Spelling suggestions: "subject:"productionsection scheduling bob shock"" "subject:"productionsection scheduling oob shock""
1 |
Scheduling flexible flowshops with sequence dependent setup timesSethanan, Kanchana, January 2001 (has links)
Thesis (Ph. D.)--West Virginia University, 2001. / Title from document title page. Document formatted into pages; contains xi, 181 p. : ill. Includes abstract. Includes bibliographical references (p. 162-167).
|
2 |
Minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffersCrowder, Bret. January 2006 (has links)
Thesis (M.S.)--West Virginia University, 2006. / Title from document title page. Document formatted into pages; contains viii, 136 p. : ill. Includes abstract. Includes bibliographical references (p. 96-106).
|
3 |
A modified shifting bottleneck approach to job shop scheduling with sequence dependent setups (MSBSS) /Sun, Xiaoqing, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 119-128). Also available on the Internet.
|
4 |
A modified shifting bottleneck approach to job shop scheduling with sequence dependent setups (MSBSS)Sun, Xiaoqing, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 119-128). Also available on the Internet.
|
Page generated in 0.1296 seconds