Spelling suggestions: "subject:"biolítica tributária - obra pública"" "subject:"citolítica tributária - obra pública""
1 |
Medidas para evitar o superfaturamento decorrente dos "jogos de planilha" em obras públicas / Measures to prevent overpricing of public constructions resulting from the manipulation of spreadsheetsCampiteli, Marcus Vinicius 09 1900 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2006. / Submitted by Alexandre Marinho Pimenta (alexmpsin@hotmail.com) on 2009-11-18T19:34:00Z
No. of bitstreams: 1
Dissert_MarcusViniciusCampiteli.pdf: 695573 bytes, checksum: 528425e0ffc058cc70530771913286e1 (MD5) / Approved for entry into archive by Carolina Campos(carolinacamposmaia@gmail.com) on 2010-01-18T20:05:27Z (GMT) No. of bitstreams: 1
Dissert_MarcusViniciusCampiteli.pdf: 695573 bytes, checksum: 528425e0ffc058cc70530771913286e1 (MD5) / Made available in DSpace on 2010-01-18T20:05:27Z (GMT). No. of bitstreams: 1
Dissert_MarcusViniciusCampiteli.pdf: 695573 bytes, checksum: 528425e0ffc058cc70530771913286e1 (MD5)
Previous issue date: 2006-09 / Há muito desperdício de recursos públicos nos suntuosos montantes despendidos em obras no Brasil. Só em 2005, o Tribunal de Contas da União (TCU) evitou um desperdício em torno de R$ 1 bilhão, em atuações prévias e repactuações contratuais, e apontou o sobrepreço e o superfaturamento como os principais tipos de irregularidades constatados nas suas auditorias em contratações de obras federais. Muitas das vezes, tais desperdícios ocorrem por insuficiência na aplicação das normas legais existentes e não por existirem "brechas" na lei. De modo geral, o "jogo de planilha" caracteriza-se pela atribuição de diminutos preços unitários a serviços que de antemão a empresa sabe que não serão executados ou que terão os quantitativos diminuídos e de elevados preços a serviços que terão os seus quantitativos aumentados por meio de alterações contratuais sob o pretexto do atendimento do interesse público. Com isso, os licitantes vencem a competição propondo executar a obra por valor global abaixo dos demais concorrentes, valor este que pode se tornar o mais desvantajoso em relação às demais propostas ao longo da vigência contratual. A partir da legislação existente combinada com os conceitos de engenharia são propostas medidas prévias e concomitantes aos contratos de obras públicas para evitar a ocorrência do superfaturamento devido aos "jogos de planilha". As principais linhas de ação consistem na elaboração dos projetos executivos previamente às licitações e/ou contratações e na aplicação do critério de aceitabilidade de preços unitários no edital subsidiariamente ao critério de seleção pelo menor preço. São apresentadas também medidas saneadoras que foram adotados pelo TCU para eliminar os efeitos dos "jogos de planilha" em contratos já iniciados, por meio dos Métodos do Balanço e do Desconto, que se baseiam na manutenção do equilíbrio econômico dos contratos administrativos. __________________________________________________________________________________ ABSTRACT / Sumptuous amounts of public resources are wasted in constructions in Brazil. During
2005, the Tribunal de Contas da União (TCU) avoided the misapplication of around R$ 1
billion by means of actions previous to the signing of contracts as well as contract
renegotiations. This Court of Accounts has also appointed overpricing and overcharging as the main forms of irregularities observed in the audits performed in contracts of federal constructions by its team of analysts. Several times, such misapplication of public resources is due to the insufficient utilization of legal regulations and not to the existence of breaches in the legislation. Generally, the manipulation of spreadsheets is characterized
by the stipulation of reduced unitary prices to services which the bidder knows will not be executed throughout the contract or that will have their quantities diminished for some reason; likewise, higher prices are set to services which will have their amounts increased by means of contractual modifications that take place under the pretext of contemplating public interest. In consequence of that, one bidder wins the competition by proposing the execution of a construction with a global price which, apparently, is smaller than that of their contenders. Nevertheless, due to such manipulation of spreadsheets, the winning bid
can become disadvantageous in relation to the other proposals during the contract lifetime. Starting from the existing laws, combined with engineering concepts, we are proposing measures which should be taken previously or concurrently with public construction contracts in order to avoid the occurrence of overcharging due to the manipulation of spreadsheets. The main line of action consists of the elaboration of executive designs prior to the bid and/or signing of contract and the application of the unitary price acceptance criterion in the bidding regulation, supplementary to the minimum price rule. We also present sanitary measures that have been adopted by TCU with the objective of eliminating the effects of the manipulation of spreadsheets in existing contracts, by means of application of the Balance and the Discount Methods, which are based in the maintenance of the economic equilibrium of administrative contracts.
|
Page generated in 0.1013 seconds