Spelling suggestions: "subject:"coequality control"" "subject:"coequality coontrol""
1 |
Impementing quality systems in a foundryBosch, Cyril Henry 17 August 2016 (has links)
A project report submitted to the Faculty of
Engineering, University of the Witwatersrand,
Johannesburg, in partial fulfilment of the
requirements for the degree of
Master of Science in Engineering.
Johannesburg, 1991 / he purpose of this project was to introduce an
affective Quality Control Systems into a newly
established foundry. The parent company expressed
concern about the poor quality of locally produced
castings and decided to invest in it's own foundry. As
the company exclusively produces components for the
motor manufacturing industry it was of paramount
importance that the foundry is equipped and run in
accordance to the high manufacturing standards set by
the major motor manufactures. As the Auto Industrial
Group is committed to a total Quality Control programme in line
with the high-tech motor manufactures it is
obvious that the foundry follow suite. The strategy
adopted was to base a Quality management system along the lines of SABS 0157 and to expand it to ensure that all the quality requirements of the customers are accommodated
|
2 |
Do organizations that have reached the excellence level in the Wisconsin Forward Award process benefit from an increase in bottom line results?Seanor, Daniel D. January 2001 (has links) (PDF)
Thesis--PlanB (M.S.)--University of Wisconsin--Stout, 2001. / Includes bibliographical references.
|
3 |
On control chartsAlspach, Carol A. January 1975 (has links)
Thesis (M.A.)--Kutztown State College. / Source: Masters Abstracts International, Volume: 45-06, page: 3169. Typescript. Includes bibliographical references (leaves 46-47).
|
4 |
Process quality models and their application to optimizing quality control proceduresRay, Dev Kumar 08 1900 (has links)
No description available.
|
5 |
Control charts applying a sequential test at fixed sampling intervals with optional sampling at fixed times /Stoumbos, Zachary G., January 1993 (has links)
Thesis (Ph. D.)--Virginia Polytechnic Institute and State University, 1993. / Vita. Abstract. Includes bibliographical references (leaves 239-247). Also available via the Internet.
|
6 |
A robust Shewhart control chart adjustment strategy /Zou, Xueli, January 1993 (has links)
Thesis (Ph. D.)--Virginia Polytechnic Institute and State University, 1993. / Vita. Abstract. Includes bibliographical references (leaves 116-121). Also available via the Internet.
|
7 |
The application of a single control chart for dependent variables in multivariate quality control /Hanson, Robert Alexander, January 1990 (has links)
Thesis (M.S.)--Virginia Polytechnic Institute and State University, 1990. / Vita. Abstract. Includes bibliographical references (leaf 27). Also available via the Internet.
|
8 |
Implementing Kaizen practices in U.S. organizationsLarson, Curtis E. January 1998 (has links) (PDF)
Thesis--PlanB (M.S.)--University of Wisconsin--Stout, 1998. / Field project. Includes bibliographical references.
|
9 |
Production non-conformance : a study on the effective application of root cause investigation tools and corrective action definition techniques on product non-conformance investigations /Gonzalez, Roberto, January 2006 (has links)
Thesis (M.S.) -- Central Connecticut State University, 2006. / Thesis advisor: Paul Resetarits. "... in partial fulfillment of the requirements for the degree of Master of Science in Technology Management." Includes bibliographical references (leaves 67-70). Also available via the World Wide Web.
|
10 |
Optimal allocation of inspection effort under inspection error,Gleason, James F. January 1975 (has links)
Thesis (M.S.)--Ohio State University. / Includes bibliographical references. Available online via OhioLINK's ETD Center.
|
Page generated in 0.0735 seconds