• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 183
  • 143
  • 19
  • 17
  • 17
  • 10
  • 9
  • 9
  • 7
  • 6
  • 2
  • 2
  • 2
  • 2
  • 1
  • Tagged with
  • 479
  • 479
  • 141
  • 137
  • 124
  • 95
  • 79
  • 76
  • 71
  • 68
  • 67
  • 65
  • 63
  • 52
  • 51
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Computer-based short term forecasting for job-shop manufacturing systems

Chang, Tsong-how. January 1972 (has links)
Thesis (Ph. D.)--University of Wisconsin--Madison, 1972. / Typescript. Vita. eContent provider-neutral record in process. Description based on print version record. Includes bibliographical references.
32

Designing a fabric planning process for low volume orders in apparel industry /

Chan, Hoi Ying. January 2007 (has links)
Thesis (M.Phil.)--Hong Kong University of Science and Technology, 2007. / Includes bibliographical references (leaves 103-106). Also available in electronic version.
33

Utilising value stream mapping to improve operations at Transwerk Uitenhage

Silo, Andile Elliot January 2006 (has links)
Transwerk is a business uint of Transnet. It was established in 1940. Since 1940 unti 1994, Transwerk operated as the engineering section of Spoornet and was known as South African Railways. Transwerk emancipated in 1994 and had plants in all nine provinces of South Africa. In the past, trains were hauled by steam locomatives, which were manually operated. With the improvement of technology, steam locomotives were replaced by diesel locomotives. The recent technology improvement brought about electric locomotives which are more reliable than diesel locomotives.Trnaswerk has a plant in the Eastern Cape Province which is situated in Uitenhage. This plant focuses on refurbishing wagins for Spoornet. This research is about improving the refurbishing processes of Transwerk Uitenhage.
34

Multistage input-output models for complex production systems

Sigloch, Berndt Adolf January 1970 (has links)
The author develops a mathematically rigorous and concise formulation of a general, multistage input-output model for complex production systems, by integrating various useful concepts, developed in different disciplines. This model was designed to serve equally well for production planning, cost measurement and allocation purposes. After the objective, scope and methodology are set forth, the concepts of linking the stages of a production system and reducing the multistage model into different equivalent formats are demonstrated. Then the concepts of jumping inputs, internal flows and feedbacks are introduced into the model, to account for characteristics of more complex production systems. All previously discussed concepts are then integrated into a single, generalized input-output model. It is shown, how the physical model may be used to calculate the total costs of alternative production programs, how standard costs can be derived and how dollar-coefficient matrices may be used. Some of the existing literature is then integrated and evaluated within this new framework. Finally a summary is complemented by a list of areas that seem to deserve further research. / Business, Sauder School of / Graduate
35

The Impact of Workforce Level Restriction on the Performance of the Linear Decision Rule: An Exploratory Production Planning Study

Lisboa, Joao, Yasin, Mahmoud 01 January 1999 (has links)
This study examines the impact of workforce level restriction on the aggregate production planning problem. Based on the results of this study, it is concluded that the solution to the aggregate production problem appears to be the same regardless of workforce level restriction. Additional research utilizing multi-industry large-scale data is needed to test the applicability of findings derived from the current study.
36

Development and implementation of productivity measurement systems with emphasis on interorganizational relationships /

Sink, David Scott January 1978 (has links)
No description available.
37

Multi-item, single facility lot sizing problems

Cheah, Boon Soon January 1992 (has links)
No description available.
38

Production development and automation in Brazilian autopart manufacturing

Filho, Luis Hanna January 1992 (has links)
No description available.
39

A study of joint aggregate production planning : markdown pricing decision making problem under crisp and fuzzy environments /

Zhu, Wenyun. January 2009 (has links) (PDF)
Thesis (M.Phil.)--City University of Hong Kong, 2009. / "Submitted to Department of Management Sciences in partial fulfillment of the requirements for the degree of Master of Philosophy." Includes bibliographical references (leaves 125-133)
40

Assessing the complex product design process planning activity

DeLessio, Mark Philip January 2012 (has links)
No description available.

Page generated in 0.0938 seconds