• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 174
  • 2
  • 1
  • 1
  • Tagged with
  • 179
  • 179
  • 172
  • 170
  • 93
  • 86
  • 84
  • 67
  • 65
  • 36
  • 36
  • 35
  • 32
  • 31
  • 30
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Stavebně technologické řešení bytového domu Zderadova / Construction and technological solutions to the apartment building Zderadova

Petinis, Janis January 2012 (has links)
The subject of the Master´s thesis is “Construction and technological solutions to the apartment building Zderadova“. The content is a solution of the whole project from a commercial, construction-technological and time costingness side. The purpose was a preparation of all works before starting an execution.
92

Požární stanice / Fire station

Hoferek, Radomír Unknown Date (has links)
The subject of the diploma’s thesis is elaboration of design documentation for execution of an fire station. The fire station building will be used for the continuous performance of the fire protection units of the Fire and Rescue Service of the Czech Republic for the Olomouc region. The fire station is divided into two operating units. The first part is three storey, partly basement – administrative. The second ground floor is consist of garage spaces and technical background. Both units are dispositionally and operationally interconnected. The structural system in the part of the administration and technical background is wall transverse system made of clay blocks, except of perimeter basement walls, which are lined with concrete fittings (lost formwork). The garage spaces are formed of precast concrete frame. The roof structure is designed as a warm flat roof. The whole object is insulated with a certified thermal insulation system.
93

Analýza rozdílů podrobnosti rozpočtu v závislosti na stupni dokumentace / Analysis of budget detail differences depending on the level of documentation

Hrstka, Lukáš Unknown Date (has links)
This thesis is dedicated to comparing overall prices as well as the creation of budget indicators in individual phases of documentation for buildings belonging among public orders. The thesis primarily determines fundamental terms and definitions regarding this issue. The creation of a new database for the buildings that is compiled of twenty subjects projected in the last four years is described in the second more detailed part. Objects in this database are indexed by temporal indexes for the sake of future more accurate comparisons and the creation of indicators. The comparison of the objects' prices in different phases of documentation can be found in this part along with two calculated specific budget indicators corresponding to unit price per one cubic meter of building volume and to the price per one meter squared of floor area. The average indicator for informative price based on previous indicators is then created for faster evaluation of similar types of objects in their study phase. Performed research has revealed significant differences between study phase prices and the prices of more detailed phases of documentation that can negatively affect the future of a specific project. The main conclusion of this thesis are average overall unit prices for civil constructions, production and service buildings as well as other specific buildings. In the final part I have created methods of a more accurate calculation for the unit price of buildings in the study phase of documentation.
94

Řešení jezdeckého areálu se stájí pro koně včetně příslušenství

ZEIS, Martin January 2018 (has links)
The topic of the master thesis is design of the new building of the equestrian center with the stable for horses. The thesis is divided into two main parts. The first part deals with development of the horse breeding and buildings for breeding horses. In the second part of the master thesis there is a proposal for the new equestrian center with stable for horses. The new equestrial center is a fictious building located on the real estate in the village of Mokrý Lom.
95

Návrh projektové dokumentace polní cesty konkrétně zohledňující retenci a akumulaci vody v rámci pozemkové úpravy / Draft of the project documentation of field road particulary reflecting water retention and accumulation in the land consolidation

MARKOVÁ, Dana January 2013 (has links)
The goal of this thesis is to draft a project documentation of the new field road reflecting water retention and accumulation within the complex land consolidation. Territory, suitable for the construction of this new field road, is located in the foothills of the Novohradské hory, about 12 km southeast of the village Trhové Sviny. The chosen location with local names "U hrušky" and "Na 22 hektarech" is located in the eastern part of the cadastral area Dlouhá Stropnice. Proposed practical solution of project documentation of side field road design category P4,0/30 completed with a suitable alternative drainage is based on the theoretical summary of the literature review in this thesis. Other objects - fall culverts and landscaping the surrounding areas are included in the conception of project proposal. An integral part and basis for making the draft was field survey and subsequent analysis of the current status of the affected area.
96

Návrh řešení bezbariérového přístupu v širším okolí u náměstí v Týně nad Vltavou. / The Design of the solution to the wheelchair access in the wide surroundings of Týn nad Vltavou square.

SUCHANOVÁ, Kateřina January 2009 (has links)
This thesis includes a study of the chosen area in the town of Týn nad Vltavou from the point of view of barrierless conception. I monitored the starting state in this area and I compared it with all valid legal regulations and norms. I pointed out the weaknesses of the starting state in this area. The complex barrierless area could be established by removing these weaknesses. This new area could be open not only to healthy people but also to people with limited ability of movement and orientation. I determined the order of the changes urgency. This means which elements should be reconstructed and modified to the barrierless state as soon as possible. I was interested in the state of the footpaths, crossings for the people, car-parks, staircases and other elements. I was also interested in the accessibility of civil facilities {--} the medical centre, the pharmacy, the town laundry, the building with care service and the post office. I chose one part of the footpath for the technical solution. The barrierless solution is missing in this part of the footpath. I elaborated project documentation for this part of the footpath needed for granting the building permission because the footpath is situated in the direct proximity of citizens´ residences and infrastructure network leads through this footpath. The drawings have been processed by visualization cad application. This diploma thesis also contains the list of the valid legal regulations and publications which deal with the problems of the barrierless areas.
97

Návrh metodiky pro tvorbu webových stránek s důrazem na UX / A creation of a web design methodology with an emphasis on UX

Hadamčík, Lukáš January 2012 (has links)
This master thesis suggests a new design methodology used for creating web pages, with an emphasis on User Experience (UX). The thesis does not focus on specific web technol-ogies, but it rather concentrates on the process of preparation and design of websites. When applying such a process, the websites will not only meet clients business objectives, but it will also satisfy users requirements. The theoretical part of this thesis summarizes the information about User Experience De-sign, defining its processes, terms, tools, tasks and roles associated with it. The outline may serve the developer and the client as a guide when realizing a project or creating a demand for one. The main aim of the practical part is to introduce a new methodology for creating websites focusing mainly on the UX. The methodology is proposed by the author himself, based on his many years of experience in the field, and tested on a real project which is also present-ed in the practical part.
98

Resort Sázava / Resort Sázava

Černý, Jakub January 2018 (has links)
Subject of this diploma thesis is a design of a newly built accommodation and relaxation centre Resort Sázava. The structure is located on a sloping plot near town Sázava, in Kraj Vysočina. The locality is situated in preserved area Žďárské vrchy. The facility is divided into three buildings by their function. The buildings have rectangular shapes and have gabled roofing. The resort offers services of accomodation, boarding, conferences, relaxation and sports. The whole facility was designed in architectural study along with its functional linkups. Object SO 01 with restaurant and conference rooms was designed in detailed design documentation.
99

Centrum zdraví Mediface / Health centre Mediface

Burget, Jan January 2018 (has links)
Project of health center with facilities for civic amenities. It is a three-storey above ground object. On the ground floor there is a pharmacy, a veterinary station and a medical office. On the second floor there are six medical offices and a technical room. On the third floor there are 4 spaces for civic amenities. Vertical load-bearing structure consists of masonry of ceramic blocks and internal monolithic reinforced concrete skeleton. Horizontal load-bearing structure is made of reinforced concrete beams and prestressed reinforced concrete panels. The building is based on concrete foundation strips and reinforced concrete pads. The building is roofed with a warm flat green roof. Thermal insulation of the facade is made of mineral wool insulation and has a ventilated facade.
100

Polyfunkční dům / Multifunctional house

Kostrhounová, Irena January 2018 (has links)
This diploma thesis deals with the solution of a construction of a corner gap site. A multifunctional house comprising three business establishments and nine residential units has been designed. Business premises will be used as stores. The apartments are designed for 4-member families. The multifunctional house has an atypical ground plan with a total area of 512 m2. The object has a basement and four above-ground floors, the business establishment is located on the first above-ground floor. The garage will be operated in automatic parking mode. The entire building is covered with a single-layer flat roof. The project is processed using the AutoCAD computer program.

Page generated in 0.0976 seconds