Spelling suggestions: "subject:"productionsection cheduling"" "subject:"productionsection ascheduling""
191 |
Multi-objective optimization of manufacturing processes designEl-Sayed, Jacqueline Johnson, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 77-85). Also available on the Internet.
|
192 |
Economic lot scheduling with stochastic demands and lost sales /McKay, Mark. January 1999 (has links)
Thesis (Ph. D.)--University of Washington, 1999. / Vita. Includes bibliographical references (leaves [55]-60).
|
193 |
Heuristic scheduling of low acuity patients at the emergency departmentKhadndekar, Shashank. January 2007 (has links)
Thesis (M.S.)--State University of New York at Binghamton, Department of Systems Science and Industrial Engineering, 2007. / Includes bibliographical references (leaves 121-125).
|
194 |
Stochastic resource constrained project scheduling with stochastic task insertions problemsArcher, Sandra. January 2008 (has links)
Thesis (Ph.D.)--University of Central Florida, 2008. / Advisers: Robert L. Armacost, Julia Pet-Armacost. Includes bibliographical references (p. 405-416).
|
195 |
Highway earthwork and pavement production rates for construction time estimationKuo, Yao-chen, O'Connor, James Thomas, January 2004 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Supervisor: James T. O'Connor. Vita. Includes bibliographical references. Also available from UMI.
|
196 |
Using distributed computing to improve the performance of genetic algorithms for job shop scheduling problems /Shah, Nihar. January 2004 (has links)
Thesis (M.S.)--Ohio University, August, 2004. / Includes bibliographical references (p. 65-69).
|
197 |
Applying data mining to job-shop scheduling using regression analysis /Innani, Alok D. January 2004 (has links)
Thesis (M.S.)--Ohio University, August, 2004. / Includes bibliographical references (p. 84-87).
|
198 |
Modeling scheduling algorithms with alternative process plans in an optimization programming language /Harihara, Ramachandra Sharma. January 2004 (has links)
Thesis (M.S.)--Ohio University, November, 2004. / Includes bibliographical references (p. 87-89)
|
199 |
Cell loading and scheduling in a shoe manufacturing company /Subramanian, Ananthanarayanan K. January 2004 (has links)
Thesis (M.S.)--Ohio University, November, 2004. / Includes bibliographical references (p. 126-130)
|
200 |
Improvements to construction delay analysis techniques /Popescu-Kohler, Anamaria Iuliana, January 1998 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 1998. / Vita. Includes bibliographical references (leaves 165-167). Available also in a digital version from Dissertation Abstracts.
|
Page generated in 0.1079 seconds