Spelling suggestions: "subject:"pipe spolu fabrication"" "subject:"ripe spolu fabrication""
1 |
Combined Fuzzy and Probabilistic Simulation for Construction ManagementSadeghi, Naimeh Unknown Date
No description available.
|
2 |
Automated Planning and Scheduling for Industrial Construction ProcessesHu, Di Unknown Date
No description available.
|
3 |
Combined Fuzzy and Probabilistic Simulation for Construction ManagementSadeghi, Naimeh 11 1900 (has links)
Simulation has been used extensively for addressing probabilistic uncertainty in range estimating for construction projects. However, subjective and linguistically expressed information results in added non-probabilistic uncertainty in construction management. Fuzzy logic has been used successfully for representing such uncertainties in construction projects. In practice, an approach that can handle both random and fuzzy uncertainties in a risk assessment model is necessary. In this thesis, first, a Fuzzy Monte Carlo Simulation (FMCS) framework is proposed for risk analysis of construction projects. To verify the feasibility of the FMCS framework and demonstrate its main features, a cost range estimating template is developed and employed to estimate the cost of a highway overpass project. Second, a hybrid framework that considers both fuzzy and probabilistic uncertainty for discrete event simulation of construction projects is suggested. The application of the proposed framework is discussed using a real case study of a pipe spool fabrication shop. / Construction Engineering and Management
|
Page generated in 0.0995 seconds