Spelling suggestions: "subject:"cublic buildingshong long"" "subject:"cublic buildingshong hong""
1 |
HKSAR government headquarters.January 1999 (has links)
Yeung Pak Shing. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 1998-99, design report." / Includes bibliographical references. / WORK SCHEDULE / Chapter 1. --- POINT OF DEPARTURE / Chapter 2. --- SUBJECT ANALYSIS / Chapter 3. --- PROJECT ANALYSIS / Chapter 4. --- DESIGN PROCESS / Chapter 5. --- BUILDING SYSTEMS & REGULATIONS / APPENDIX / Chapter a. --- Programming Report / Chapter b. --- Final Presentation / ACKNOWLEDGEMENT
|
2 |
Redevelopment of Lo Wu Immigration Building /Chan, Yuk-hong, Clark. January 2001 (has links)
Thesis (M. Arch.)--University of Hong Kong, 2001. / Includes special report study entitled: Analysis of interaction between the lands divided by a border. Includes bibliographical references.
|
3 |
Redevelopment of Lo Wu Immigration BuildingChan, Yuk-hong, Clark. January 2001 (has links)
Thesis (M.Arch.)--University of Hong Kong, 2001. / Includes special report study entitled : Analysis of interaction between the lands divided by a border. Includes bibliographical references. Also available in print.
|
4 |
Reinterpretation of the ICAC regional office.January 1998 (has links)
To Pui Yin Calvin. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 1997-98, design report." / Chapter I. --- Synopsis / Chapter II. --- Background / Chapter III. --- Programme Aspect / Chapter i. --- Client and User Profile / Chapter ii. --- Site Selection / Chapter a. --- Selection criteria of site selection / Chapter b. --- Site location and information / Chapter iii. --- Site Analysis / Chapter iv. --- Planning and Statutory Constraints / Chapter v. --- Schedule of Accommodation / Chapter vi. --- Bubble Diagram / Chapter IV. --- Design Aspect / Chapter i. --- Design Mission / Chapter ii. --- Design Process / Chapter a. --- Preliminary Options / Chapter b. --- Schematic Concept / Chapter c. --- Design Development / Chapter d. --- Final Design / Chapter iii. --- Structure & Construction / Chapter a. --- Options & Solution / Chapter b. --- Construction Sequence / Chapter c. --- Construction Detail / Chapter iv. --- Environmental Concern / Chapter a. --- Daylighting / Chapter b. --- Artificial Lighting / Chapter c. --- HVAC / Chapter d. --- Plumbing & Drainage / Chapter v. --- Life Safety / Chapter a. --- Fire Engineering / Chapter b. --- Means of Escape / Chapter vi. --- Special Study / Chapter a. --- Structure Analysis / Chapter b. --- Cable Detail Study of Bridge / Chapter vii. --- Cost / Chapter a. --- Cost Analysis / Chapter b. --- Project Finance / Chapter c. --- Professional Fee
|
5 |
"Soul of the city".January 2003 (has links)
Lee Wai Kwan. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 2002-2003, design report." / Includes bibliographical references (leaf [55]). / "Research Study and Design Statement - People, City and Urban Space" / Preface --- p.2 / "People, Country, Square" --- p.5 / The Square Today --- p.7 / People's Political Act --- p.8 / Our Civic Square --- p.9 / Greek Political Space --- p.10 / Agora & Forum in Rome --- p.11 / Self Governance - Noble Monarchy in Medieval Age --- p.12 / Differentiation and Integration in Function --- p.13 / Renaissance - Art Science and Life --- p.14 / Grandeur in Perspectives --- p.15 / Studying Hong Kong: / Economy --- p.16 / Politics --- p.21 / Culture --- p.25 / "Architectural Study and Design - New Government Centre, Tamar Site" / Preface --- p.31 / Symbolic Form of Governance --- p.35 / Public Involvement --- p.36 / Volume and Density --- p.37 / Accessibility --- p.38 / New German Chancellery --- p.39 / Regional Expressionism --- p.40 / Drawing Plates (i-xi) / "Appendix: Building Programme from Government Information (Central Government Complex, Legislative Council and Exhibition Centre)" / Bibliography
|
6 |
New legislative council building.January 2003 (has links)
Chung Chi Wai. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 2002-2003, design report." / Includes bibliographical references. / Statement --- p.4 / Studies / Parliamentary Building --- p.5 / Debating Chamber --- p.33 / Scale and Proportion --- p.49 / Transparency --- p.61 / Site --- p.74 / Program / Schedule of Accommodation --- p.76 / Functional Configuration --- p.79 / Exploration --- p.81 / Fragmentary Approach --- p.82 / Modular Approach --- p.86 / Geometry --- p.89 / Structure --- p.91 / Functional Re-configuration --- p.94 / Circulation --- p.95 / Final Design --- p.96 / Plan --- p.98 / Elevation --- p.105 / Section --- p.107 / Perspective Views --- p.108 / Model --- p.109
|
7 |
Headquarters for the PLA. / Headquarters for the People's Liberation ArmyJanuary 1997 (has links)
Lee Lai Peng Elizabeth. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 1996-97, design report." / Includes bibliographical references. / Introduction / Chapter I --- point of departure --- p.1 / Chapter II --- project selection --- p.1 / clients and users / project analysis / Chapter III --- subject analysis / project Portrait --- p.1 / precedents --- p.2 / Chapter IV --- client / user analysis / functional Relationships --- p.1 / schedule of accommodation --- p.2 / Chapter V --- site / context analysis / location --- p.1 / context / access / transportation --- p.2 / future reclamation --- p.3 / restrictions --- p.4 / Chapter VI --- process / archipoint --- p.1 / identify the problem --- p.3 / conceptual --- p.9 / development --- p.15 / master plan --- p.17 / design development --- p.21 / summary --- p.23 / Chapter VII --- final project / major planning strategy --- p.1 / landscape strategy --- p.5 / site planning --- p.7 / volumetrics --- p.8 / functional relationship --- p.9 / circulation --- p.10 / shared use studies --- p.11 / detail studies --- p.13
|
8 |
Kwun Tong civil/cultural complex姚木輝, Yiu, Muk-fai. January 1995 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
9 |
Sham Shui Po Civic ComplexYan, Ching-hung., 殷正雄. January 1997 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
10 |
Redevelopment of government offices at L Albert RoadPang, Yat-hong, Jackson., 彭一康. January 1995 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
Page generated in 0.099 seconds