ved registrering av fasader, er det en fordel om nettbrettet hadde tålt vann. Dette er imidlertid ingen stor hindring. Smarttelefoner har vært i omløp lengre enn nettbrett. Her ser man at flere produsenter lager robuste modeller. Panasonic har planer om å lansere sitt robuste nettbrett Toughpad i løpet av sommeren 2012.Til tross for noen problemer, viser denne masteroppgaven at med en liten innsats fra programvareutviklere, kan nettbrett og BIM-modeller drastisk forbedre og effektivisere den tradisjonelle måten å utføre tilstandsanalyser på.
423

Mulighetsstudie for passivhuskonseptet benyttet på forskjellige typehus i forskjellige klima i Norge / Study of the Passive House Concept applied on various House Systems in various Norwegian Climates

Nilsen, Espen Hobber January 2012 (has links)
Sammendrag
424

CFD Analysis of Wave Induced Loads on Tidal Turbine Blades

Holst, Martin Aasved January 2012 (has links)
Abstract— The object of this paper is to investigate the influence of wave-current interaction on a tidal turbine. An experiment at Norwegian Marine Technology Research Institute (MARINTEK) has been carried out, and a CFD analysis has been performed in order to enhance the understanding of the wave induced loads on the tidal turbine. These loads are known to be the governing forces and it is therefore of great importance to predict them accurately. The CFD results are found to be trustworthy with calculated values close to experimental data. In addition to the wave-induced forces, the wake characteristics and wave influence on the wake are investigated. Results from Blade Element Moment Theory (BEM) are also compared to validate the accuracy of this method. CFD is a powerful tool if used properly, but it is computationally expensive, especially when dealing with complex geometry like a tidal turbine. A high performance computer (HPC) has been used to carry out the transient CFD wave-current simulations in order to obtain reliable results within reasonable time.
425

Hydrologisk dimensjonering av regnbed i kaldt klima : Risvollan, Trondheim / Hydrologic design of Bioretention Cells in Cold Climates : A Case Study at Risvollan, Trondheim

Dalen, Torstein January 2012 (has links)
Økt andel tette overflater i byer gir større mengder overvann som må håndteres. Regnbed er en vegetert forsenkning i terrenget hvor overvann samles og infiltreres. Et typisk regnbed er bygd opp av et filtermedium av jord og løvkompost og beplantet på overflaten. Et godt fungerende regnbed vil infiltreres tomt for vann mellom hvert nedbørstilfelle. Fordelen med regnbed er at filtermediet vil holde igjen en rekke forurensninger, overvann vil infiltrere til grunnvann og vann vil bli fordrøyd i regnbedet. Regnbed har blitt populært både i USA og Canada, mens bruken er beskjeden i Norge. Noe av årsaken er manglende dimensjoneringskriterier/metoder og usikkerhet rundt ytelsen til regnbed i kaldt klima. Hovedmålet med denne oppgaven er derfor å dokumentere den hydrologiske ytelsen til regnbed og hvilke faktorer som bør spille inn på dimensjoneringen av regnbed. Arbeidet baserer seg på feltforsøk med Modified Phillip-Dunne infiltrometere, laboratorieundersøkelser av Risvollan regnbed (Trondheim), simulering av kontinuerlig målte vannføringer i Risvollan regnbed og laboratorieundersøkelser av ulike filtermedier.RECARGA kan modellere vanngjennomstrømningen i et regnbed. Modellen har blitt kalibrert med infiltrasjonsevnen mot vannføringsdata høsten 2011 og våren 2012 i Risvollan regnbed. RECARGA har vist godt samsvar med målte data. Sammen med infiltrasjonsforsøk i felt har dette dokumentert stor variasjon i vannmettet hydraulisk konduktivitet i perioden juli 2011 til mai 2012 (0.4-2.8 cm/time). Infiltrasjonen var som forventet størst i sommerhalvåret.Feltforsøkene avdekket stor variasjon i infiltrasjonsevne på overflaten (0-35 cm/t). Årsaken kan skyldes ulik grad av kompaktering, biologisk aktivitet fra planter og insekter, samt finstoff i innløpsvannet som sedimenterer på overflata. Infiltrasjonsforsøk i felt samsvarte godt med infiltrasjonsevnen funnet med RECARGA. Enkle feltforsøk kan dermed brukes til å beregne ytelsen til allerede anlagte regnbed og i tillegg avdekke områder i regnbedet som bør rehabiliteres. Regnbeds ytelse har blitt simulert ved hjelp av RECARGA med avrenningsdata fra Bergen, Trondheim og Ås. Resultatet viser at 95 % av årsavrenningen kan infiltreres alle tre stedene med et regnbed på 2.5 % av nedbørsfeltet og infiltrasjonsevne på 10 cm/time. For regnbed som er mindre enn 2.5 % av nedbørsfeltet eller har lavere infiltrasjonsevne enn 10 cm/t vil ytelsen være forskjellig i Bergen, Trondheim og Ås. Regnbed som skal redusere flomtoppen må være større enn et regnbed som kun skal infiltrere mest mulig av årsnedbøren. Simulering av et tre timers 15års regn i Trondheim (25.8 mm) viser at regnbed som er 7 % av nedbørsfeltet vil gi en flomtoppreduksjon på 90 %. Dermed kreves det to forskjellige dimensjoneringsmetoder avhengig av formålet. Metoden som er foreslått for å håndtere årsnedbøren baserer seg på simulerte avrenningsdata fra smeltebrett. Metoden som er foreslått for å håndtere moderate nedbørstilfeller baserer seg på IVF-kurver og amerikanske dimensjoneringsmetoder. Arbeidet viser at hydraulisk konduktivitet er en av nøkkelfaktorene for å lykkes med regnbed. Denne avhenger av sammensetningen av filtermediet. Infiltrasjonsforsøk i laboratoriet viser at den hydrauliske konduktiviteten synker med mengde løvkompost, noe som tilsier at lavt innhold av organisk materiale er nødvendig for regnbed i kaldt klima. Lavere andel organisk materiale kan senke renseeffekten og påvirke vekstforholdene for plantene. Kompostandelen må derfor bestemmes ut fra nødvendig mengde organisk materiale for renseeffekt, plantevekst og infiltrasjonsevne i regnbed.
426

Development of environmentally friendly chair concept

Kratter, Lise Abrahamsen January 2012 (has links)
The governing purpose of the thesis is to develop a chair concept based on a tilting mechanism called VAPAC. This chair concept has many potential ergonomic and environmental benefits that should be included and developed in the design. The report starts with an analysis of different segments within the chair market. Based on an evaluation, office chairs was chosen as the segment for the VAPA-Chair. Due to an interesting tilting idea suggested by the Supervisor/Concept originator, a test rig was built in order to try out a chair concept using straps for the tilting mechanism. This assignment was not originally one of the main tasks in the problem definition of this thesis . Due to curiosity and expectations for the idea, it was chosen to include this assignment in the thesis. A user survey reviled that this tilting idea offered an exciting and comfortable sitting experience. The concept using straps as tilting stringers was therefore developed further and important lengths and angles regarding the tilting mechanisms were settled. A problem occurred due to the risk of the chair tilting completely around if the user leans too much forwards or backwards in the chair. Making the stringers stiff so that they can withstand pressure when introduced to a load solved this problem. The tilting function was still the same as with the regular straps because the stringers were attached in joints, allowing the stiff straps to rotate freely. An Idea using turnbuckles as stringer was developed. This solution ensured the required stiffness as well as possibilities for height adjustment and a stop mechanism for the tilting. The terms “Ergonomic” and “Environmental friendly” is introduced, and important elements from these was set as requirements for the chair concept. Design sketches, doodling and brainstorming generated ideas for different concepts. Different functional concepts was introduced and evaluated as sub-parts of the chair. One concept was chosen for each part resulting in a holistic concept for the chair.The preliminary work results in a final concept, which is presented in the form of hand sketches and a 3D model using the program NX 7.5 Mechatronics . A lot of time was spent on modeling a simple and functional design with ergonomic and environmental friendly solutions.A material analysis was conducted regarding the bearing structure of the chair using the Life cycle analysis tool Eco-indicator 99. The analysis compared aluminum and steel. Due to low environmental impact using recycled aluminum, this material was chosen for the VAPA-Chair. A life cycle analysis was also conducted on the chair using the program CES Edupack. The analysis showed that the part of the chair’s lifecycle that impacts the environment the most, is the production of materials. Based on these results, it is recommended that the VAPA-Chair should focus on weight optimization of the chair and use as much recycled aluminum as possible in the production. Based on results from the report, a list of recommendations for further work is presented.
427

Simulering av urban flom ved bruk av data fra værradar. / Simulation of urban Flood using Weather Radar Data.

Reinemo, Petter January 2012 (has links)
Urban flom forårsaket av store nedbørsmengder har et omfattende skadepotensiale. Forskning viser at det kan forventes en økt frekvens av tilfeller med store nedbørsmengder i Norge i fremtiden, som øker risikoen for urban flom. For å kunne ta hensyn til den forventede utviklingen i planlegging, dimensjonering og rehabilitering av overvannsystemer er kunnskap om slike situasjoner viktig. Kraftig nedbør opptrer ofte med stor romlig variasjon og over korte tidsperioder. For å analysere slike situasjoner er det derfor nødvendig med god tidsmessig og romlig oppløsning av nedbørsdata. Tradisjonelle nedbørstasjoner representerer punktmålinger. Det kreves derfor et tett nettverk av nedbørstasjoner for å fange opp de romlige variasjonene samt maksimalverdier for tilfeller med lokalt kraftig nedbør. Et slikt nettverk er de fleste steder en mangelvare. En værradar gir derimot verdier for et sammenhengende felt, slik at eventuelle romlige variasjoner av nedbøren blir fanget opp. Svakheten til radardata er at det ofte er knyttet stor usikkerhet til den kvantitative kvaliteten, samt at tiden mellom hver sveip ofte ikke tilfredsstiller urbanhydrologiske krav til tidsmessig oppløsning. Nesten hele Skandinavia er dekket av et nett av C-band værradarer, som gjør radarene til et potensielt verktøy for analyse av situasjoner med ekstremnedbør.I studiet er ekstremnedbørstilfellet som oppsto i Trondheim by 13. august 2007 analysert. Nedbørstilfellet ble fanget opp av seks lokale nedbørstasjoner spredt over byen, samt en C -band værradar. Dataene indikerer at nedbøren opptrådte med store romlige variasjoner. Data fra værradaren er derfor viktig i analysen. Den romlige oppløsningen på radarbildene, produsert for situasjonsstudiet, er 250meter × 250meter. For å bedre den tidsmessige oppløsningen til bildene, samt beskrive adveksjon, er det generert nedbørskart ved å interpolere mellom påfølgende radarbilder. Ved generering av nedbørskart er det gjort antagelser i forhold til nedbørens utvikling. En tidsmessig oppløsning på ett minutt er valgt og kvaliteten til kartene er vurdert. Kartene er justert opp mot observerte verdier ved nedbørstasjonene for å øke den kvantitative kvaliteten til dataene.Gjennom en romlig analyse av resultatene konkluderer studiet med at nedbørskartene beskriver fordeling og utvikling til nedbøren i større grad enn interpolert nedbør mellom nedbørstasjonene. Det er funnet en sammenheng i forholdet mellom akkumulert nedbør fra nedbørskart og nedbørstasjon. Det er tydelig at nedbørskartene, for situasjonsstudiet, underestimerer for økende 5 og 10 minutter akkumulerte nedbørsverdier. Situasjonsstudiet ble modulert ved bruk av fire kalibrerte Mike Urban modeller. Verdier fra nedbørskart og interpolert nedbør ble brukt som inngangsdata. Modellene som tok utgangspunkt i data fra nedbørskart ga kritisk trykkhøyde i flere ledningsstrekk i områder med skadesteder enn modellene basert på interpolert nedbør.Studiet viser at bruk av data fra en C-band værradar er egnet for analyse av en ekstremnedbørsituasjon. Metodikken benyttet i studiet kan være godt egnet for analyse av lignende tilfeller med kraftig nedbør.
428

Oppgradering av kontorbygg til plusshus : - Caseanalyse av Kjørbo / Upgrading of Office Buildings to Plus House - Case Analysis of Kjørbo

Overøye, Cecilie Schmidt January 2012 (has links)
Berekraftig utvikling er ei utvikling som imøtekjem dagens behov og samtidig legg til rette for komande generasjonar. Eit viktig satsingsområde for å oppnå dette er å redusere energiforbruket. Bygg står for om lag 40 % av det totale energiforbruket i Noreg og har eit stort potensial for å bli meir energieffektive. Kommunal-og regionaldepartementet (2009) har uttalt at omlag 80 % av dagens bygg vil framleis stå i 2050. Det er her det verkelege potensialet for energisparing ligg. Eit konsept for energieffektive bygg er passivbygg, som har eit lågt energibehov oppnådd gjennom passive tiltak som eksempelvis ein godt isolert bygningskropp og gjenvinning av varme frå ventilasjonslufta. Det mest ambisiøse energinivået for bygg er plusshus. Nett som passivbygg, har plusshus eit lågt energibehov, men produserer i tillegg meir energi enn det brukar. Plusshus kan definerast ut ifrå driftsfasa eller heile levetida til bygget, då eigenprodusert energi skal dekkje både energibehov for drift og bunden energi. Det er òg ulike meiningar om eigenprodusert energi skal dekkje energiforbruk relatert til teknisk utstyr, som heis, IT og kjøkken. Denne masteroppgåva greier ut om plusshus og utfordringar ein står overfor ved berekraftig oppgradering av eit kontorbygg til plusshus. I oppgåva er det tatt utgangspunkt i Kjørboparken 1, blokk 5, som er eit kontorbygg i Sandvika oppført i 1980. For å finne aktuelle tiltak for oppgradering er det gjennomført vurdering av tilstanden til bygget og energisimulering. Bygningen har per i dag eit energiforbruk på om lag 250 kWh/m2 per år. Varmetapstala for vindauge, ventilasjon, infiltrasjon og kuldebruer er høge. Energiforsyning til bygget består av fjernvarme, fjernkjøling og elektrisitet. Det er utarbeida to plusshuskonsept for bygget, der plusshus er definert ut ifrå eit levetidsperspektiv og følgjeleg er energi til både drift og bunden energi tatt omsyn til. Energiforbruk til drift av teknisk utstyr er ikkje medrekna. Hovudtiltaka i konsept 1 er etterisolering av tak og yttervegg, utskifting av vindauge, ventilasjonsanlegg og belysning, samt installasjon av varmepumpe, persienner og solcellepanel. Tiltak i samband med tekniske installasjonar og energiforsyning er likt for begge konsepta. Hovudtiltaka for konsept 2 er etterisolering av tak (100 mm meir enn konsept 1), golv på grunn og vegg under terreng, ny yttervegg, utskifting av vindauge og installasjon av persienner og solcellepanel på tak. Solcellepanela for dei to konsepta er ulike. Konsept 1 tilfredsstiller ikkje alle minstekrav i pr NS 3701 for bygningskomponentar, men vil bli plusshus ved installasjon av solcellepanel på taket til både bygningen og felles parkeringshus for Kjørboparken 1 og 2. Dette konseptet «brukar opp» takarealet på parkeringshuset og øydelegg moglegheitene for dei andre blokkene på Kjørbo til å bli plusshus ved gjennomføring av tilsvarande tiltak. Konsept 2 har solcellepanel installert på eige tak, og er eit 38 + hus. Talet 38 står for eit overskot av produsert energi på 38 000 kWh per år når drift av bygget er dekt. Konsept 2 oppfyller alle minstekrava i pr NS 3701, både for bygningskomponentar og energibehov. Energieffektiv energikjelde har stor innverknad på behovet for levert energi, som vart skildra ved å samanlikne konsept 1 og 2. Ut frå dette, samt økonomiske betraktningar, vart det anbefalt eit tredje konsept. Konseptet er stort sett basert på tiltak frå konsept 1, men nyttar vindauge og solcellepanel som i konsept 2. Konsept 3 er eit 37 + hus, sjølv om ikkje alle minstekrav for bygningskomponentar i pr NS 3701 er tilfredsstilt. For samanlikning av nødvendig installert solcelleareal er det tatt utgangspunkt i solcellepanela for konsept 2 og 3. Konsept 1 har størst energibehov av dei tre konsepta, men lågast investeringskostnad. Skilnaden mellom netto spesifikt energibehov for konsept 2 og 3 er 1,9 kWh/m2 per år, medan skilnaden mellom behovet for levert energi er berre 0,5 kWh/m2 per år. Investeringskostnaden for konsept 3 er 12 040 000 kr, som er 1 840 000 kr mindre enn for konsept 2. Nokon av hovudutfordringane med oppgradering til plusshus kan vere å tilfredsstille minstekrav i passivhusstandarden, viss dette er eit tilleggskriterium som skal vere oppfylt. For nokre bygningar kan det vere teknisk vanskeleg å oppfylle minstekrav, for eksempel U-verdi for vegg grunna verneomsyn og/eller plassrestriksjonar. I andre tilfelle kan det vere teknisk mogleg, men ikkje økonomisk forsvarleg. Ei anna utfordring ved oppgradering til plusshus er å ha tilstrekkeleg areal til å installere solceller. Det anbefalast å ikkje ha einsidig fokus på å oppnå alle minstekrava i passivhusstandarden. Det bør heller fokuserast på kompenserande tiltak som sørgjer for eit lågt behov for levert energi. Tiltak som minimerer oppvarmings- og kjølebehovet, og energieffektivt ventilasjonsanlegg og belysning er viktig. Energioppfølgingssystem og synleggjering av energiforbruket for brukarane av bygget kan òg bidra mykje til å redusere energiforbruket. Vidare anbefalast det at forskriftskrav og andre samanlikningsverkty skal basere seg på primærenergi. Det er primærenergi som gir «rett bilete» av totalt energiforbruk. Dette vil også forhindre at nokre energikjelder blir favorisert på feil grunnlag i forhold til andre energikjelder, t.d. varmepumpe og fjernvarme.
429

Power plant with CO2 capture based on adsorption

Westman, Snorre Foss January 2012 (has links)
A dynamic one-dimensional homogeneous model for a packed bed sorption-enhanced water-gas shift (SEWGS) reactor has been developed, describing the non-isothermal, non-adiabatic and non-isobaric operation of this type of reactor. The model was developed to describe a SEWGS reactor designed to work under operating conditions and syngas feeds encountered in a coal-fed Integrated Gasification Combined Cycle power plant utilizing an oxygen-fed gasifier. Different from previous integration designs reported in literature, the feasibility of leaving out the conventional high-temperature water-gas shift (WGS) reactor upstream of the SEWGS reactor has been investigated. The reactor was assumed to be packed with a mixture of K2CO3-promoted hydrotalcite CO2 adsorbent and commercial high-temperature FeCr-based water-gas shift catalyst pellets. Utilizing the reactor model, a mathematical modelling framework for the operation of eight SEWGS reactors in a SEWGS cycle has been developed. This system model accounts for all the necessary interactions between the reactors during the SEWGS cycle, including the exchange of mass in the feed, rinse, equalization and repressurization steps. In contrast to available open literature, the mathematical framework describes in detail how the necessary switches in the boundary conditions for the reactors have been realized.Simulations of several SEWGS cycles were carried out. The results were compared with experimental and modelling data from literature. Due to inconsistencies in the parameters and implementation of the model in the simulation software employed, results were in most aspects quantitatively not comparable to results from literature. However, the qualitative trends and physical mechanisms expected were observed and confirmed by the model. The temperatures in the reactors reached an unacceptable high level with respect to the tolerable operating conditions of the catalyst and adsorbent. It is planned to continue the work on the model, and implementing it within a full power plant model to investigate the effects of changes in the power production and thus the required amount of syngas to be treated.
430

UTVIKLING AV TESTVERKTØY FOR BILTILHENGERE / Development of Test Tool for Car Trailers

Heiland, Silje, Hughes, Markus Andreassen January 2012 (has links)
Bakgrunnen for denne oppgaven er et ønske fra tilhengerprodusenten Tysse om å utvikle en mer effektiv metode for å beregne levetid i forskjellige punkter på deres tilhengere. Dette skal gjøres ved å bruke strekklapper i stedet for destruktive metoder slik som brukes i dag. Motivasjonen er å spare tid og penger. Masteroppgaven er basert på prosjektoppgaven skrevet av samme studenter semesteret i forveien. Da masteroppgaven startet var teknologi og utstyr undersøkt og kjøpt inn. Masteroppgaven skal ta dette utstyret til en fungerende løsning. Dette kan i grove trekk deles inn i følgende punkter:•Tilpassing av måleutstyr•Materialtesting•Utvikling av framgangsmåteMåleutstyret var kjøpt og mottatt da masteroppgaven startet. Brokomplettering ble evaluert og en løsning ble valgt. Dette åpnet for feilsøking, og for å bli kjent med utstyret før testing av utstyret mot testriggen hos Tysse. Besøket bekreftet at valgt utstyr i prosjektoppgaven faktisk fungerte under forholdene. Kompletteringsenheter ble testet under realistiske forhold, noe som førte til utvikling av et nytt, mer robust design. Festemekanisme for måleutstyret mot tilhengeren ble prøvd ut sammen med fuktsikringen. Etter besøket hos Tysse ble det reservert tid i utmattingslaben der prøver av stålet i tilhengeren ble testet. Dette ble gjort for ytterligere å sikre realistiske resultater fra levetidsberegningene. Prøver ble maskinert, og materialstyrke ble funnet ved strekktesting. Strekktest og utmattingstest ble gjennomført basert på ISO standardene ISO 6892 og ISO 1099. Estimert SN kurve ble sammenliknet med data fra utmattingstestene. Framgangsmåten for testing av tilhengere ble revurdert i masteroppgaven. Den eksisterende metoden fra prosjektoppgaven ble satt opp mot en ny og enklere løsning som skulle bli bedre tilpasset Tysse. Programvaren for bearbeiding av datamateriale ble videreutviklet og ferdigstilt. Brukermanual som beskriver framgangsmåten steg for steg ble utviklet.Sluttresultatet ble levert til Tysse i Bergen med demonstrasjon og opplæring av dem som skulle bruke systemet videre. Det ble også lagt fram et forslag til videreføring av systemet.

Page generated in 0.0181 seconds