• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • 9
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 25
  • 25
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Rozpočtování stavebních prací pro účely znaleckých posudků / Budgeting works for the purposees of expert reports

Nykodýmová, Veronika January 2018 (has links)
In the more expert practice, we need an expert report, the main part of the budget works.The budget for the construction of the most by the degrese of project documentation. For the purposes of the budget for expert in most cases does not have the komplete project documentation, is contained in the file on the basis of oral communication to stakeholders and on the basic of which it requires, or which shall ensure in the measurement. The more quality work is available, the more accurate the output in the form of a budget.There is currently no single procedur efor the construction of production in an expert opinion. For theis mason, i tis the main aim of this thesis in a flowchart, the overview of the possibilities of obtaining the neceséry supporting documents to the budget and the tool works and how Theky should proceed in that report. Use the flowchart in expert practice shall be verified at model examples in the conclusion of this dissertation.
22

Řízení stavební zakázky z pohledu dodavatele / Management of Building Order from Aspect of Supplier

Vajbarová, Eliška January 2012 (has links)
Construction order is an essential production unit of a building company. Managing the order in a building company focuses on processing offers, productive preparation and realisation of construction works. The practical part of this thesis describes and examines the management of orders in two construction companies, whose production is oriented toward realisation of ground-based buildings. The result of this thesis is a comparison of these two companies, the lay-out of standard forms and their implementation into agency of the companies to improve their preparation and realisation of the order.
23

Zadávací řízení v procesu investiční výstavby / Tendering Procedure in Process of Investment Construction

Hrdinová, Eva January 2015 (has links)
The issue solved in this thesis is the procedure for the award of public contract with extensive subject matter of the construction works. In accordance with assumed level of fulfillment, over limit public order is awarded in open procedure. Afterwards, the analysis of submitted bids from contenders was created in parallel with an assessment of the impacts, which have occurred during the implementation of the fulfilling of the public contract. The thesis is examined from the perspective of the Act No. 137/2006 Coll., on Public Procurement, as amended. Future recommendation is the establishment of new amendment to that Act, with the aim to increase the evaluation criterion of economic advantageousness of tenders.
24

Školící středisko Zašová - stavebně technologický projekt / Training Center Zašová - construction technological project

Janíček, Jakub January 2014 (has links)
The subject of work is building-technology project Training center in Zasova. The study includes a technical report on the construction technological project, technical report of the site equipment project including a drawings, design of the main building machines, technical report of transport relations, itemized budget, the detailed time plan of the construction, technology regulations to of the selected construction processes, inspection and testing plans, occupational safety, environment, contract for construction works, major lifting mechanisms evaluation from an economic perspective.
25

Stavebně technologický projekt skladovací haly / Construction technology project of storage hall

Petrík, Tomáš January 2013 (has links)
In this diploma thesis is processed build-up organization of logistics centre in Ostrava. The build-up organization covers the implementation of ground works, foundation constructions and precast concrete framework. Storage hall of logistics centre is based on drilled concrete piles and precast concrete framework makes up main structure. Construction technology project contains time-schedule and financial plan for whole project, time-schedule of construction works, budget, technological standard for precast concrete framework, design of building site accessories, design of machine group, safety plan, check and test plan.

Page generated in 0.0787 seconds