Spelling suggestions: "subject:"5project management"" "subject:"3kproject management""
391 |
A service-oriented approach for collaborative process managementKim, Woongsup. January 2006 (has links)
Thesis (Ph. D.)--Michigan State University. Dept. of Computer Science and Engineering, 2006. / Title from PDF t.p. (viewed on June 19, 2009) Includes bibliographical references (p. 138-151). Also issued in print.
|
392 |
Assessment of uncertainty management approaches in construction organizationsJayaraman, Venkataramanan. January 2006 (has links)
Thesis (M. S.)--Michigan State University. Construction Management Program , 2006. / Title from PDF t.p. (viewed on June 19, 2009) Includes bibliographical references (p. 147-150). Also issued in print.
|
393 |
Factors constraining the development of professional project management in Turkey's urban design practice/Kılınç, Deniz. Günaydın, H. Murat January 2004 (has links) (PDF)
Thesis (Master)--İzmir Institute of Technology,İzmir, 2004 / Includes bibliographical references (leaves. 75).
|
394 |
Total quality management in the constructed projectPoon, Kai-jee, Edward. January 1989 (has links)
Thesis (M.Sc.)--University of Hong Kong, 1990. / Also available in print.
|
395 |
Empowerment and control dynamics in project teams a multilevel examination of the antecedents and job performance consequences /Tuuli, Martin Morgan. January 2009 (has links)
Thesis (Ph. D.)--University of Hong Kong, 2009. / Includes bibliographical references (p. 440-471). Also available in print.
|
396 |
Applying the PDRI in project risk managementWang, Yu-ren, January 2002 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2002. / Vita. Includes bibliographical references. Available also from UMI Company.
|
397 |
Empowerment and control dynamics in project teams : a multilevel examination of the antecedents and job performance consequences /Tuuli, Martin Morgan. January 2009 (has links)
Thesis (Ph. D.)--University of Hong Kong, 2009. / Includes bibliographical references (p. 440-471). Also available online.
|
398 |
Enhancements and extensions of formal models for risk sssessment in software projects /Murrah, Michael R. January 2002 (has links) (PDF)
Thesis (Ph. D. in Software Engineering)--Naval Postgraduate School, September 2002. / Dissertation advisor: Luqi. Includes bibliographical references (p. 341-349). Also available online.
|
399 |
Project becoming and knowing trajectories : an epistemological perspective on human and nonhuman project making /Niss, Camilla, January 2009 (has links)
Diss. Stockholm : Kungliga Tekniska högskolan, 2009.
|
400 |
What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask /Sideris, George. January 1990 (has links) (PDF)
Thesis (M.S. in Management)--Naval Postgraduate School, June 1990. / Thesis Advisor(s): Trietsch, Dan. Second Reader: Papoulias, Photis. "June 1990." Description based on title page as viewed on October 16, 2009. DTIC Identifier(s): Shipbuilding, Management planning and control, Quality control, Performance(Human), Construction, Theses, Project management. Author(s) subject terms: Project Management, Naval Construction-ship-building, Contract administration. Includes bibliographical references (p. 70-71). Also available online.
|
Page generated in 0.078 seconds