• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Change management in the construction industry : a client's mechanism for control

Coutts, Alister William January 1997 (has links)
This research project constitutes an attempt to improve the construction industry's change management process by introducing the Form 'X' Control Mechanism as the means of establishing an effective method of project control. The traditional practice in the construction industry of appointing the principal designer as team leader has been challenged with the main criticisms on the traditional practice being his, or her, lack of managerial ability and his, or her, failure to control the financial aspects of the project. The traditional approach has remained essentially unchanged for more than a century but it has become increasingly questioned as the primary means of design management. One aim of the research, therefore, was to ascertain whether the traditional practices currently is use in the United Kingdom and Hong Kong could be improved upon. The research began by examining basic systems and project management concepts and noted the development of project management systems and structures for the construction industry. This was illustrated by reference to a number of articles and it was possible to argue that the industry lacked a comprehensive change control methodology. The research also provided evidence that the mechanisms used to exercise control in manufacturing industries could not be used to exercise control over construction projects. This is due, in the main, to the relatively short duration of construction projects and the transient nature of project personnel. Having examined the difficulties, it has been possible to devise a control methodology which couples communication and control and this mechanism has been adapted to fit existing industry practices. Using this criterion it was possible to formulate a control procedure which obviates the difficulties which can arise using the traditional approach to change management. The Form 'X' mechanism requires the design team to quantify, in financial and programme terms, the effect of design or construction changes, and to obtain the client's specific authority prior to revising the works. In doing so the Project Manager is able to determine the magnitude of all changes in terms of time, money and quality. The system is sufficiently flexible to enable it to be used world-wide, on projects of varying contract values and duration, and it requires only minor modifications to meet the provisions of the standard building and civil engineering conditions of contract. A variant of the proposed methodology was introduced by Hong Kong's Mass Transit Railway Corporation and utilised on a number of projects. These contracts were examined in detail, as were a number of Mass Transit Railway Corporation contracts which utilised the traditional approach to project control. The analysis showed that all of the projects on which the Form 'X' system had been used had been completed close to their original contract value whilst a number of the projects which did not use the control methodology suffered from significant cost over-runs. It was concluded that the Form 'X' methodology successfully eradicates many of the control problems which permeate the traditional approach to change management embodied in the standard conditions of contract for building and civil engineering works. The Form 'X' control approach was also shown to be popular with the Hong Kong Mass Transit Railway Corporation's senior management team, as well as with the consultants employed in the construction of the railway. The conclusion of the research project is that the Form 'X' procedure is a highly successful change control methodology which could be used throughout the world on a wide variety of building and civil engineering projects.
2

Managing project uncertainty by using an enhanced risk management process /

Olsson, Rolf, January 1900 (has links)
Diss. (sammanfattning) Västerås : Mälardalens högskola, 2006. / Härtill 5 uppsatser.
3

The use of parametric cost estimating and risk management techniques to improve project cost estimates during feasibility studies

Molefi, Khotso Daniel 25 November 2013 (has links)
M.Ing. (Engineering Management) / “A robust set of estimates puts a project on a firm footing from day 1, allowing the project manager to apply the right level of resources at the appropriate time. If the plan has been based on poor estimates, problems will occur during the execution of the project …” This statement places great importance on the ability to estimate costs as accurately as practicable early during a project life cycle. Many techniques have been proposed with the aim of aiding with the production of early cost estimates,which have acceptable accuracies necessary for Feasibility Study purposes. One such technique is Parametric Cost Estimating for developing Parametric Cost Models used in producing these conceptual estimates.At the heart of Parametric Cost Estimating Technique, is a fundamental statistical technique commonly known as Linear Regression Analysis.The problem that the research addresses is that of the general misconception found to prevail within project houses that some engineering systems are too complex to model using the Parametric Cost Estimating Technique. The objectives of this research are to investigate and demonstrate the effectiveness of this technique in predicting the costs of a system for Feasibility Study purposes. The objectives were achieved by conducting a secondary literature review of case studies of similar Parametric Cost Models that were developed by others for engineering systems of varying complexities. A second method used in achieving the objectives included formulating a case study in which a Parametric Cost Model was developed to illustrate the concept and to prove that the accuracies produced by the model meet the requirements for Feasibility Studies.The research was limited to initial project costs required for Feasibility Studies,ignoring the effects of qualitative factors,focusing only on the acquisition costs and not the total life cycle costs of the system.The case study was developed for a passenger motor vehicle as the system of interest because sufficient cost data in the form of vehicle retail price and performance specifications is publicly available in car magazines making it possible to build a meaningful Parametric Cost Model. The Parametric Cost Model was developed using Microsoft Excel 2007 and had a Mean Absolute Error Rate of 10.9% and the range of accuracy obtained, -20% to 10% with 67% confidence level and -30% to 30% with 95% confidence level, conforming to a Class 4 estimate which meets the accuracy requirements for a Feasibility Study.

Page generated in 0.1191 seconds