• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Psychographic questionnaires: a comparative review of scales and structures

Fuhr, Kelly January 1900 (has links)
Master of Science / Food Science Institute / Delores Chambers / Psychographic Questionnaires: A Comparative Review of Structures and Scales In recent years there has been a growing trend toward integrating psychographic profiles into sensory studies with the aim of more holistically explaining consumer segmentation and preferences. With this shift in approach have come questions on the nature of psychographic scales and the theoretical implications of their structure. Given the plethora of existing psychographic scales in common practice, the purpose of this review is to give a concise overview in the breadth of structures, with the aim of helping sensory researchers identify the most appropriate scale for their needs. The review begins with a critical comparison of the three most common scale classes: Likert, Semantic Differential, and Behavioral Frequency, and their relative advantages and disadvantages. Following that, a review of psychographic questionnaire design highlights differences from sensory practices, drawing attention to sources of response bias in specific design typologies which may reduce data quality in a product design.
2

Risk Management in Major Construction Joint Venture Projects

Kalyviotis, Nikolaos January 2015 (has links)
The role of risk management in the construction industry is essential due to the complexityand dynamic environment of the projects. To enhance project success, it is important toembed risk management practices in every activity of the project.The research question is “What is the classification of risks of joint ventures projects indeveloping countries and especially in countries that are facing economic crisis?” Theobjective of this thesis work is to assess the risks by creating proper risk probability versusrisk impact matrices and proceed with further analysis and based on the criticality of themand furthermore to allocate the risks and possible bias of the Concession AgreementBased on literature review and the objective of this thesis work, the propositions are thefollowing: “1) All the examined risks have the possibility to exist. 2) Risks, which hugelyimpact joint venture projects, are financial risks. 3) The purpose of the ConstructionContract is to ensure a fair distribution of risks between the parties, determining the parties'rights, duties, responsibilities and obligations in advance. 4) Criticality is an independentvariable from impact and possibility.”Due to the nature of this research and the research objective, the scientific idealimplemented is critical realism. This research is conducted based on quantitative method ofprimary data analysis. A questionnaire was formed in order to be given to the Panel ofExperts from different organizations for the evaluation of the problem.Based on the empirical data and analysis, the author indentified and evaluated the risks ofthe joint venture construction projects in developing countries within the definedenvironment of the consortium, where the state has a specific regal role, based oncriticality, risk probability and risk impact. The analysis of the data was done with the RankReciprocal method (Carr & Zwick, 2007, p.70). In this thesis work, they are identified,individually and also aggregately, the specific risks with high criticality, high probabilityand high impact. The risks of joint venture projects classified with the higher criticality, thehigher probability and the higher impact, aggregately, are: Public Utilities Organizations(P.U.O.) permits delay (due to either Concessionaire's fault, or State's), State defaults (or anExtensive Force Majeure Event creates a State Event of Default), Events of Delay occurduring Design-Construction period affecting that period or the next one (the OperationPeriod), Critical path complications due to Archaeological Surveys revealing antiquities,Delays, inability of State in its obligation to go forth in expropriations. Risk managers canfocus on those risks and ensure the success of risk management and project control.

Page generated in 0.0596 seconds