Spelling suggestions: "subject:"productionsection/scheduling"" "subject:"productionisation/scheduling""
181 |
Mathematical Programming for Sequence Optimization in Block Cave MiningPourrahimian, Yashar Unknown Date
No description available.
|
182 |
Scheduling of distributed autonomous manufacturing systemsTharumarajah, A. January 1995 (has links)
This thesis addresses the scheduling and control of shop-floor production units that operate in a highly autonomous and distributed environment. The distinct feature of this environment is the heterarchical nature of the control where the scheduling function is quite independently carried out by the units. The units solve only part of the overall problem while resolving conflicts to maintain consistent global schedules. The need for communication and coordination, in such circumstances, introduces many complexities that affects the quality of the schedules produced. These include lapses of open-loop control due to uncertainty of up-to-date status information, asynchronous behaviour, and uncontrollable propagation of conflicts. / A behaviour-based approach is introduced to solve these problems. Using this approach, the organisation of the shop-floor is viewed as similar to a colony of ants or an eco-system. The units operate quite independently but continue to adapt their schedules to changes in their environment. While they may not directly negotiate to resolve conflicts, their cooperation is innate or in-built through their local adaptive actions. This individual cooperative action of the units brings about a collective behaviour that produces the desired emergent global schedules. The major focus of this research is in examining the link between the individual and collective behaviours and developing a model that realises the desired scheduling functionality at the shop level. / In order to achieve high scheduling performance (both locally and globally) a model of a unit incorporating dynamic problem decomposition, allocation algorithms and adaptation mechanisms is developed. For the latter, a reinforcement learning model is used to adapt the scheduling horizon. In fact, an important contribution if this research is the novel view we take of the problem and the manner of adaptation. In addition, a communication model for simulating the scheduling behaviours is designed using concepts of Holonic and other emerging concepts of manufacturing systems. / The model is tested for a number of scheduling problems representing a variety of production situations. Preliminary results indicate an impressive scheduling performance comparable to well-known heuristics. Further examination indicates the types of dynamic behaviour that can be expected of such a model, including the levels of unresolved conflicts, the adaptability in the face of uncertainty, consequence of alternative communication policies and the sensitivities to adaptation. / This thesis has also a strong qualitative theme in reviewing and consolidating the concepts underlying the design and operational attributes of autonomous distributed organisations of the shop-floor.
|
183 |
Highway earthwork and pavement production rates for construction time estimationKuo, Yao-chen, January 2004 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Vita. Includes bibliographical references (p. 329-334). Also available online via the University of Texas Libraries website (http://www.lib.utexas.edu/).
|
184 |
Gain scheduling via control signal interpolation the ball and beam example.Ignatov, Rouslan. January 2002 (has links)
Thesis (M.S.)--Ohio University, 2002. / Title from PDF t.p.
|
185 |
An evolutionary algorithm approach for assembly job shop scheduling with lot streaming techniqueWong, Tse-chiu. January 2007 (has links)
Thesis (Ph. D.)--University of Hong Kong, 2008. / Also available in print.
|
186 |
Using data mining to explore the regularity of genetic algorithms in job shop schedule problemsTsai, Shi-Chi. January 1997 (has links)
Thesis (M.S.)--Ohio University, November, 1997. / Title from PDF t.p.
|
187 |
Adaptive dispatching using genetic algorithms for multiple resourcesWongsavengwate, Pisamai. January 1997 (has links)
Thesis (M.S.)--Ohio University, March, 1997. / Title from PDF t.p.
|
188 |
Product scheduling for the makespan problem with sequence dependent setup timesCura, Boris. January 1993 (has links)
Thesis (M.S.)--Ohio University, August, 1993. / Title from PDF t.p.
|
189 |
Multi-objective optimization of manufacturing processes design /El-Sayed, Jacqueline Johnson, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 77-85). Also available on the Internet.
|
190 |
A method for solving the minimization of the maximum number of open stacks problem within a cutting processPoliquit, Elmer S. January 2008 (has links) (PDF)
Thesis (M.S.)--University of North Carolina Wilmington, 2008. / Title from PDF title page (viewed September 24, 2008) Includes bibliographical references (p. 46-47)
|
Page generated in 0.1057 seconds