Spelling suggestions: "subject:"productionsection/scheduling"" "subject:"productionisation/scheduling""
111 |
Optimization-based algorithms for a single level constrained resource problem.January 1996 (has links)
So Wai Kuen. / Year shown on spine: 1997. / Thesis (M.Phil.)--Chinese University of Hong Kong, 1996. / Includes bibliographical references (leaves 87-92). / INTRODUCTION --- p.1 / Chapter 1.1 --- Introduction to SLCR Problem --- p.1 / Chapter 1.2 --- Our Contributions --- p.1 / Chapter 1.3 --- Organization of the thesis --- p.3 / LITERATURE REVIEW --- p.4 / Chapter 2.1 --- Research in the Capacitated Resource Constraint Problem --- p.4 / Chapter 2.2 --- The Single Level Constrained Resource Problem --- p.5 / Chapter 2.3 --- The Multiple Level Constrained Resource Problem --- p.8 / Chapter 2.4 --- Research in the Fixed Charge Problem --- p.9 / Chapter 2.4.1 --- Approximate Methods --- p.9 / Chapter 2.4.2 --- Exact Methods --- p.10 / Chapter 2.5 --- Conclusion --- p.11 / THE SLCR PROBLEM WITH BACKORDERING --- p.12 / Chapter 3.1 --- Problem Description and Formulation --- p.13 / Chapter 3.2 --- Description of the heuristic --- p.19 / Chapter 3.2.1 --- Phase I --- p.19 / Chapter 3.2.2 --- Phase II --- p.26 / Chapter 3.3 --- Design of Computational Experiments --- p.30 / Chapter 3.3.1 --- Specifications of test problems ( 3 products and 12 period case ) --- p.31 / Chapter 3.3.2 --- Computation of the Lower Bound --- p.38 / Chapter 3.4 --- Computational Results --- p.39 / Chapter 3.5 --- Comparison to Millar and Yang's Algorithm --- p.48 / Chapter 3.5.1 --- Comparison Results --- p.49 / Chapter 3.6 --- Conclusion --- p.50 / THE OPTIMIZATION BASED ALGORITHM --- p.51 / Chapter 4.1 --- The Formulation --- p.52 / Chapter 4.2 --- The Algorithm --- p.60 / Chapter 4.2.1 --- Phase I --- p.60 / Chapter 4.2.2 --- Phase II --- p.63 / Chapter 4.2.3 --- Phase III --- p.70 / Chapter 4.3 --- An Illustrative Example --- p.72 / Chapter 4.4 --- Computational Results --- p.79 / Chapter 4.5 --- Conclusion --- p.84 / CONCLUSION --- p.85 / BIBLIOGRAPHY --- p.87
|
112 |
Development of the project definition rating index (PDRI) for building projects /Cho, Chung-suk, January 2000 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2000. / Vita. Includes bibliographical references (leaves 283-288). Available also in a digital version from Dissertation Abstracts.
|
113 |
Comparison of the Clarke-Wright algorithm for generation of optimal transportation schedulesShiffrin, James Henry, 1948- January 1972 (has links)
No description available.
|
114 |
Integer programming for imbedded unimodular constraint matrices with application to a course-time scheduling problemSwart, William Walter 08 1900 (has links)
No description available.
|
115 |
Optimum assignment and scheduling of artillery units to targetsLucas, Everett Dennis 05 1900 (has links)
No description available.
|
116 |
Simulation of dispatching rules for automotive service shopsPrante, Karen Lynn 08 1900 (has links)
No description available.
|
117 |
An integrated solution methodology for two-stage manufacturing operationsSmith, Neale R. 12 1900 (has links)
No description available.
|
118 |
A desision support system for session schedulingSchulz, Joseph Edward 08 1900 (has links)
No description available.
|
119 |
Lot size scheduling problem with two level setup cost/time structureChung, Jae Hyun 08 1900 (has links)
No description available.
|
120 |
A capacitated lot sizing procedure for material requirement planning systemsAl-sous, Imad Mohamed 12 1900 (has links)
No description available.
|
Page generated in 0.1308 seconds