Spelling suggestions: "subject:"productionsection control. inventory control."" "subject:"productionsection control. lnventory control.""
1 |
Effective dispatching in the material requirements planning job shop /McCaskey, Donald Wayne, January 1987 (has links)
Thesis (Ph. D.)--Ohio State University, 1987. / Includes vita. Includes bibliographical references (leaves 399-417). Available online via OhioLINK's ETD Center.
|
2 |
Comparing dynamic risk-based scheduling methods with MRP via simulation /Sun, Li. January 2008 (has links) (PDF)
Thesis (M.S.)--University of Louisville, 2008. / Department of Industrial Engineering. Vita. "December 2008." Includes bibliographical references (leaves 82-85).
|
3 |
Planning stability in material requirements planning systems /Heisig, Gerald. January 1900 (has links)
Thesis (doctoral)--Universität, Magdeburg. / Includes bibliographical references.
|
Page generated in 0.1481 seconds