Spelling suggestions: "subject:"cublic buildings"" "subject:"cublic inbuildings""
31 |
A strategic approach to enhancing sustainable practices in public building projects : a case study of Indonesian Local AuthoritiesHermawan, F. January 2015 (has links)
In the last few decades, there has been well documented evidence that the performance of the public building projects in local authorities in Indonesia does not fully meet the expectation of the stakeholders involved and demonstrates sustainable practices. This mediocre performance impacts on the competitiveness of building industry, and therefore would require the development of a strategic approach to address these fundamental structural and cultural issues. The strategic approach, which facilitates sustainable practices, to a large extent, depends on the local priorities, goals and success criteria, which are dynamic and influenced by the expectations of various stakeholders involved in the procurement of public buildings. This research aims to develop a conceptual framework that will help local authorities to enhance sustainable practices of public building management. The empirical research work adopted case study strategy involving interviews with 24 public building practitioners and investigation of building defects on 34 projects. This research proposes LACU model, which represents a triangular relationship between contractors, local authorities and building end-users to illustrate the interactions between parties when undertaking their tasks throughout the project lifecycle. A framework of Sustainable-Dynamic Capabilities was developed and applied to enhance understanding of sustainability provisions in public building development. Based on this framework and stakeholders’ mapping illustrated by LACU model, this research has enhanced understanding on strategies of local authority to implement sustainable practices on public building projects. A template analysis through interview transcripts has been adopted to identify strategic approaches of local authority to deliver successful project by determining the roles of stakeholder at three different levels, provincial, regency or city and special authority. This research provides a novel empirically-based guidance for the local authorities to undertake sustainable public building procurement throughout project life cycle by adopting strategic approaches, such as employing innovative construction method, appropriate policy intervention by local leader, and changing business orientation.
|
32 |
An overview of guidance notes for the management of indoor air quality in offices and public places /Chu, Kiu-fung, Truman. January 2001 (has links)
Thesis (M.A.)--University of Hong Kong, 2001. / Includes bibliographical references.
|
33 |
Custom, contrast or compromise: the transfer of culture from Old to New England in the seventeenth century: Ormesby, Norfolk to Hampton, New HampshireMacAllan, Barbara January 1999 (has links)
No description available.
|
34 |
Planar maximal covering location problem under different block norms /Younies, Hassan Zeidan. Wesolowsky, George O. January 2004 (has links)
Thesis (Ph.D.)--McMaster University, 2004. / Supervisor: George O. Wesolowsky. Includes bibliographical references (leaves 120-125). Also available online.
|
35 |
Reusing the institution issues, obstacles and principles to foster community development through institutional reuse /Marron, John F. January 2009 (has links)
Thesis (M.U.R.P.)--Ball State University, 2009. / Title from PDF t.p. (viewed on Mar. 25, 2010). Research paper (M.U.R.P.), 3 hrs. Includes bibliographical references (p. [155]-159).
|
36 |
Reinterpretation of the ICAC regional office.January 1998 (has links)
To Pui Yin Calvin. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 1997-98, design report." / Chapter I. --- Synopsis / Chapter II. --- Background / Chapter III. --- Programme Aspect / Chapter i. --- Client and User Profile / Chapter ii. --- Site Selection / Chapter a. --- Selection criteria of site selection / Chapter b. --- Site location and information / Chapter iii. --- Site Analysis / Chapter iv. --- Planning and Statutory Constraints / Chapter v. --- Schedule of Accommodation / Chapter vi. --- Bubble Diagram / Chapter IV. --- Design Aspect / Chapter i. --- Design Mission / Chapter ii. --- Design Process / Chapter a. --- Preliminary Options / Chapter b. --- Schematic Concept / Chapter c. --- Design Development / Chapter d. --- Final Design / Chapter iii. --- Structure & Construction / Chapter a. --- Options & Solution / Chapter b. --- Construction Sequence / Chapter c. --- Construction Detail / Chapter iv. --- Environmental Concern / Chapter a. --- Daylighting / Chapter b. --- Artificial Lighting / Chapter c. --- HVAC / Chapter d. --- Plumbing & Drainage / Chapter v. --- Life Safety / Chapter a. --- Fire Engineering / Chapter b. --- Means of Escape / Chapter vi. --- Special Study / Chapter a. --- Structure Analysis / Chapter b. --- Cable Detail Study of Bridge / Chapter vii. --- Cost / Chapter a. --- Cost Analysis / Chapter b. --- Project Finance / Chapter c. --- Professional Fee
|
37 |
Headquarters for the PLA. / Headquarters for the People's Liberation ArmyJanuary 1997 (has links)
Lee Lai Peng Elizabeth. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 1996-97, design report." / Includes bibliographical references. / Introduction / Chapter I --- point of departure --- p.1 / Chapter II --- project selection --- p.1 / clients and users / project analysis / Chapter III --- subject analysis / project Portrait --- p.1 / precedents --- p.2 / Chapter IV --- client / user analysis / functional Relationships --- p.1 / schedule of accommodation --- p.2 / Chapter V --- site / context analysis / location --- p.1 / context / access / transportation --- p.2 / future reclamation --- p.3 / restrictions --- p.4 / Chapter VI --- process / archipoint --- p.1 / identify the problem --- p.3 / conceptual --- p.9 / development --- p.15 / master plan --- p.17 / design development --- p.21 / summary --- p.23 / Chapter VII --- final project / major planning strategy --- p.1 / landscape strategy --- p.5 / site planning --- p.7 / volumetrics --- p.8 / functional relationship --- p.9 / circulation --- p.10 / shared use studies --- p.11 / detail studies --- p.13
|
38 |
Ma On Shan Community Centre and Library /Wong, Wai-lam, William, January 2000 (has links)
Thesis (M. Arch.)--University of Hong Kong, 2000. / Includes special report study entitled: Lighting : space and material. Includes bibliographical references.
|
39 |
Kwun Tong civil/cultural complex姚木輝, Yiu, Muk-fai. January 1995 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
40 |
Sham Shui Po Civic ComplexYan, Ching-hung., 殷正雄. January 1997 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
Page generated in 0.0767 seconds